Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 274.47 106.07 38.65  
1 MURSHIDABAD Berhampore Division I Augmentation of Sadhukhali Zone-I pipe water supply scheme . , SM/15518 Augmentation Replacement of Filter media of Existing AIRP of (Capacity 46 Cum/hr.) with allied work at Sadhukhali Zone-I Water Supply Scheme under Jal Jeevan Mission under Berhampore Division-I, PHEengineering Dte. Assistant Engineer-II ORD/000012/2024-2025 911/BD-I 07/06/2024 30 MS BAPPA ENTERPRISE 17.00 0.00 0 0
2 MURSHIDABAD Berhampore Division I Augmentation of Sadhukhali Zone-I pipe water supply scheme . , SM/15518 Augmentation Formal work order for Augmentation of Sadhukhali Zone-I Piped water supply scheme to accommodate construction of service road , laying of design pipeline and providing FHTC (Functional Household Tap Connection ) under Jal Jeevan Mission in Beldanga-II Block of Murshidabad District under Berhampore Division-I, PHE.Dte. Assistant Engineer-II Junior Engineer-I ORD/000183/2022-2023 1658/BD-I 13/03/2023 120 NOVELTY CONSTRUCTION 181.42 103.40 56.99 75
3 MURSHIDABAD Berhampore Division I Augmentation of Sadhukhali Zone-I pipe water supply scheme . , SM/15518 Augmentation Sinking of 250mm x 150 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Sadhukhali Zone-I Water Supply Scheme in connection with Augmentation work under Berhampore Division - I, P.H.Engineering Dte. Assistant Engineer ORD/000242/2023-2024 939/BD-I 11/10/2023 30 B.R SUPPLIERS 9.00 0.00 0 0
4 MURSHIDABAD Berhampore Division I Augmentation of Sadhukhali Zone-I pipe water supply scheme . , SM/15518 Augmentation Repair And Renovation Works Of OHR (250 Cum) forSadhukhali Zone-I water supply scheme of Beldanga-II block under Berhampore Division-I PHE Dte. in the district Murshidabad. For Augmentation of PWSS under Jal jeevan Mission. Assistant Engineer-II Junior Engineer-I ORD/000253/2023-2024 1014/BD-I 31/10/2023 30 SUKUMAR ROY 7.69 0.00 0 20
5 MURSHIDABAD Berhampore Division I Augmentation of Sadhukhali Zone-I pipe water supply scheme . , SM/15518 Augmentation Route Survey ,Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Jal Swapna for SADHUKHALI Water Supply Scheme of BELDANGA-II Block of Murshidabad District under Berhampore Division-I ,P.H.E Dte. Assistant Engineer-I JE_RAJIB BISWAS ORD/000267/2022-2023 1690/BD-I 14/03/2023 10 TECHVISION 2.67 2.67 100 100
6 MURSHIDABAD Berhampore Division I Augmentation of Sadhukhali Zone-I pipe water supply scheme . , SM/15518 Augmentation SADHUKHALI ZONE-I PWSS to accommodate construction of Boundary Wall under Jal Jivan Mission of BELDANGA-II Block, Murshidabad District under Berhampore Division-I, PHE.Dte. Assistant Engineer-II ORD/000455/2023-2024 459/BD-I 15/03/2024 60 S. K. ENTERPRISE, PROP-SANDIP GHOSH 22.95 0.00 0 0
7 MURSHIDABAD Berhampore Division I Augmentation of Sadhukhali Zone-I pipe water supply scheme . , SM/15518 Augmentation Material Requisition To Resource Division RTOR000086/2023-2024 196/BD-I/21 09/02/2024 Resource Division 33.74 0.00 0 0
Total 274.47 106.07 38.65