Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 417.86 12.22 2.92  
1 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Gaukhana . , SM/15234 Augmentation Repair and renovation of existing Pump House (Head work/2nd site) and Allied Works for Gaukhana ground Water Supply Scheme under Berhampore Division-I, PHE Dte. (Block-Lalgola) Assistant Engineer-I JE_RAJIB BISWAS ORD/000013/2023-2024 60/BD-I 25/04/2023 30 SAIF TRADERS 2.25 1.11 49.33 100
2 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Gaukhana . , SM/15234 Augmentation Sinking of 250mm x 150 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Gaukhana Water Supply Scheme in connection with Augmentation work under Berhampore Division - I, P.H.Engineering Dte. Assistant Engineer JE ORD/000033/2023-2024 125/BD-I 12/05/2023 30 HARUN ALL RASHID & BROTHERS 8.92 3.97 44.51 100
3 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Gaukhana . , SM/15234 Augmentation Augmentation of Gaukhana Piped water supply scheme to accommodate construction of OHR ,Arsenic cum Iron Removal Plant( AIRP) and service road , laying of design pipeline and providing FHTC (Functional Household Tap Connection ) under Jal Jeevan Mission in Lalgola Block of Murshidabad District under Berhampore Division-I,PHE.Dte. Assistant Engineer-I ORD/000153/2023-2024 680/BD-I 10/08/2023 310 ARABINDA GHOSH 317.21 0.00 0 0
4 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Gaukhana . , SM/15234 Augmentation Route Survey ,Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Jal Swapna for GOUKHANA Water Supply Scheme of LALGOLA Block of Murshidabad District under Berhampore Division-I ,P.H.E Dte. Assistant Engineer-I JE ORD/000258/2022-2023 1681/BD-I 14/03/2023 10 ENVIROTECH SOLUTIONS 2.46 2.48 100.81 1
5 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Gaukhana . , SM/15234 Augmentation Repair And Renovation Works Of OHR (90.8 Cum) of Ground Water Based Supply Scheme for Gaukhana of Lalgola block under Berhampore Division-I PHEDte. in the district Murshidabad. For Augmentation of PWSS under Jal jeevan Mission. Assistant Engineer,Assistant Engineer-I JE ORD/000265/2023-2024 987/BD-I 30/10/2023 30 KAKALI ENTERPRISE 6.11 0.00 0 100
6 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Gaukhana . , SM/15234 Augmentation GAUKHANA PWSS to accommodate construction of Boundary Wall under Jal Jivan Mission of LALGOLA Block, Murshidabad District under Berhampore Division-I, PHE.Dte. Assistant Engineer ORD/000428/2023-2024 328/BD-I 29/02/2024 60 SANTA TRADING 22.94 0.00 0 0
7 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Gaukhana . , SM/15234 Augmentation Material Requisition To Resource Division RTOR000011/2024-2025 1510/BD-I/5 12/09/2024 Resource Division 3.44 0.00 0 0
8 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Gaukhana . , SM/15234 Augmentation Material Requisition To Resource Division RTOR000071/2023-2024 201/BD-1/12 10/02/2024 Resource Division 36.30 0.00 0 0
9 MURSHIDABAD Berhampore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Gaukhana . , SM/15234 Augmentation NEW CONNECTION AT GAUKHANA PH-I BILL/00521/2024-2025 170/WBSEDCL-JJM 31/07/2024 WBSEDCL 6.98 0.00 0 0
10 MURSHIDABAD Berhampore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Gaukhana . , SM/15234 Augmentation Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Augmentation in connection to Accommodate FHTC at Pump House No.-I of GAUKHANA ground water based water supply scheme under Block- LALGOLA, Dist. Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/000283/2023-2024 3785/MEDB 03/11/2023 90 DAS ENTERPRISE (CHOA) 11.25 4.66 41.42 10
Total 417.86 12.22 2.92