Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 400.23 0 0  
1 MURSHIDABAD Berhampore Division I Augmentation of Ground water based pipe water supply scheme for Bansgara Zone-III , SM/15231 Augmentation Sinking of 250mm x 150 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Bansgara Zone-III Water Supply Scheme in connection with Augmentation work under Berhampore Division - I, P.H.Engineering Dte ( For 2 nos Tubewell) Assistant Engineer,Assistant Engineer-I JE ORD/000036/2023-2024 138/BD-I 12/05/2023 30 HARUN ALL RASHID & BROTHERS 17.66 0.00 0 0
2 MURSHIDABAD Berhampore Division I Augmentation of Ground water based pipe water supply scheme for Bansgara Zone-III , SM/15231 Augmentation Formal work order for Augmentation of Bansgara Zone-III Piped water supply scheme to accommodate construction of OHR, Arsenic cum Iron Removal Plant (AIRP), pump house, boundary wall and service road , laying of design pipeline and providing FHTC (Functional Household Tap Connection ) under Jal Jeevan Mission in Lalgola Block of Murshidabad District under Berhampore Division-I, PHE.Dte. Assistant Engineer-I ORD/000117/2023-2024 463/BD-I 17/07/2023 365 SAMBHUNATH ROY 291.11 0.00 0 0
3 MURSHIDABAD Berhampore Division I Augmentation of Ground water based pipe water supply scheme for Bansgara Zone-III , SM/15231 Augmentation Continuation work order for Route Survey ,Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Jal Swapna for BANSGARA Water Supply Scheme of LALGOLA Block of Murshidabad District under Berhampore Division-I ,P.H.E Dte. Assistant Engineer-I JE_Pravin Kumar Gupta ORD/000297/2022-2023 1742/BD-I 22/03/2023 10 ENVIROTECH SOLUTIONS 2.55 0.00 0 0
4 MURSHIDABAD Berhampore Division I Augmentation of Ground water based pipe water supply scheme for Bansgara Zone-III , SM/15231 Augmentation Material Requisition To Resource Division RTOR000082/2023-2024 201/BD-1/23 10/02/2024 Resource Division 66.74 0.00 0 0
5 MURSHIDABAD Berhampore Mechanical Augmentation of Ground water based pipe water supply scheme for Bansgara Zone-III , SM/15231 Augmentation Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Augumentation in connection to Accommodate FHTC at Pump House No.-I and II ,Zone-III under Bansgara ground water based water supply scheme under Block_ Lalgola Dist. - Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/000147/2023-2024 632/MEDB 02/02/2024 90 M/S K.P. PRAMANIK 22.17 0.00 0 0
Total 400.22 0.00 0