Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 21,867.46 12.65 0.06  
1 MURSHIDABAD Central Drilling Augmentation of Bali Zone-III pipe water supply scheme . , SM/15228 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
2 MURSHIDABAD Berhampore Division I Augmentation of Bali Zone-III pipe water supply scheme . , SM/15228 Augmentation Planning,Design,Investigation,Construction,Erection,Installation,Completion testing and Commissioning in all respect of entire units of Arsenic cum Iron Removal Plant (AIRP) of different capacities capable of removing arsenic & Iron Present in Ground Water in different concentration to acceptable limit as per latest BIS Code on basis of departmental process drawing (MODIFIED SUJAPUR SADIPUR) along with 5 (Five) years Operation & Maintenance after successful completion of 3 (three) months Trial Run of "Augmentation of Bali Zone-III" ground water supply scheme in NAWDA Block,under Berhampore Division-I, P.H.E Dte(Capacity-57.00 Cum/hr.) Type-4: Partial Gravity System with Pressure Filter and Pressurized Upflow Polishing Assistant Engineer-II ORD/000030/2024-2025 993/BD-I 20/06/2024 365 EFFLUENT & WATER TREATMENT ENGINEERS (P) LTD 165.61 0.00 0 0
3 MURSHIDABAD Berhampore Division I Augmentation of Bali Zone-III pipe water supply scheme . , SM/15228 Augmentation Augmentation of Bali Zone-III Piped water supply scheme to accommodate construction of OHR , laying of design pipeline and providing FHTC (Functional Household Tap Connection ) under Jal Jeevan Mission in Nawda Block of Murshidabad District under Berhampore Division-I,PHE.Dte. Assistant Engineer-II JE ORD/000255/2023-2024 972/BD-I 18/10/2023 365 BISWAJYOTI BHATTACHARYYA 322.80 12.65 3.92 40
4 MURSHIDABAD Berhampore Division I Augmentation of Bali Zone-III pipe water supply scheme . , SM/15228 Augmentation BALI ZONE-III PWSS to accommodate construction of Boundary Wall under Jal Jivan Mission of NAWDA Block, Murshidabad District under Berhampore Division-I, PHE.Dte Assistant Engineer-II ORD/000447/2023-2024 450/BD-I 15/03/2024 60 ANUPA ENTERPRISE 21.03 0.00 0 0
5 MURSHIDABAD Berhampore Division I Augmentation of Bali Zone-III pipe water supply scheme . , SM/15228 Augmentation Material Requisition To Resource Division RTOR000057/2023-2024 196/BD-I/19 09/02/2024 Resource Division 18.26 0.00 0 0
Total 21,867.46 12.65 0.06