Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 243.92 1.37 0.56  
1 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Kajipara Zone- I Piped Water Supply Scheme. , SM/14950 Augmentation Improvement of OHR (450 Cum) of Ground Water Based Supply Scheme for Augmentation of Kazipara Zone-I of Jalangi block under JJM under Berhampore Division-I PHE Dte. in the district Murshidabad. Assistant Engineer JE ORD/000021/2024-2025 934/BD-I 10/06/2024 30 M/S. MONDAL ENTERPRISE 11.42 0.00 0 0
2 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Kajipara Zone- I Piped Water Supply Scheme. , SM/14950 Augmentation Construction of Boundary Wall with Main Entrance gate and barbed wire facing and service road for approach at Augmentation of KAZIPARA ZONE-I PWSS of Raninagar-I Block under Jal Jeevan Mission of Murshidabad District under Berhampore Division-I, PHE Dte. Assistant Engineer JE_Pravin Kumar Gupta ORD/000041/2024-2025 1059/BD-I 03/07/2024 45 MUNNA AGROTECH ENTERPRISE 16.50 0.00 0 0
3 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Kajipara Zone- I Piped Water Supply Scheme. , SM/14950 Augmentation Augmentation of Kazipara Zone_I Piped water supply scheme for laying of design pipeline and providing FHTC (Functional Household Tap Connection ) under Jal Jeevan Mission in Jalangi Block of Murshidabad District under Berhampore Division-I,PHE.Dte. Assistant Engineer JE ORD/000121/2023-2024 505/BD-I 24/07/2023 180 M/S S.DAS & ENTERPRISE 178.00 0.00 0 0
4 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Kajipara Zone- I Piped Water Supply Scheme. , SM/14950 Augmentation Route Survey ,Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Jal Swapna for KAJIPARA Water Supply Scheme of JALANGI Block of Murshidabad District under Berhampore Division-I ,P.H.E Dte. Assistant Engineer-I JE_Pravin Kumar Gupta ORD/000280/2022-2023 1764/BD-I 24/03/2023 10 M/S SOBHA & CO 2.74 1.37 50 100
5 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Kajipara Zone- I Piped Water Supply Scheme. , SM/14950 Augmentation Material Requisition To Resource Division RTOR000014/2023-2024 61/BD-1/12 27/04/2023 Resource Division 35.26 0.00 0 0
Total 243.92 1.37 0.56