Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 869.13 29.7 3.42  
1 MURSHIDABAD Central Drilling Augmentation of Ground Water Based Piped Water Supply Scheme for Udaynagar Diar . , SM/14739 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) ORD/000215/2023-2024 2235/CDD 11/03/2024 150 JHARGRAM SPV PRIVATE LIMITED 720.23 0.00 0 10
2 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Udaynagar Diar . , SM/14739 Augmentation Replacement of Filter media of Existing AIRP of (Capacity 21.62 Cum/hr.) with allied work at Udaynagar Diar Water Supply Scheme under Jal Jeevan Mission of Jalangi under Berhampore Division-I, PHEengineering Dte. Assistant Engineer ORD/000016/2024-2025 924/BD-I 07/06/2024 30 SOUNAK ENTERPRISE 15.21 0.00 0 0
3 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Udaynagar Diar . , SM/14739 Augmentation Balance work of Boundary Wall at Augmentation of Udaynagar Diar PWSS of Jalangi Block under Jal Jeevan Mission of Murshidabad District under Berhampore Division-I, PHE Dte. Assistant Engineer ORD/000028/2024-2025 984/BD-I 19/06/2024 45 BISWAS CONSTRUCTION 11.94 0.00 0 0
4 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Udaynagar Diar . , SM/14739 Augmentation Augmentation of Udaynagar Diar Piped water supply scheme to accommodate construction of Pump House ,boundary wall and service road , laying of design pipeline and providing FHTC (Functional Household Tap Connection ) under Jal Jeevan Mission in Jalangi Block of Murshidabad District under Berhampore Division-I,PHE.Dte. Assistant Engineer JE ORD/000214/2022-2023 1551/BD-I 17/02/2023 180 BISWAS CONSTRUCTION 82.74 27.22 32.9 37
5 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Udaynagar Diar . , SM/14739 Augmentation Route Survey ,Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Jal Swapna for UDAYNAGARDIAR Water Supply Scheme of JALANGI Block of Murshidabad District under Berhampore Division-I ,P.H.E Dte. Assistant Engineer-I JE_Pravin Kumar Gupta ORD/000281/2022-2023 1559/BD-I 20/02/2023 10 M/S SOBHA & CO 2.53 2.48 98.02 100
6 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Udaynagar Diar . , SM/14739 Augmentation Repair And Renovation Works Of OHR (100 Cum) of Ground Water Based Supply Scheme for UdaynagarDiar of Jalangi block under Berhampore Division-I PHEDte. in the district Murshidabad. Augmentation of PWSS under Jal jeevan Mission. ORD/000290/2023-2024 1037/BD-I 03/11/2023 30 PRANAB KUMAR SAHA 6.34 0.00 0 0
7 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Udaynagar Diar . , SM/14739 Augmentation Material Requisition To Resource Division RTOR000013/2023-2024 61/BD-1/11 27/04/2023 Resource Division 26.29 0.00 0 0
8 MURSHIDABAD Berhampore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Udaynagar Diar . , SM/14739 Augmentation AT UDAY NAGAR DIAR PH 2 ID 304244356 BILL/01480/2023-2024 373/WBSEDCL-JJM 21/02/2024 WBSEDCL 3.85 0.00 0 0
Total 869.14 29.71 3.42