Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 312.8 31.77 10.16  
1 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Bansgara Zone- II. , SM/14734 Augmentation Augmentation of Bansgara Zone-II Piped water supply scheme to accommodate construction of Arsenic cum Iron Removal Plant(AIRP), pump house, boundary wall and service road , laying of design pipeline and providing FHTC (Functional Household Tap Connection ) under Jal Jeevan Mission in Raninagar-II Block of Murshidabad District under Berhampore Division-I, PHE.Dte. Assistant Engineer Junior Engineer-II ORD/000025/2023-2024 313/BD-I 14/06/2023 120 MODERN CONSTRUCTION 261.29 24.24 9.28 27
2 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Bansgara Zone- II. , SM/14734 Augmentation Route Survey ,Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Jal Swapna for BANSGARA ZONE-II Water Supply Scheme of RANINAGAR-II Block of Murshidabad District under Berhampore Division-I ,P.H.E Dte. Assistant Engineer-I JE_Pravin Kumar Gupta ORD/000277/2022-2023 1760/BD-I 24/03/2023 10 M/S SOBHA & CO 2.46 2.46 100 100
3 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Bansgara Zone- II. , SM/14734 Augmentation Sinking of 300mm x 200 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Bansgara Zone-II Water Supply Scheme in connection with Augmentation work under Berhampore Division - I, P.H.Engineering Dte Assistant Engineer Junior Engineer-II ORD/000313/2023-2024 1149/BD-I 04/12/2023 30 NADIA TUBEWELLS 11.56 5.07 43.86 100
4 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Bansgara Zone- II. , SM/14734 Augmentation Material Requisition To Resource Division RTOR000038/2023-2024 194/BD-I/7 09/02/2024 Resource Division 32.78 0.00 0 0
5 MURSHIDABAD Berhampore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Bansgara Zone- II. , SM/14734 Augmentation load enhancement bansgara z2 ph 1 BILL/01597/2023-2024 null 05/03/2024 WBSEDCL 1.80 0.00 0 0
6 MURSHIDABAD Berhampore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Bansgara Zone- II. , SM/14734 Augmentation LOAD ENHANCEMENT AT BANSGARA Z2 PH1 ID 312397840 BILL/01637/2023-2024 481/WBSEDCL-JJM 21/03/2024 WBSEDCL 1.80 0.00 0 0
7 MURSHIDABAD Berhampore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Bansgara Zone- II. , SM/14734 Augmentation LOAD ENHANCEMENT BANSGARA AIRP ID 3004571720 BILL/01638/2023-2024 482/WBSEDCL-JJM 21/03/2024 WBSEDCL 1.11 0.00 0 0
Total 312.80 31.77 10.16