Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 974.95 107.13 10.99  
1 MURSHIDABAD Central Drilling Augmentation of Ground Water Based Piped Water Supply Scheme for Dakshin Gopalpur . , SM/14066 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) ORD/000215/2023-2024 2235/CDD 11/03/2024 150 JHARGRAM SPV PRIVATE LIMITED 720.23 0.00 0 10
2 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Dakshin Gopalpur . , SM/14066 Augmentation Improvement of OHR (136.2 Cum) of Ground Water Based Supply Scheme for Augmentation of Dakshin Gopalpur of Raninagar-I block under JJM under Berhampore Division-I PHE Dte. in the district Murshidabad. Assistant Engineer Junior Engineer-II ORD/000002/2024-2025 890/BD-I 06/06/2024 30 RAJEN DAS 7.27 0.00 0 0
3 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Dakshin Gopalpur . , SM/14066 Augmentation Construction of Boundary Wall with Main Entrance gate and barbed wire facing and service road for approach at Augmentation of Dakshin Gopalpur PWSS of Raninagar-I Block under Jal Jeevan Mission of Murshidabad District under Berhampore Division-I, PHE Dte. Assistant Engineer ORD/000050/2024-2025 1113/BD-I 10/07/2024 45 KHANDAKAR CONSTRUCTION 22.05 0.00 0 0
4 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Dakshin Gopalpur . , SM/14066 Augmentation Augmentation of DAKSHIN GOPALPUR Piped water supply scheme for laying of design pipeline, rising main and providing FHTC (Functional Household Tap Connection) under Jal Jeevan Mission in Raninagar-I Block of Murshidabad District under Berhampore Division-I, PHE Dte. Assistant Engineer Junior Engineer-II ORD/000241/2022-2023 1598/BD-I 28/02/2023 180 GOUTAM CHAKRABORTY 134.60 88.66 65.87 32
5 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Dakshin Gopalpur . , SM/14066 Augmentation Route Survey ,Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Jal Swapna for DAKSHIN GOPALPUR Water Supply Scheme of RANINAGAR-I Block of Murshidabad District under Berhampore Division-I ,P.H.E Dte. Assistant Engineer-I JE_Pravin Kumar Gupta ORD/000275/2022-2023 1504/BD-I 07/02/2023 10 M/S SOBHA & CO 2.67 2.57 96.25 100
6 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Dakshin Gopalpur . , SM/14066 Augmentation Renovation for Modified Sujapur Sadipur Model after washing of AIRP (Capacity 29.06 Cum/hr.) at Dakshin Gopalpur Water Supply Scheme under Jal Jivan Mission of Raninagar-I Block under Raghunathganj Sub-Division under Berhampore Division-I, PHE Dte. Assistant Engineer Junior Engineer-II ORD/000439/2023-2024 410/BD-I 13/03/2024 60 SUMAN ENTERPRISE AND SUMAN AQUA 51.69 15.90 30.76 75
7 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Dakshin Gopalpur . , SM/14066 Augmentation Material Requisition To Resource Division RTOR000020/2023-2024 194/BD-I/4 09/02/2024 Resource Division 36.44 0.00 0 0
Total 974.96 107.13 10.99