Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 508.49 195.03 38.35  
1 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Faridpur , SM/12739 Augmentation Improvement of OHR (350 Cum) of Ground Water Based Supply Scheme for Augmentation of Faridpur water supply scheme of Bhagwangola-II block under JJM under Berhampore Division-I PHE Dte. in the district Murshidabad. Assistant Engineer-I JE_RAJIB BISWAS ORD/000005/2024-2025 893/BD-I 06/06/2024 30 SK CONSTRUCTION VILL-MAJDIA, P.O.-BERHAMPORE 8.56 0.00 0 0
2 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Faridpur , SM/12739 Augmentation Sinking of 250mm x 150 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Faridpur Water Supply Scheme in connection with Augmentation work under Berhampore Division - I, P.H.Engineering Dte. Assistant Engineer-I ORD/000041/2023-2024 44/BD-I 24/04/2023 30 SUJIT KUMAR SAHA 8.99 0.00 0 0
3 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Faridpur , SM/12739 Augmentation Repair and renovation of existing Pump House (Head work/2nd site) and Allied Works for Foridpur ground Water Supply Scheme" under Berhampore Division-I, PHE Dte. (Block-Bhagwangola-II) Assistant Engineer-I JE ORD/000114/2022-2023 1411/BD-I 04/01/2023 10 S. K. ENTERPRISE, PROP-SANDIP GHOSH 2.23 1.41 63.23 100
4 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Faridpur , SM/12739 Augmentation Formal work order for Augmentation of FARIDPUR Piped water supply scheme to accommodate construction of OHR, pump house ,boundary wall,service road , laying of design pipeline and providing FHTC (Functional Household Tap Connection) under Jal Jeevan Mission in Bhagwangola-II Block of Murshidabad District under Berhampore Division-I,PHE.Dte. Assistant Engineer-I JE_RAJIB BISWAS ORD/000140/2022-2023 1450/BD-I 17/01/2023 365 BIJOY CHOWDHURY 435.90 186.18 42.71 56
5 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Faridpur , SM/12739 Augmentation Route Survey ,Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Jal Swapna for FARIDPUR Water Supply Scheme of BHAGAWANGOLA-II Block of Murshidabad District under Berhampore Division-I ,P.H.E Dte. Assistant Engineer-I JE ORD/000886/2021-2022 269/BD-I 08/03/2022 10 CIVIL & ENVIRONMENTAL ENGINEERING DESIGN SOLUTIONS 2.70 2.70 100 1
6 MURSHIDABAD Berhampore Division I Augmentation of Ground Water Based Piped Water Supply Scheme for Faridpur , SM/12739 Augmentation Material Requisition To Resource Division RTOR000049/2023-2024 196/BD-I/16 09/02/2024 Resource Division 38.70 0.00 0 0
7 MURSHIDABAD Berhampore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Faridpur , SM/12739 Augmentation Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Augmentation in connection to Accommodate FHTC at Pump House No.-I of Faridpur ground water based water supply scheme under Block- Bhagawangola-II, Dist. Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/000058/2023-2024 4333/MEDB 29/12/2023 90 ASSOCIATED ELECTRICAL CO. 11.41 4.74 41.54 20
Total 508.49 195.02 38.35