Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 22,287.17 0 0  
1 MURSHIDABAD Samserganj Murshidabad Division ANUP NAGAR ( CT ) PIPED WATER SUPPLY SCHEME. , SM/18556 New ANUP NAGAR CT PWSS to accommodate FHTC, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jeevan Mission of SAMSERGANJ Block, Murshidabad District under Jangipur Sub Division Murshidabad Division, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 2 ORD/000232/2023-2024 2404/MURD 07/08/2023 180 SUJIT KUMAR SAHA 428.30 0.00 0 0
2 MURSHIDABAD Samserganj Murshidabad Division ANUP NAGAR ( CT ) PIPED WATER SUPPLY SCHEME. , SM/18556 New ANUPNAGAR CT PWSS to accommodate FHTC, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jeevan Mission of SAMSERGANJ Block, Murshidabad District under Jangipur SubDivision Murshidabad Division, PHE Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 2 ORD/000250/2023-2024 2464/MURD 09/08/2023 365 M/S RUBIET HOSSAIN 230.08 0.00 0 0
3 MURSHIDABAD Samserganj Murshidabad Division ANUP NAGAR ( CT ) PIPED WATER SUPPLY SCHEME. , SM/18556 New Preparation of DPR for drinking water supply scheme to facilitate 63 Nos (List Enclosed) Uncovered mouzas of Jangipur Sub-Division [Raghunathganj-I, Raghunathganj-II, Suti-I, Suti-II, Farakka, Samserganj Block] which includes Route survey using DGPS/Drone/Total Station etc. & all related field work for technical data collection, Household Survey using PHED developed mobile application, Preparation and supply of Geo reference drawing / layout plan of the zone-wise Command area of water distribution and transmission Pipeline network of the schemes showing all requisite features, design of Pipeline Network. Design (if necessary), drawing & estimation of all necessary structures, Preparation & Submission of DPR booklets & Bid Document ( in both hard and soft copies) including Preparation of Booklet for SLSSC for individual PWSS, all complete in consultation with the EIC under Murshidabad Division P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 6 ORD/000578/2022-2023 3001/MURD 11/11/2022 45 RADIANT 253.25 0.00 0 100
4 MURSHIDABAD Samserganj Murshidabad Division ANUP NAGAR ( CT ) PIPED WATER SUPPLY SCHEME. , SM/18556 New Material Requisition To Resource Division RTOR000289/2023-2024 1230/MURD/32 04/05/2023 Resource Division 35.78 0.00 0 0
5 MURSHIDABAD Samserganj Central Drilling ANUP NAGAR ( CT ) PIPED WATER SUPPLY SCHEME. , SM/18556 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
Total 22,287.18 0.00 0