Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 896.17 0 0  
1 MURSHIDABAD Raghunathganj - II Murshidabad Division KHODARAMPUR (CT) PIPED WATER SUPPLY SCHEME. , SM/16391 New Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at KHODARAMPUR (CT) Water Supply Scheme at Head Work Site, 2nd Site site at Raghunathganj-II Block under Murshidabad Division, P.H. Engineering Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 6 ORD/000369/2023-2024 2721/MURD 29/08/2023 21 INDRAJIT MAZUMDAR 18.44 0.00 0 0
2 MURSHIDABAD Raghunathganj - II Murshidabad Division KHODARAMPUR (CT) PIPED WATER SUPPLY SCHEME. , SM/16391 New Preparation of DPR for drinking water supply scheme to facilitate 63 Nos (List Enclosed) Uncovered mouzas of Jangipur Sub-Division [Raghunathganj-I, Raghunathganj-II, Suti-I, Suti-II, Farakka, Samserganj Block] which includes Route survey using DGPS/Drone/Total Station etc. & all related field work for technical data collection, Household Survey using PHED developed mobile application, Preparation and supply of Geo reference drawing / layout plan of the zone-wise Command area of water distribution and transmission Pipeline network of the schemes showing all requisite features, design of Pipeline Network. Design (if necessary), drawing & estimation of all necessary structures, Preparation & Submission of DPR booklets & Bid Document ( in both hard and soft copies) including Preparation of Booklet for SLSSC for individual PWSS, all complete in consultation with the EIC under Murshidabad Division P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 6 ORD/000578/2022-2023 3001/MURD 11/11/2022 45 RADIANT 253.25 0.00 0 100
3 MURSHIDABAD Raghunathganj - II Murshidabad Division KHODARAMPUR (CT) PIPED WATER SUPPLY SCHEME. , SM/16391 New Formal work order for Khodarampur CT PWSS Construction OHR, Pump House Cum Chlorine Room, boundary wall and service road, under Jal Jivan Mission, Block- Raghunathganj-II of Jangipur Sub-Division, Murshidabad District under Murshidabad Division, PHE.Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 6 ORD/000816/2022-2023 674/MURD 09/03/2023 365 R.K. CONSTRUCTTION 227.03 0.00 0 0
4 MURSHIDABAD Raghunathganj - II Murshidabad Division KHODARAMPUR (CT) PIPED WATER SUPPLY SCHEME. , SM/16391 New Khodarampur CT PWSS to accommodate FHTC, Laying Distribution System, Rising Main, under Jal Jivan Mission, Block- Raghunathganj-II of Jangipur Sub-Division, Murshidabad District under Murshidabad Division, PHE.Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 6 ORD/000894/2022-2023 930/MURD 31/03/2023 180 TEKNO ENTERPRISE 345.69 0.00 0 0
5 MURSHIDABAD Raghunathganj - II Murshidabad Division KHODARAMPUR (CT) PIPED WATER SUPPLY SCHEME. , SM/16391 New Material Requisition To Resource Division RTOR000283/2023-2024 1230/MURD/25 04/05/2023 Resource Division 29.19 0.00 0 0
6 MURSHIDABAD Raghunathganj - II Berhampore Mechanical KHODARAMPUR (CT) PIPED WATER SUPPLY SCHEME. , SM/16391 New Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Newly Sunk Tube Well in connection to Accommodate FHTC at Pump House No.-I & II under KHODARAMPUR(CT) ground water based water supply scheme under Block_ Raghunathganj- II Dist. - Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/001434/2023-2024 4314/MEDB 29/12/2023 90 M/S S. G. ENTERPRISE 22.57 0.00 0 0
Total 896.16 0.00 0