Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 499.7 11.77 2.36  
1 MURSHIDABAD Kandi Murshidabad Division MOLLA PIPED WATER SUPPLY SCHEME , SM/14947 New Continuation work order for Wall writing on smooth, durable wall surface (preferably of Govt. premises/Boundary wall) by cleaning the surface thoroughly, removing old paints, preparing with one coat good quality exterior primer and painting the surface with best quality synthetic enamel paint of approved shed and writing IEC message along with logo, picture etc of multiple colour as will be supplied by PHE Dte. by engaging skilled artist and helper artist in different location within the district of Murshidabad all complete as per direction of EIC. ASSISTANT ENGINEER,ASSISTANT ENGINEER (HQ) JUNIOR ENGINEER ORD/000008/2024-2025 1641/MURD 29/05/2024 60 IMAGIN 95.53 0.00 0 0
2 MURSHIDABAD Kandi Murshidabad Division MOLLA PIPED WATER SUPPLY SCHEME , SM/14947 New Sinking of 02(Two) Nos 250mm x 150 mm dia tube well 100.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at MOLLA PWSS at Head Work Site & 2nd Tube Well Site in Kandi Block under Kandi Sub-Division, Murshidabad Division,P.H.Engineering Dte. ASSISTANT ENGINEER Junior Engineer, Estimating Section ORD/000742/2022-2023 381/MURD 10/02/2023 45 NADIA TUBEWELLS 16.81 3.79 22.55 95
3 MURSHIDABAD Kandi Murshidabad Division MOLLA PIPED WATER SUPPLY SCHEME , SM/14947 New Formal Work Order For Construction of 150 Cum OHR, Pump House at Head Work Site & 2nd Tube well site , Laying Distribution System, Rising Main, FHTC, Boundary wall of MOLLA PWSS in Kandi Block , Kandi Sub-Division under Murshidabad Division ,PHE.Dte. ( Scheme ID -PH222362345S000) [(i)Amount for LDS , R.Main & FHTC: Rs.1,98,91,791.00 & (ii) Amount for OHR, Boundwary Wall & Pump House : Rs. 1,23,31,559.00] ASSISTANT ENGINEER JUNIOR ENGINEER ESTIMATING SECTION ORD/000749/2022-2023 415/MURD 15/02/2023 365 M/S NIRAPADA BHATTACHARJEE 322.07 7.98 2.48 5
4 MURSHIDABAD Kandi Murshidabad Division MOLLA PIPED WATER SUPPLY SCHEME , SM/14947 New Material Requisition To Resource Division RTOR000009/2023-2024 1210/MURD/42 02/05/2023 Resource Division 32.60 0.00 0 0
5 MURSHIDABAD Kandi Berhampore Mechanical MOLLA PIPED WATER SUPPLY SCHEME , SM/14947 New AT MOLLA PH 1 ID 304252903 BILL/01466/2023-2024 358/WBSEDCL-JJM 20/02/2024 WBSEDCL 3.88 0.00 0 0
6 MURSHIDABAD Kandi Berhampore Mechanical MOLLA PIPED WATER SUPPLY SCHEME , SM/14947 New AT MOLLA PH2 ID 304252910 BILL/01468/2023-2024 359/WBSEDCL-JJM 20/02/2024 WBSEDCL 5.41 0.00 0 0
7 MURSHIDABAD Kandi Berhampore Mechanical MOLLA PIPED WATER SUPPLY SCHEME , SM/14947 New Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Newly Sunk Tube Well in connection to Accommodate FHTC at Pump House No.-I & II under MOLLA ground water based water supply scheme under Block_ Kandi, Dist. - Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-II Junior engineer-II ORD/000101/2023-2024 1891/MEDB 16/06/2023 90 S.P. ENTERPRISE (SILIGURI) 23.40 0.00 0 0
Total 499.70 11.77 2.36