Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 620.43 19.35 3.12  
1 MURSHIDABAD Murshidabad Division Augmentation of Ground Water Based Piped Water Supply Scheme for Bele Block - Khargram , Dist- Murshidabad. , SM/14632 Augmentation Continuation work order for Wall writing on smooth, durable wall surface (preferably of Govt. premises/Boundary wall) by cleaning the surface thoroughly, removing old paints, preparing with one coat good quality exterior primer and painting the surface with best quality synthetic enamel paint of approved shed and writing IEC message along with logo, picture etc of multiple colour as will be supplied by PHE Dte. by engaging skilled artist and helper artist in different location within the district of Murshidabad all complete as per direction of EIC. ASSISTANT ENGINEER,ASSISTANT ENGINEER (HQ) JUNIOR ENGINEER ORD/000008/2024-2025 1641/MURD 29/05/2024 60 IMAGIN 95.53 0.00 0 0
2 MURSHIDABAD Murshidabad Division Augmentation of Ground Water Based Piped Water Supply Scheme for Bele Block - Khargram , Dist- Murshidabad. , SM/14632 Augmentation Laying Distribution System, Rising Main Connection, FHTC, Repairing of Existing OHR, Pump House, Construction of New Boundary Wall for Augmentation of BELE Ground water based Piped water supply scheme in Khargram Block under Murshidabad Division, PHE. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000027/2023-2024 1076/MURD 19/04/2023 365 M/S. BIMALENDU BOSE 270.95 14.02 5.17 10
3 MURSHIDABAD Murshidabad Division Augmentation of Ground Water Based Piped Water Supply Scheme for Bele Block - Khargram , Dist- Murshidabad. , SM/14632 Augmentation Sinking of 01 (One) No. of 300 mm x 200 mm dia tube well i.e. TW-III of 90.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Bele & adjoining mouzas Water Supply Scheme at 3rd work site at K h a r g r a m Block under Murshidabad Division, P.H.Engineering Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000032/2023-2024 1107/MURD 24/04/2023 20 SARKAR WATER SUPPLY AGENCY 10.68 0.00 0 100
4 MURSHIDABAD Murshidabad Division Augmentation of Ground Water Based Piped Water Supply Scheme for Bele Block - Khargram , Dist- Murshidabad. , SM/14632 Augmentation Preparation of D.P.R Consultancy work Augmentation/Augmentation with Retrofitting in connection with the Functional House Hold TapConnection of 29(Twenty Nine) nos existing commisioned PWSS Kandi, Burwan, Khargram, Bharatpur-I & II Block of Kandi Sub-Division under Murshidabad Division P.H.E. Dte. Name of Schemes-Bahara, Mahalandi Zone-I, Zone-II, Bhalkundi Zone-I, Zone-II, Zone-III, Bele,Nagar Zone-I, Zone-II, Bharatpur Zone-I(A), Zone-I(B), Zone-II(A), Zone-II(B), Dakshinkanda Zone-IA, Zone-IB, Zone-II, Kagram,Tenya Zone-I, Zone-II, Zone-III, Salar Zone-IA, Zone-IB, Zone-IIA, Zone-IIB, Panchthupi Zone-I, Zone-II, Zone-III, Burwan Zone-I, Zone-II Water Supply Schemes of Kandi Sub- Division under Murshidabad Division. ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000396/2023-2024 2789/MURD 04/09/2023 20 GEOTECHNICAL ENGINEERS CONSORTIUM (PROP:MANASIJ DUTTA) 74.87 0.00 0 20
5 MURSHIDABAD Murshidabad Division Augmentation of Ground Water Based Piped Water Supply Scheme for Bele Block - Khargram , Dist- Murshidabad. , SM/14632 Augmentation Preparation of D.P.R Consultancy work ( Augmentation/With Retrofitting/Retrofitting Only) in connection with the Functional House Hold Tap Connection of 12(Twelve) Nos Existing commissioned PWSS of Kandi Sub-Division under Murshidabad Division P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/001470/2021-2022 285/MURD 03/02/2022 60 GEOTECHNICAL ENGINEERS CONSORTIUM (PROP:MANASIJ DUTTA) 89.28 5.33 5.97 76
6 MURSHIDABAD Murshidabad Division Augmentation of Ground Water Based Piped Water Supply Scheme for Bele Block - Khargram , Dist- Murshidabad. , SM/14632 Augmentation Material Requisition To Resource Division RTOR000060/2022-2023 1936/MURD/1 18/07/2023 Resource Division 30.08 0.00 0 0
7 MURSHIDABAD Murshidabad Division Augmentation of Ground Water Based Piped Water Supply Scheme for Bele Block - Khargram , Dist- Murshidabad. , SM/14632 Augmentation Material Requisition To Resource Division RTOR000315/2023-2024 1936/MURD/2 18/07/2023 Resource Division 2.74 0.00 0 0
8 MURSHIDABAD Berhampore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Bele Block - Khargram , Dist- Murshidabad. , SM/14632 Augmentation Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Augmentation in connection to Accommodate FHTC at Pump House No.-I of KHARGRAM ground water based water supply scheme under Block- KHARGRAM Dist. Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-II Junior engineer-II ORD/000056/2023-2024 1896/MEDB 16/06/2023 90 DAS ENTERPRISE (CHOA) 12.27 0.00 0 0
9 MURSHIDABAD Berhampore Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for Bele Block - Khargram , Dist- Murshidabad. , SM/14632 Augmentation Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Augumentation in connection to Accommodate FHTC at Pump House No.-I ,II & III under BELE ground water based water supply scheme under Block_ Khargram Dist. - Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/000675/2023-2024 4298/MEDB 29/12/2023 90 ASSOCIATED ELECTRICAL CO. 34.03 0.00 0 0
Total 620.43 19.35 3.12