Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 431.76 17.15 3.97  
1 MURSHIDABAD Murshidabad Division AUGMENTATION OF GROUND WATER BASED RATURI ZONE-I PWSS SUTI-I BLOCK WITHIN MURSHIDABAD DISTRICT UNDER MURSHIDABAD DIVISION, PHE DTE. , SM/13997 Augmentation Rectification work from Raturi to Kalinagar in the road of Dangapara more to Raturi via HILORA, Kalinagar Road under berhampore Division-I PWD during the year of 2023-2024. BILL/01020/2023-2024 468-MSD/2023-24 04/01/2024 EXECUTIVE ENGINEER, PWD, BERHAMPORE DIVISION-I 78.16 0.00 0 0
2 MURSHIDABAD Murshidabad Division AUGMENTATION OF GROUND WATER BASED RATURI ZONE-I PWSS SUTI-I BLOCK WITHIN MURSHIDABAD DISTRICT UNDER MURSHIDABAD DIVISION, PHE DTE. , SM/13997 Augmentation Providing FHTC of 1415 nos. household, Laying of Rising Main, Repair & Renovation of RCC 130 Cum OHR, special repair and renovation of existing 2 (Two) Nos Pump House and Allied Works Augmentation work of Raturi (Zone-I) PWSS in SUTI-I Block under Murshidabad Division, PHE. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 2 ORD/000085/2023-2024 1455/MURD 01/06/2023 180 R.M. BHATTA 91.23 12.74 13.96 15
3 MURSHIDABAD Murshidabad Division AUGMENTATION OF GROUND WATER BASED RATURI ZONE-I PWSS SUTI-I BLOCK WITHIN MURSHIDABAD DISTRICT UNDER MURSHIDABAD DIVISION, PHE DTE. , SM/13997 Augmentation Sinking of 2NOS. 300mm x 200 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Raturi Zone-II Water Supply Scheme and Bahutuli Water Supply Scheme under Murshidabad Division, P.H.Engineering Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 2,Junior Engineer 3 ORD/000105/2024-2025 2195/MURD 31/07/2024 30 SARKAR WATER SUPPLY AGENCY 23.56 0.00 0 0
4 MURSHIDABAD Murshidabad Division AUGMENTATION OF GROUND WATER BASED RATURI ZONE-I PWSS SUTI-I BLOCK WITHIN MURSHIDABAD DISTRICT UNDER MURSHIDABAD DIVISION, PHE DTE. , SM/13997 Augmentation Preparation of D.P.R Consultancy work ( Augmentation/With Retrofitting/Retrofitting Only) in connection with the Functional House Hold Tap Connection of 13(Thirteen) Nos existing commissioned PWSS of Suti-I & Suti-II Block under Jangipur Sub-Division under Murshidabad Division P.H.E. Dte. PART-B ASSISTANT ENGINEER JUNIOR ENGINEER 6 ORD/000126/2022-2023 1215/MURD 10/05/2022 30 RADIANT 73.97 0.00 0 100
5 MURSHIDABAD Murshidabad Division AUGMENTATION OF GROUND WATER BASED RATURI ZONE-I PWSS SUTI-I BLOCK WITHIN MURSHIDABAD DISTRICT UNDER MURSHIDABAD DIVISION, PHE DTE. , SM/13997 Augmentation Sinking of 01 (One) Nos of 300mm x 200 mm dia tube well i.e. TW-I of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at RATURI ZONE -I Water Supply Scheme at Head Work Site, 2nd Site site at Suti-I Block under Murshidabad Division, P.H. Engineering Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 2 ORD/000713/2023-2024 3838/MURD 14/12/2023 21 SUJIT KUMAR SAHA 11.79 4.41 37.4 50
6 MURSHIDABAD Murshidabad Division AUGMENTATION OF GROUND WATER BASED RATURI ZONE-I PWSS SUTI-I BLOCK WITHIN MURSHIDABAD DISTRICT UNDER MURSHIDABAD DIVISION, PHE DTE. , SM/13997 Augmentation Allied work for Road restoration damaged during laying of pipeline of Raturi Zone-I Piped Water Supply Scheme, Suti Block, Jangipur Sub-Division under Murshidabad Division, P.H.E dte. ASSISTANT ENGINEER ORD/000826/2023-2024 769/MURD 13/03/2024 30 S. DUTTA 48.28 0.00 0 0
7 MURSHIDABAD Murshidabad Division AUGMENTATION OF GROUND WATER BASED RATURI ZONE-I PWSS SUTI-I BLOCK WITHIN MURSHIDABAD DISTRICT UNDER MURSHIDABAD DIVISION, PHE DTE. , SM/13997 Augmentation Laying of distribution system for Augmentation work of RATURI ZONE I Piped Water Supply Scheme in SUTI-I Block under Murshidabad Division, PHE.Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 2 ORD/000856/2022-2023 792/MURD 21/03/2023 180 S. DUTTA 56.15 0.00 0 30
8 MURSHIDABAD Murshidabad Division AUGMENTATION OF GROUND WATER BASED RATURI ZONE-I PWSS SUTI-I BLOCK WITHIN MURSHIDABAD DISTRICT UNDER MURSHIDABAD DIVISION, PHE DTE. , SM/13997 Augmentation Material Requisition To Resource Division RTOR000205/2023-2024 1210/MURD/20 02/05/2023 Resource Division 27.82 0.00 0 0
9 MURSHIDABAD Berhampore Mechanical AUGMENTATION OF GROUND WATER BASED RATURI ZONE-I PWSS SUTI-I BLOCK WITHIN MURSHIDABAD DISTRICT UNDER MURSHIDABAD DIVISION, PHE DTE. , SM/13997 Augmentation Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Augumentation in connection to Accommodate FHTC at Pump House No.-I & II, Zone-I under RATURI ground water based water supply scheme under Block_ SUTI-I Dist. - Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-II Junior engineer-II,Junior engineer-III ORD/000131/2023-2024 1918/MEDB 16/06/2023 90 MENAKA ENTERPRISE 20.80 0.00 0 5
Total 431.75 17.15 3.97