Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 583.5 55.92 9.58  
1 MURSHIDABAD Khargram Murshidabad Division PUNRAPARA AND ADJOINING MOUJAS PWSS , SM/13932 New Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II of 90.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Punrapara & adjoining mouzas Water Supply Scheme at Head Work Site & 2nd Site at K h a r g r a m Block under Murshidabad Division, P.H. Engineering Dte ASSISTANT ENGINEER JUNIOR ENGINEER 3 ORD/000039/2023-2024 1099/MURD 24/04/2023 30 NADIA TUBEWELLS 21.35 0.00 0 0
2 MURSHIDABAD Khargram Murshidabad Division PUNRAPARA AND ADJOINING MOUJAS PWSS , SM/13932 New Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at PUNRAPARA AND ADJOINING MOUJAS Water Supply Scheme at Head Work Site, 2nd Site site at KHARGRAM Block under Murshidabad Division, P.H. Engineering Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 3 ORD/000269/2023-2024 2587/MURD 21/08/2023 21 INDRAJIT MAZUMDAR 18.43 0.00 0 0
3 MURSHIDABAD Khargram Murshidabad Division PUNRAPARA AND ADJOINING MOUJAS PWSS , SM/13932 New Laying Distribution System (PART-B), FHTC for PUNRAPARA Water Supply Scheme in Khargram Block , under Murshidabad Division ,PHE.Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 3 ORD/000675/2023-2024 3656/MURD 29/11/2023 120 AJAY MONDAL 270.30 33.64 12.45 30
4 MURSHIDABAD Khargram Murshidabad Division PUNRAPARA AND ADJOINING MOUJAS PWSS , SM/13932 New Formal Work Order for Construction of 300 Cum OHR, Pump House at Head Work Site & 2nd Tube well site , Laying Distribution System (PART-A), Rising Main, Boundwary Wall for PUNRAPARA PWSS in Khargram Block , under Murshidabad Division ,PHE.Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 3 ORD/000844/2022-2023 756/MURD 16/03/2023 365 JIT CONSTRUCTION 194.60 22.28 11.45 10
5 MURSHIDABAD Khargram Murshidabad Division PUNRAPARA AND ADJOINING MOUJAS PWSS , SM/13932 New Material Requisition To Resource Division RTOR000025/2023-2024 1210/MURD/33 02/05/2023 Resource Division 16.90 0.00 0 0
6 MURSHIDABAD Khargram Berhampore Mechanical PUNRAPARA AND ADJOINING MOUJAS PWSS , SM/13932 New NEW CONNECTION AT PURAOARA PH 1 ID 304342318 BILL/00357/2024-2025 108/WBSEDCL-JJM 05/06/2024 WBSEDCL 6.06 0.00 0 0
7 MURSHIDABAD Khargram Berhampore Mechanical PUNRAPARA AND ADJOINING MOUJAS PWSS , SM/13932 New Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Newly Sunk Tube Well in connection to Accommodate FHTC at Pump House No.-I ,II,III ,IV & V under PUNRAPARA ground water based water supply scheme under Block_ KHARGRAM Dist. - Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-II Junior engineer-II ORD/000084/2023-2024 1932/MEDB 16/06/2023 90 MAHADEB ENTERPRISE 55.86 0.00 0 0
Total 583.49 55.92 9.58