Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 748.52 43.31 5.79  
1 MURSHIDABAD Murshidabad Division AUGMENTATION OF BACHHRA ZONE-I PIPED WATER SUPPLY SCHEME BLOCK BELDANGA -II DISTRICT MURSHIDABAD. , SM/13928 Augmentation Continuation work order for Wall writing on smooth, durable wall surface (preferably of Govt. premises/Boundary wall) by cleaning the surface thoroughly, removing old paints, preparing with one coat good quality exterior primer and painting the surface with best quality synthetic enamel paint of approved shed and writing IEC message along with logo, picture etc of multiple colour as will be supplied by PHE Dte. by engaging skilled artist and helper artist in different location within the district of Murshidabad all complete as per direction of EIC. ASSISTANT ENGINEER,ASSISTANT ENGINEER (HQ) JUNIOR ENGINEER ORD/000008/2024-2025 1641/MURD 29/05/2024 60 IMAGIN 95.53 0.00 0 0
2 MURSHIDABAD Murshidabad Division AUGMENTATION OF BACHHRA ZONE-I PIPED WATER SUPPLY SCHEME BLOCK BELDANGA -II DISTRICT MURSHIDABAD. , SM/13928 Augmentation Construction of 100 Cum OHR, Laying of Distribution System (part_A), Rising Main , Special repair and renovation of existing 1 (One) Nos PumpHouse and Allied Works, repairing & Overhauling of R.C.C. elevated reservoir 250 Cum capacity for Augmentation work of BACHHRA ZONE-I PWSS in BELDANGA-II Block under Murshidabad Division , PHE.Dte.(part_A) ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000138/2023-2024 1820/MURD 12/07/2023 365 MAHMOOD ASSOCIATES PRIVATE LIMITED 330.74 0.00 0 0
3 MURSHIDABAD Murshidabad Division AUGMENTATION OF BACHHRA ZONE-I PIPED WATER SUPPLY SCHEME BLOCK BELDANGA -II DISTRICT MURSHIDABAD. , SM/13928 Augmentation Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at BACHHRA ZONE ¿ I Water Supply Scheme at Head Work Site, 2nd Site site at Beldanga-II Block under Murshidabad Division, P.H. Engineering Dte ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000551/2023-2024 3193/MURD 12/10/2023 21 NADIA TUBEWELLS 23.56 0.00 0 50
4 MURSHIDABAD Murshidabad Division AUGMENTATION OF BACHHRA ZONE-I PIPED WATER SUPPLY SCHEME BLOCK BELDANGA -II DISTRICT MURSHIDABAD. , SM/13928 Augmentation Wall writing on smooth, durable wall surface (preferably of Govt. premises/Boundary wall) by cleaning the surface thoroughly, removing old paints, preparing with one coat good quality exterior primer and painting the surface with best quality synthetic enamel paint of approved shed and writing IEC message along with logo, picture etc of multiple colour as will be supplied by PHE Dte. by engaging skilled artist and helper artist in different location within the district of Murshidabad all complete as per direction of EIC. ASSISTANT ENGINEER (HQ) JUNIOR ENGINEER ORD/000794/2023-2024 517/MURD 16/02/2024 60 IMAGIN 97.48 0.00 0 80
5 MURSHIDABAD Murshidabad Division AUGMENTATION OF BACHHRA ZONE-I PIPED WATER SUPPLY SCHEME BLOCK BELDANGA -II DISTRICT MURSHIDABAD. , SM/13928 Augmentation Providing FHTC Connection to 573 nos household , Laying of Distribution System (Part_B), Repairing & Vertical Extention of Boundary Wall for Augmentation work of BACHHARA ZONE-I PWSS in Beldanga-II Block under Murshidabad Division , PHE.Dte. (part_B) ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000890/2022-2023 913/MURD 30/03/2023 180 AYUSH ENTERPRISE 103.18 32.16 31.17 30
6 MURSHIDABAD Murshidabad Division AUGMENTATION OF BACHHRA ZONE-I PIPED WATER SUPPLY SCHEME BLOCK BELDANGA -II DISTRICT MURSHIDABAD. , SM/13928 Augmentation Preparation of D.P.R Consultancy work ( Augmentation/With Retrofitting/Retrofitting Only) in connection with the Functional House Hold Tap Connection of 06(Six) Nos existing commissioned PWSS of Beldanga-I & II Block under Berhampore Sub-Division under Murshidabad Division P.H.E. Dte. PART-A ASSISTANT ENGINEER JUNIOR ENGINEER 3 ORD/001641/2021-2022 480/MURD 22/02/2022 60 GEOTECHNICAL ENGINEERS CONSORTIUM (PROP:MANASIJ DUTTA) 47.33 11.15 23.56 0
7 MURSHIDABAD Murshidabad Division AUGMENTATION OF BACHHRA ZONE-I PIPED WATER SUPPLY SCHEME BLOCK BELDANGA -II DISTRICT MURSHIDABAD. , SM/13928 Augmentation Material Requisition To Resource Division RTOR000012/2024-2025 1811/MURD/11 20/06/2024 Resource Division 6.03 0.00 0 0
8 MURSHIDABAD Murshidabad Division AUGMENTATION OF BACHHRA ZONE-I PIPED WATER SUPPLY SCHEME BLOCK BELDANGA -II DISTRICT MURSHIDABAD. , SM/13928 Augmentation Material Requisition To Resource Division RTOR000208/2023-2024 1210/MURD/24 02/05/2023 Resource Division 4.36 0.00 0 0
9 MURSHIDABAD Berhampore Mechanical AUGMENTATION OF BACHHRA ZONE-I PIPED WATER SUPPLY SCHEME BLOCK BELDANGA -II DISTRICT MURSHIDABAD. , SM/13928 Augmentation NEW CONNECTION AT BACHRA Z-I PH-I BILL/00173/2024-2025 18/WBSEDCL-JJM 16/04/2024 WBSEDCL 3.76 0.00 0 0
10 MURSHIDABAD Berhampore Mechanical AUGMENTATION OF BACHHRA ZONE-I PIPED WATER SUPPLY SCHEME BLOCK BELDANGA -II DISTRICT MURSHIDABAD. , SM/13928 Augmentation Name of Work: Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Augumentation in connection to Accommodate FHTC at Pump House No.-I ,II & III , ZONE-I under BACHHRA ground water based water supply scheme under Block_ BELDANGA-II Dist. - Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/001473/2023-2024 758/MEDB 20/02/2024 90 KARTICK BAL 36.55 0.00 0 0
Total 748.53 43.31 5.79