Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 21,869.36 207.1 0.95  
1 MURSHIDABAD Murshidabad Division Augmentation of Gobarhati Piped Water Supply Scheme Block - Kandi District - Murshidabad. , SM/13926 Augmentation Laying Distribution System PART-B,FHTC for Augmentation of GOBARHATI PWSS in KANDI Block , under Murshidabad Division ,PHE.Dte.Part-B ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000017/2023-2024 991/MURD 11/04/2023 120 S.K. ENTERPRISE (SANDIP GHOSH) 175.23 93.78 53.52 35
2 MURSHIDABAD Murshidabad Division Augmentation of Gobarhati Piped Water Supply Scheme Block - Kandi District - Murshidabad. , SM/13926 Augmentation Construction of 350 Cum OHR, Boundwary Wall, Rising Main Connection, Laying Distribution System PART-A,FHTC for Augmentation of GOBARHATI PWSS in KANDI Block , under Murshidabad Division ,PHE.Dte ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000029/2023-2024 1087/MURD 20/04/2023 365 MOTI RAHAMAN 301.83 98.39 32.6 25
3 MURSHIDABAD Murshidabad Division Augmentation of Gobarhati Piped Water Supply Scheme Block - Kandi District - Murshidabad. , SM/13926 Augmentation Sinking of 01 (One) No. of 300 mm x 200 mm dia tube well i.e. TW-III of 90.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Gobarhati & adjoining mouzas Water Supply Scheme at 3rd work site at K a n d i Block under Murshidabad Division, P.H. Engineering Dte. ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000034/2023-2024 1109/MURD 24/04/2023 20 INDRAJIT MAZUMDAR 10.68 0.00 0 0
4 MURSHIDABAD Murshidabad Division Augmentation of Gobarhati Piped Water Supply Scheme Block - Kandi District - Murshidabad. , SM/13926 Augmentation Construction of surface drain of length 50 m at the Head work site of Gobarhati PWSS and Southern side of Kandi Stack Yard under Kandi Sub Division, P.H.E.Dte. in the district of Murshidabad. ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000166/2023-2024 1971/MURD 20/07/2023 30 S.K. CONSTRUCTION (SUDIP KUMAR SANYAL) 3.88 3.85 99.23 100
5 MURSHIDABAD Murshidabad Division Augmentation of Gobarhati Piped Water Supply Scheme Block - Kandi District - Murshidabad. , SM/13926 Augmentation Supplying fitting and fixing of R.B. T Concertina fencing on wall top of Gobarhati PWSS and Kandi Stack Yard under Kandi Sub Division, P.H.E. Dte. in the district of Murshidabad. ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000167/2023-2024 1972/MURD 20/07/2023 30 S.K. CONSTRUCTION (SUDIP KUMAR SANYAL) 5.14 2.46 47.86 80
6 MURSHIDABAD Murshidabad Division Augmentation of Gobarhati Piped Water Supply Scheme Block - Kandi District - Murshidabad. , SM/13926 Augmentation Demolition of damaged R.C.C. Elevated Reservoir (Capacity 2,72,400 Ltr) at Gokarna /Gobarhati Water Supply Scheme under Kandi Sub Division, P.H.E. Dte. in the district of Murshidabad ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000737/2023-2024 61/MURD 08/01/2024 30 MD SAJAHAN ALI 5.47 2.73 49.91 100
7 MURSHIDABAD Murshidabad Division Augmentation of Gobarhati Piped Water Supply Scheme Block - Kandi District - Murshidabad. , SM/13926 Augmentation Construction of surface drain of length 40.35 m at the Head work site of Gobarhati PWSS and eastern side of Kandi Stack Yard under Kandi Sub Division, P.H.E.Dte. in the district of Murshidabad. ASSISTANT ENGINEER JUNIOR ENGINEER 1 ORD/000747/2023-2024 106/MURD 10/01/2024 30 S.K. CONSTRUCTION (SUDIP KUMAR SANYAL) 3.06 1.46 47.71 100
8 MURSHIDABAD Murshidabad Division Augmentation of Gobarhati Piped Water Supply Scheme Block - Kandi District - Murshidabad. , SM/13926 Augmentation Preparation of D.P.R(Consultancy work)in connection with the Functional House Hold Connection of different existing PWSS (GABARHATI PWSS Scheme, Block - KANDI) to be Augmentation/Rejuvination under Murshidabad Division P.H.E. Dte. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/002140/2021-2022 3257/MURD 05/10/2021 60 GEOTECHNICAL ENGINEERS CONSORTIUM (PROP:MANASIJ DUTTA) 6.51 4.43 68.05 1
9 MURSHIDABAD Murshidabad Division Augmentation of Gobarhati Piped Water Supply Scheme Block - Kandi District - Murshidabad. , SM/13926 Augmentation Material Requisition To Resource Division RTOR000065/2022-2023 1043/MURD/2 17/04/2023 Resource Division 8.90 0.00 0 0
10 MURSHIDABAD Murshidabad Division Augmentation of Gobarhati Piped Water Supply Scheme Block - Kandi District - Murshidabad. , SM/13926 Augmentation Material Requisition To Resource Division RTOR000307/2023-2024 1295/MURD/02 11/05/2023 Resource Division 8.90 0.00 0 0
11 MURSHIDABAD Central Drilling Augmentation of Gobarhati Piped Water Supply Scheme Block - Kandi District - Murshidabad. , SM/13926 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
Total 21,869.37 207.10 0.95