Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 520.66 62.43 11.99  
1 MALDAH Kaliachak - I Malda Ars Area W/S Division Nabinagar mouza Piped water supply Scheme of Kaliachak-I block under Malda arsenic area water supply Division, PHED , SM/15949 New Laying of Distribution System at Lashratalla, Madhyapara & Nabinagar for Nabinagar Piped Water supply scheme at Kaliachak-I Block under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda. Assistant Engineer-II Junior Engineer-II ORD/000002/2023-2024 639/MAAD 06/04/2023 60 DHRITIPALI 34.15 12.65 37.04 85
2 MALDAH Kaliachak - I Malda Ars Area W/S Division Nabinagar mouza Piped water supply Scheme of Kaliachak-I block under Malda arsenic area water supply Division, PHED , SM/15949 New Laying of Distribution System at Paschim Chamatola, Bankpara, Layagram, Puratun Tola for Nabinagar Piped Water supply scheme at Kaliachak-I Block under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda. Assistant Engineer-II Junior Engineer-II ORD/000003/2023-2024 640/MAAD 06/04/2023 60 SOVON KUMAR DAS 50.45 19.52 38.69 85
3 MALDAH Kaliachak - I Malda Ars Area W/S Division Nabinagar mouza Piped water supply Scheme of Kaliachak-I block under Malda arsenic area water supply Division, PHED , SM/15949 New Sinking of Two nos 250mm. Dia. x 150mm. big dia. Tube Well of 150 Mtr. deep by Direct Rotary Rig method using UPVC (CM) Pipes & UPVC Medium Well Screen (RMS) Pipes with Ribs for Nabinagar Piped Water supply scheme (Head Work Site & 2nd Tube well Site ) at Kaliachak-I Block under Malda Arsenic Area Water Supply Division , P.H.E. Dte., Malda (2nd Call) Assistant Engineer-II Junior Engineer-II ORD/000105/2023-2024 1412/MAAD 20/07/2023 45 M/S DYNAMIC CONSTRUCTION 14.64 5.05 34.49 100
4 MALDAH Kaliachak - I Malda Ars Area W/S Division Nabinagar mouza Piped water supply Scheme of Kaliachak-I block under Malda arsenic area water supply Division, PHED , SM/15949 New Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at 2nd Tube Well site of Nabinagar Piped Water Supply Scheme under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda. Assistant Engineer-II Junior Engineer-II ORD/000127/2023-2024 1470/MAAD 01/08/2023 60 M/S A.B. CONSTRUCTION 5.02 0.00 0 0
5 MALDAH Kaliachak - I Malda Ars Area W/S Division Nabinagar mouza Piped water supply Scheme of Kaliachak-I block under Malda arsenic area water supply Division, PHED , SM/15949 New Construction of 450 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design & Drawing including pipe connection, Soil Investigation for Nabinagar Piped Water Supply scheme at Kaliachak-I Block under Malda Arsenic Area W/S Division, P.H.E. Dte, Malda Assistant Engineer-I,Assistant Engineer-II Junior Engineer-II ORD/000264/2023-2024 3018/MAAD 06/12/2023 270 M/S AMIT KUMAR GUPTA 164.67 0.00 0 20
6 MALDAH Kaliachak - I Malda Ars Area W/S Division Nabinagar mouza Piped water supply Scheme of Kaliachak-I block under Malda arsenic area water supply Division, PHED , SM/15949 New Construction of Arsenic-cum-Iron Removal Plant (AIRP) for Nabinagar Piped Water supply scheme at Kaliachak-I Block under Malda Arsenic Area W/S Division, P.H.E.Dte. in the District of Malda. (2ND Call) Assistant Engineer-II Junior Engineer-II ORD/000277/2023-2024 3079/MAAD 14/12/2023 365 SOFIQUL ISLAM 151.63 0.00 0 0
7 MALDAH Kaliachak - I Malda Ars Area W/S Division Nabinagar mouza Piped water supply Scheme of Kaliachak-I block under Malda arsenic area water supply Division, PHED , SM/15949 New Material Requisition To Resource Division RTOR000005/2023-2024 627/MAAD 05/04/2023 Resource Division 26.27 0.00 0 0
8 MALDAH Kaliachak - I Malda Mechanical Nabinagar mouza Piped water supply Scheme of Kaliachak-I block under Malda arsenic area water supply Division, PHED , SM/15949 New QUOTATION PAYMENT FOR NABINAGAR W/S SCHEME T/W NO 1 UNDER KALIACHAK CCC UNDER MALDA DISTRICT BILL/01613/2024-2025 BP-2024-25-397 29/07/2024 W.B.S.E.D.C.LTD 3.91 0.00 0 null
9 MALDAH Kaliachak - I Malda Mechanical Nabinagar mouza Piped water supply Scheme of Kaliachak-I block under Malda arsenic area water supply Division, PHED , SM/15949 New Supply, delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I & II and Arsenic Iron Removal Plant at Nabinagar Piped Water Supply Scheme in the district of Malda Under Malda Mechanical Division, PHE Dte. (TSM/017551) Assistant Engineer - II Junior Engineer-03 ORD/000659/2023-2024 2687/MLMD 11/08/2023 180 DEY ENTERPRISE.. 65.66 20.95 31.91 30
10 MALDAH Kaliachak - I Malda Mechanical Nabinagar mouza Piped water supply Scheme of Kaliachak-I block under Malda arsenic area water supply Division, PHED , SM/15949 New W.B.S.E.D.C.LTD Quotation charge at P/H No. I of Nabinagar PWSS, Kaliachak C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II ORD/001012/2023-2024 3004427272 18/09/2023 90 W.B.S.E.D.C.LTD 4.26 4.26 100 100
Total 520.66 62.41 11.99