Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 136.42 48.42 35.49  
1 MALDAH Malda Division Augmentation of Mahishbathani Piped Water Supply Scheme , SM/16383 Augmentation Acceptance cum formal work order for Sinking of Tubewell, Laying of Distribution System and Providing Functional Household Tap connection (FHTC) of Mahishbathani Piped Water Supply Scheme at Old Malda Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Amit Biswas, Assistant Engineer,Mr. Prosanta Mandal, Assistant Engineer Mr. Sujit Sarkar, Junior Engineer ORD/000052/2023-2024 2005/MD 17/05/2023 45 M/S DAS CONSTRUCTION 92.60 36.80 39.74 50
2 MALDAH Malda Division Augmentation of Mahishbathani Piped Water Supply Scheme , SM/16383 Augmentation Hiring of 1 no diesel vehicle in good condition (traffic worthily) having licensed contract carriage permit from Regional Transport Authority for office of the Superintending Engineer, North Bengal Circle-II, PHE Dte. (Period from 20/06/2024 to 16/12/2024=180 Days). Vehicle no. WB 65A/4911. Mr. Arnab Giri, Assistant Engineer,Mr. Prasanta Mandal, Assistant Engineer,Mr. Prosanta Mandal, Assistant Engineer Mr. Sujit Sarkar, Junior Engineer,Ziaur Rahaman, Junior Engineer ORD/000307/2024-2025 3120/MD 19/06/2024 180 USHA ENTERPRISE 0.86 0.22 25.58 0
3 MALDAH Malda Division Augmentation of Mahishbathani Piped Water Supply Scheme , SM/16383 Augmentation Continuation work order for Hiring of inspection Vehicle (Non-Air-Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/LPG/CNG Engine) in perfect good condition of performing a very long jurney and should be covered any where without any trouble on monthly hire basis for Official use of the office of the Assistant Engineer, Malda Sadar Sub-Division, PHE Dte. under Malda Division, PHE Dte. (Period from 01/07/2023 to 31/12/2023). Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000314/2023-2024 503/MSD 30/06/2023 180 ARUN KUMAR DAS 0.86 0.96 111.63 100
4 MALDAH Malda Division Augmentation of Mahishbathani Piped Water Supply Scheme , SM/16383 Augmentation Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room at Head Work Site of Mahishbathani Piped Water Supply Scheme at Old Malda Dev. Block under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Amit Biswas, Assistant Engineer Mr. Sujit Sarkar, Junior Engineer ORD/000952/2023-2024 653/MD 08/02/2024 45 M/S DAS CONSTRUCTION 4.15 0.00 0 0
5 MALDAH Malda Division Augmentation of Mahishbathani Piped Water Supply Scheme , SM/16383 Augmentation Material Requisition To Resource Division RTOR000079/2023-2024 1811/MD 27/04/2023 Resource Division 10.94 0.00 0 0
6 MALDAH Malda Mechanical Augmentation of Mahishbathani Piped Water Supply Scheme , SM/16383 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. III & IV and making compound lighting arrangement at head worksite of Augmentation of Mahishbathani Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/017802) Assistant Engineer - II Junior Engineer-07 ORD/000732/2023-2024 2692/MLMD 11/08/2023 180 MOON LIGHT CONSTRUCTION AND STAR GOLD ENTERPRISE 27.01 10.44 38.65 77
Total 136.40 48.42 35.5