Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
6 | 445.46 | 70.04 | 15.72 | ||||||||||||||
1 | MALDAH | Malda Division | Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 | Augmentation | Formal work order for the work of Augmentation of ADINA ZONE-I Piped Water Supply Scheme at Gazole Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. | Mr. Arnab Giri, Assistant Engineer | Ziaur Rahaman, Junior Engineer | ORD/000119/2023-2024 | 2322/MD | 08/06/2023 | 270 | M/S TRILOCHAN CONSTRUCTION CO | 348.95 | 67.03 | 19.21 | 35 | |
2 | MALDAH | Malda Division | Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 | Augmentation | Acceptance cum formal work order for Route survey, design and preparation of DPR of Adina Zone-I Piped Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. | Mr. Arnab Giri, Assistant Engineer | Ramen Karmakar, Junior Engineer | ORD/000683/2021-2022 | 648/MD | 22/03/2022 | 15 | TECHVISION | 3.04 | 3.01 | 99.01 | 1 | |
3 | MALDAH | Malda Division | Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 | Augmentation | Construction of Boundary Wall at Head Work site of Adina Zone-I Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. | Mr. Arnab Giri, Assistant Engineer | Ziaur Rahaman, Junior Engineer | ORD/000888/2023-2024 | 162/MD | 08/01/2024 | 45 | M/S PARIMAL DAS | 21.89 | 0.00 | 0 | 0 | |
4 | MALDAH | Malda Division | Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 | Augmentation | Material Requisition To Resource Division | RTOR000075/2023-2024 | 1811/MD | 27/04/2023 | Resource Division | 34.17 | 0.00 | 0 | 0 | ||||
5 | MALDAH | Malda Mechanical | Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 | Augmentation | W.B.S.E.D.C.LTD Quotation charge at TW No- I of Adina Zone-I, Pandua CCC in the dist of Malda Under Malda Mechanical Division PHE Dte. | BILL/03698/2023-2024 | BP-2023-24-676 | 11/03/2024 | W.B.S.E.D.C.LTD | 8.67 | 0.00 | 0 | null | ||||
6 | MALDAH | Malda Mechanical | Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 | Augmentation | Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. I & II and making compound lighting arrangement at head worksite ,Solarisation of WBSEDCL energised pump house with Supply and Installation of Grid-connected Ground Mounted Solar PV systems with Net Metering at T/W no. I of Adina Zone-I Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/011889) | Assistant Engineer - II | ORD/000599/2023-2024 | 2719/MLMD | 14/08/2023 | 2005 | SUNRISE ENGINEERING CORPORATION. | 28.74 | 0.00 | 0 | 0 | ||
Total | 445.46 | 70.04 | 15.72 |