Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 445.46 70.04 15.72  
1 MALDAH Malda Division Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 Augmentation Formal work order for the work of Augmentation of ADINA ZONE-I Piped Water Supply Scheme at Gazole Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000119/2023-2024 2322/MD 08/06/2023 270 M/S TRILOCHAN CONSTRUCTION CO 348.95 67.03 19.21 35
2 MALDAH Malda Division Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 Augmentation Acceptance cum formal work order for Route survey, design and preparation of DPR of Adina Zone-I Piped Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ramen Karmakar, Junior Engineer ORD/000683/2021-2022 648/MD 22/03/2022 15 TECHVISION 3.04 3.01 99.01 1
3 MALDAH Malda Division Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 Augmentation Construction of Boundary Wall at Head Work site of Adina Zone-I Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000888/2023-2024 162/MD 08/01/2024 45 M/S PARIMAL DAS 21.89 0.00 0 0
4 MALDAH Malda Division Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 Augmentation Material Requisition To Resource Division RTOR000075/2023-2024 1811/MD 27/04/2023 Resource Division 34.17 0.00 0 0
5 MALDAH Malda Mechanical Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 Augmentation W.B.S.E.D.C.LTD Quotation charge at TW No- I of Adina Zone-I, Pandua CCC in the dist of Malda Under Malda Mechanical Division PHE Dte. BILL/03698/2023-2024 BP-2023-24-676 11/03/2024 W.B.S.E.D.C.LTD 8.67 0.00 0 null
6 MALDAH Malda Mechanical Augmentation of Adina Zone-I Piped Water Supply Scheme , SM/15958 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. I & II and making compound lighting arrangement at head worksite ,Solarisation of WBSEDCL energised pump house with Supply and Installation of Grid-connected Ground Mounted Solar PV systems with Net Metering at T/W no. I of Adina Zone-I Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/011889) Assistant Engineer - II ORD/000599/2023-2024 2719/MLMD 14/08/2023 2005 SUNRISE ENGINEERING CORPORATION. 28.74 0.00 0 0
Total 445.46 70.04 15.72