Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7 | 335.63 | 149.09 | 44.42 | ||||||||||||||
1 | MALDAH | Malda Division | Augmentation of Adina Zone-II Piped Water Supply Scheme , SM/15956 | Augmentation | Formal work order for the work of Augmentation of ADINA ZONE-II Piped Water Supply Scheme at Gazole Dev. Block of Malda district under Malda Division, PHE Dte. | Mr. Arnab Giri, Assistant Engineer | Ziaur Rahaman, Junior Engineer | ORD/000028/2023-2024 | 1839/MD | 02/05/2023 | 365 | M/S PARIMAL DAS | 275.44 | 140.03 | 50.84 | 50 | |
2 | MALDAH | Malda Division | Augmentation of Adina Zone-II Piped Water Supply Scheme , SM/15956 | Augmentation | Construction of Boundary Wall at Head work Site of Adina Zone-II Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. | Mr. Arnab Giri, Assistant Engineer | Ziaur Rahaman, Junior Engineer | ORD/000206/2024-2025 | 3027/MD | 13/06/2024 | 30 | M/S PARIMAL DAS | 23.85 | 0.00 | 0 | 0 | |
3 | MALDAH | Malda Division | Augmentation of Adina Zone-II Piped Water Supply Scheme , SM/15956 | Augmentation | Acceptance cum formal work order for Route survey, design and preparation of DPR of Adina Zone-II Piped Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. | Mr. Arnab Giri, Assistant Engineer | Amit Karmakar, Junior Engineer | ORD/000684/2021-2022 | 649/MD | 22/03/2022 | 15 | TECHVISION | 3.11 | 1.50 | 48.23 | 100 | |
4 | MALDAH | Malda Division | Augmentation of Adina Zone-II Piped Water Supply Scheme , SM/15956 | Augmentation | Material Requisition To Resource Division | RTOR000022/2023-2024 | 1611/MD | 11/04/2023 | Resource Division | 4.15 | 0.00 | 0 | 0 | ||||
5 | MALDAH | Malda Division | Augmentation of Adina Zone-II Piped Water Supply Scheme , SM/15956 | Augmentation | Material Requisition To Resource Division | RTOR000077/2023-2024 | 1811/MD | 27/04/2023 | Resource Division | 2.97 | 0.00 | 0 | 0 | ||||
6 | MALDAH | Malda Mechanical | Augmentation of Adina Zone-II Piped Water Supply Scheme , SM/15956 | Augmentation | W.B.S.E.D.C.LTD Quotation charge at T/W No.I of Adina PWSS, Zone-II Pandua C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. | Assistant Engineer - II | Junior Engineer-07 | ORD/001887/2023-2024 | 3004474993 | 08/11/2023 | 90 | W.B.S.E.D.C.LTD | 5.36 | 2.68 | 50 | 100 | |
7 | MALDAH | Malda Mechanical | Augmentation of Adina Zone-II Piped Water Supply Scheme , SM/15956 | Augmentation | Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. I and making compound lighting arrangement at head worksite ,Solarisation of WBSEDCL energised pump house with Supply and Installation of Grid-connected Ground Mounted Solar PV systems with Net Metering at T/W no. I of Adina Zone-II Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/011890) | Assistant Engineer - II | Junior Engineer-07 | ORD/002024/2023-2024 | 4763/MLMD | 29/12/2023 | 180 | M/S TRILOCHAN CONSTRUCTION CO. | 20.75 | 4.88 | 23.52 | 46 | |
Total | 335.64 | 149.09 | 44.42 |