Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 59.49 16.13 27.11  
1 MALDAH Malda Division Source Augmentation of Dakshin Gouripur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15073 Augmentation Acceptance cum formal work order for Extension of Pipe line and Replacing of damaged A.C pipe line by different dia UPVC pipe for Dakshin Gouripur Piped Water Supply scheme in Harischandrapur II Block under Malda Division PHE. Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Tilok Roy, Junior Engineer ORD/000577/2022-2023 768/MD 17/02/2023 45 SUDIPTA GHOSH 29.67 0.00 0 0
2 MALDAH Malda Division Source Augmentation of Dakshin Gouripur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15073 Augmentation Acceptance cum formal work order for Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Dakshin Gouripur Piped Water Supply Scheme at Harishchandrapur-I Block of Malda District under Malda Division, PHE Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Sanjit Sarkar, Junior Engineer ,Mr. Tilok Roy, Junior Engineer ORD/000747/2022-2023 1295/MD 23/03/2023 45 SAYEM ENTERPRISE 4.18 2.07 49.52 97
3 MALDAH Malda Division Source Augmentation of Dakshin Gouripur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15073 Augmentation Acceptance cum formal work order for Sinking of 01(one) nos. 250mm. Dia. x 150mm. Big dia Tube Well 140 Mtr. deep by D.R. Rig method using UPVC pipe & Strainer in connection with Source Augmentation of DAKSHIN GOURIPUR Piped Water Supply Scheme under Malda Division P.H.E Dte in the District of Malda. (2nd Call) Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Sanjit Sarkar, Junior Engineer ORD/000778/2022-2023 1436/MD 29/03/2023 30 ASHIS CONSTRUCTION 9.62 9.30 96.67 100
4 MALDAH Malda Mechanical Source Augmentation of Dakshin Gouripur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15073 Augmentation W.B.S.E.D.C.LTD Quotation charge at T/W No. III of Dakshin Gouripur, Bhaluka C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. BILL/03391/2023-2024 BP-2023-24-501 01/02/2024 W.B.S.E.D.C.LTD 5.07 0.00 0 0
5 MALDAH Malda Mechanical Source Augmentation of Dakshin Gouripur Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15073 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components of T/W no. III of Dakshin Gouripur Water Supply Scheme in the District of under Malda Mechanical Division, PHE Dte. Assistant Engineer - II Junior Engineer-05 ORD/001810/2023-2024 3697/MLMD 29/11/2023 180 SOVON KUMAR DAS. 10.95 4.76 43.47 87
Total 59.48 16.13 27.12