Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 66.41 55.54 83.63  
1 MALDAH Malda Division Source Augmentation of Adhna Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15063 Augmentation Acceptance cum formal work order for Extension of Pipe line and replacing of damage uPVC pipe line by different dia UPVC pipe for ADHNA Piped Water Supply Scheme at Gazole Dev. Block of Malda District under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000556/2022-2023 1181/MD 21/03/2023 30 GOBINDA ENTERPRISE 40.50 37.69 93.06 90
2 MALDAH Malda Division Source Augmentation of Adhna Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15063 Augmentation Acceptance cum formal work order for Sinking of ( 200mm. Dia. x 150mm. Dia ) Big dia Tube Well No - 3 ( 150.00 Mtr. deep ) by D.R. Rig method using P.V.C. pipe including supply of Materials at ADHNA Water Supply Scheme under Malda Division P.H.E Dte in the District of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000715/2022-2023 1173/MD 20/03/2023 30 JAYA ENTERPRISE 7.56 7.05 93.25 100
3 MALDAH Malda Division Source Augmentation of Adhna Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15063 Augmentation Acceptance cum formal work order for Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Adhna Piped Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000725/2022-2023 1199/MD 21/03/2023 45 M/S GHOSH ENTERPRISE 4.17 2.08 49.88 100
4 MALDAH Malda Mechanical Source Augmentation of Adhna Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15063 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. III of Source Augmentation Adhna Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/016220) Assistant Engineer - II Junior Engineer-07 ORD/000596/2023-2024 2718/MLMD 14/08/2023 180 JOY ENTERPRISE. 10.67 5.21 48.83 100
5 MALDAH Malda Mechanical Source Augmentation of Adhna Piped Water Supply Scheme under Malda Division, PHE Dte. , SM/15063 Augmentation W.B.S.E.D.C.LTD Quotation charge at P/H No. III of Adhna PWSS, Pandua C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II ORD/000778/2023-2024 3004387448 18/08/2023 90 W.B.S.E.D.C.LTD 3.51 3.51 100 100
Total 66.40 55.54 83.63