Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 1,382.79 71.85 5.2  
1 MALDAH Gazole Malda Division FATEPUR Piped Water Supply Scheme , SM/14173 New Construction of Boundary Wall at Head Work site of Fatepur Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000272/2024-2025 3229/MD 28/06/2024 30 THREE BROTHERS CONSTRUCTION 26.65 0.00 0 0
2 MALDAH Gazole Malda Division FATEPUR Piped Water Supply Scheme , SM/14173 New Formal work order for the work of Implementation of FATEPUR and its adjoinining mouzas Piped Water Supply Scheme at Gazol Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000642/2022-2023 1028/MD 13/03/2023 270 GHOSH BROTHERS 1,157.58 60.90 5.26 15
3 MALDAH Gazole Malda Division FATEPUR Piped Water Supply Scheme , SM/14173 New Material Requisition To Resource Division RTOR000147/2023-2024 124/MD 06/01/2024 Resource Division 121.21 0.00 0 0
4 MALDAH Gazole Malda Division FATEPUR Piped Water Supply Scheme , SM/14173 New Material Requisition To Resource Division RTOR000153/2023-2024 243/MD 10/01/2024 Resource Division 13.18 0.00 0 0
5 MALDAH Gazole Malda Mechanical FATEPUR Piped Water Supply Scheme , SM/14173 New W.B.S.E.D.C.LTD Quotation charge at TW No- II of Fatepur, Pandua CCC in the dist of Malda Under Malda Mechanical Division PHE Dte BILL/00769/2024-2025 BP-2024-25-195 22/05/2024 W.B.S.E.D.C.LTD 10.78 0.00 0 null
6 MALDAH Gazole Malda Mechanical FATEPUR Piped Water Supply Scheme , SM/14173 New W.B.S.E.D.C.LTD Quotation charge at TW No- I of Fatepur, Pandua CCC in the dist of Malda Under Malda Mechanical Division PHE Dte BILL/00776/2024-2025 BP-2024-25-196 22/05/2024 W.B.S.E.D.C.LTD 11.26 0.00 0 null
7 MALDAH Gazole Malda Mechanical FATEPUR Piped Water Supply Scheme , SM/14173 New Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I ,II & III and making compound lighting arrangement at T/W no. I of Fatepur Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/015785) Assistant Engineer - II Junior Engineer-07 ORD/000380/2023-2024 2388/MLMD 28/07/2023 180 NUPUR CHANDRA HALDER 42.13 10.95 25.99 51
Total 1,382.79 71.84 5.2