Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 422.86 112.08 26.51  
1 MALDAH Harischandrapur - II Malda Division BETAHAL Piped Water Supply Scheme , SM/12191 New Formal work order for the work of Implementation of BETAHAL Piped Water Supply Scheme at Harishchandrapur-I Block of Malda district under Malda Division, PHE Dte., Govt. of West Bengal. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000294/2023-2024 2829/MD 25/07/2023 270 M/S ALISA CONSTRUCTIION 227.07 77.94 34.32 11
2 MALDAH Harischandrapur - II Malda Division BETAHAL Piped Water Supply Scheme , SM/12191 New Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) at Betahal Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation,Mr. Tilok Roy, Junior Engineer ORD/000298/2024-2025 3444/MD 11/07/2024 45 M/S. NAYAMEE ENGINEERING & CONSTRUCTIONS 18.55 0.00 0 0
3 MALDAH Harischandrapur - II Malda Division BETAHAL Piped Water Supply Scheme , SM/12191 New Construction of Boundary Wall at 2nd Tube Well site of Betahal Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000313/2024-2025 3953/MD 07/08/2024 45 M/S ALISA CONSTRUCTIION 7.26 0.00 0 0
4 MALDAH Harischandrapur - II Malda Division BETAHAL Piped Water Supply Scheme , SM/12191 New Acceptance cum formal work order for Sinking of 250mm. Dia. x 150 mm. Big dia. and 135 Mtr. deep Tube Well Drilling by Direct Rotary method with 150 mm dia upvc strainer of 30m length all complete including cost of materials at Heads Work Site of BETAHAL Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte. Mr. Sumit Kumar Ghosh, Assistant Engineer ORD/000373/2022-2023 2701/MD 17/11/2022 30 ASHIS CONSTRUCTION 9.20 9.17 99.67 1
5 MALDAH Harischandrapur - II Malda Division BETAHAL Piped Water Supply Scheme , SM/12191 New Laying of Distribution of UPVC Pipeline of BETAHAL Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte., Govt. of West Bengal. Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Susanta Pal, JE_Deputation ORD/000928/2023-2024 545/MD 31/01/2024 60 FUTURE 88.28 5.02 5.69 60
6 MALDAH Harischandrapur - II Malda Division BETAHAL Piped Water Supply Scheme , SM/12191 New Material Requisition To Resource Division RTOR000003/2024-2025 3916/MD 06/08/2024 Resource Division 0.86 0.00 0 0
7 MALDAH Harischandrapur - II Malda Division BETAHAL Piped Water Supply Scheme , SM/12191 New Material Requisition To Resource Division RTOR000087/2023-2024 1811/MD 27/04/2023 Resource Division 23.84 0.00 0 0
8 MALDAH Harischandrapur - II Malda Division BETAHAL Piped Water Supply Scheme , SM/12191 New Material Requisition To Resource Division RTOR000125/2023-2024 95/MD 05/01/2024 Resource Division 7.39 0.00 0 0
9 MALDAH Harischandrapur - II Malda Mechanical BETAHAL Piped Water Supply Scheme , SM/12191 New New service connection at Bethal PWSS T/W NO II Under EE/MLMD PHE DTE DIST. Malda.( Harishchandrapur c c c) BILL/00756/2024-2025 BP-2024-25-202 22/05/2024 W.B.S.E.D.C.LTD 8.73 0.00 0 null
10 MALDAH Harischandrapur - II Malda Mechanical BETAHAL Piped Water Supply Scheme , SM/12191 New Supply, installation, commissioning and trial operation of electro-mechanical components at T/W no. I , II and making compound lighting arrangement at T/W no. I of Bethal Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/013024) Assistant Engineer - II Junior Engineer-05 ORD/000026/2023-2024 784/MLMD 27/04/2023 120 DEBAPRIYA SAHA 26.72 14.99 56.1 71
11 MALDAH Harischandrapur - II Malda Mechanical BETAHAL Piped Water Supply Scheme , SM/12191 New W.B.S.E.D.C.LTD Quotation charge at P/H No. I of Betahal PWSS, Harishchandrapur C.C.C in the district of Malda Under Malda Mechanical Division PHE Dte. Assistant Engineer - II ORD/000093/2023-2024 3004232800 17/05/2023 90 W.B.S.E.D.C.LTD 4.96 4.96 100 0
Total 422.87 112.08 26.51