Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 581.83 153.47 26.38  
1 MALDAH Malda Division Augmentation of Deotala Water Supply Scheme , SM/09986 Augmentation Formal work order for Augmentation of DEOTALA Piped water supply scheme for the work of Geotechnical Study,construction of 500 Cum RCC OHR,Laying Distribution of pipe line and providing Functional Household Tap connection (FHTC) within Gazole Dev Block under Malda Division PH Engg Dte. In the District of Malda Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000003/2022-2023 868/MD 08/04/2022 365 MAHAVIR PUMPS MANUFACTURING PVT. LTD. 460.03 149.64 32.53 30
2 MALDAH Malda Division Augmentation of Deotala Water Supply Scheme , SM/09986 Augmentation Acceptance cum formal work order for Laying of Rising main with connection between 1st Tube well and 3 rd Tube well and condtructtion of standpost for DEOTALA Water Supply Scheme under Malda Division, PHE Dte. in the District of Malda. Mr. Arnab Giri, Assistant Engineer Biswajit Gosh, Junior Engineer ORD/000031/2022-2023 1308/MD 01/06/2022 30 JIBON GHOSH 4.43 2.05 46.28 0
3 MALDAH Malda Division Augmentation of Deotala Water Supply Scheme , SM/09986 Augmentation Acceptance cum formal work order for Route survey for distribution network design for augmentation of Deotala Water Supply Scheme in Gazole block under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Biswajit Gosh, Junior Engineer ORD/000148/2021-2022 1746/MD 15/06/2021 14 HORIZEN 2.86 1.78 62.24 1
4 MALDAH Malda Division Augmentation of Deotala Water Supply Scheme , SM/09986 Augmentation Laying of Rising Main including Specials and Valves for Deotala Piped Water Supply Scheme at Deotala Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. Mr. Arnab Giri, Assistant Engineer Amit Karmakar, Junior Engineer ORD/000889/2023-2024 163/MD 08/01/2024 45 M I CONSTRUCTION 14.99 0.00 0 0
5 MALDAH Malda Division Augmentation of Deotala Water Supply Scheme , SM/09986 Augmentation Material Requisition To Resource Division RTOR000004/2022-2023 1106/MD 17/05/2022 Resource Division 37.39 0.00 0 0
6 MALDAH Malda Division Augmentation of Deotala Water Supply Scheme , SM/09986 Augmentation Material Requisition To Resource Division RTOR000042/2022-2023 1585/MD 28/03/2023 Resource Division 2.30 0.00 0 0
7 MALDAH Malda Division Augmentation of Deotala Water Supply Scheme , SM/09986 Augmentation Material Requisition To Resource Division RTOR000194/2023-2024 816/MD 21/02/2024 Resource Division 45.08 0.00 0 0
8 MALDAH Malda Mechanical Augmentation of Deotala Water Supply Scheme , SM/09986 Augmentation Supply, installation and commissioning of electro-mechanical components of T/W no. II and making compound lighting arrangement at T/W no. I of Augmentation of Deotala Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/005108) Assistant Engineer - II ORD/000607/2023-2024 2723/MLMD 14/08/2023 180 JIBU SINGHA 14.75 0.00 0 0
Total 581.83 153.46 26.38