Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15 283.22 219 77.33  
1 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Formal work order for Augmentation of TILASAN Piped water supply scheme for the work of Geotechnical Study,construction of 200 Cum RCC OHR,Laying Distribution of pipe line and providing Functional Household Tap connection (FHTC) within Habibpur Block under Malda Division PH Engg.Dte. In the District of Malda. Mr. Arnab Giri, Assistant Engineer Biswajit Gosh, Junior Engineer,Mukaddar Parvage, Junior Engineer,Shreya Das, Junior Engineer ORD/000004/2022-2023 996/MD 22/04/2022 365 UTTAM KUMAR GHOSH 180.23 163.37 90.65 100
2 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Acceptance cum formal work order for Laying of Rising Main including connection of Pump No-1 & Pump No 2 and by pass arrangement for TILASAN Water Supply Scheme at Habibpur Dev. Block under Malda Division, PHE Dte. in the District of Malda. Mr. Arnab Giri, Assistant Engineer Biswajit Gosh, Junior Engineer,Shreya Das, Junior Engineer ORD/000030/2022-2023 1307/MD 01/06/2022 30 M/S EHAN ENTERPRISE 4.44 4.43 99.77 1
3 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Acceptance cum formal work order for Dismantling of concrete road and Construction the same at different places of road connecting to LDS of TILASAN Piped Water Supply Scheme at Habibpur Dev. Block, under Malda Division, P.H.E. Dte. in the District of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000081/2023-2024 2177/MD 07/06/2023 30 UTTAM KUMAR GHOSH 21.68 21.68 100 100
4 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Acceptance cum formal work order for Providing Functional House hold Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and Jal Swapna) under Command area of Augmentation of TILASAN Piped Water Supply Scheme at Habibpur Dev. Block, under Malda Division, P.H.E. Dte. in the District of Malda. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000082/2023-2024 2178//MD 07/06/2023 30 UTTAM KUMAR GHOSH 13.35 12.19 91.31 100
5 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Acceptance cum formal work order for Design, Preparation & Submission of DPR as per existing route survey data for Augmentation of TILASAN Piped Water Supply Scheme under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Biswajit Gosh, Junior Engineer,Shreya Das, Junior Engineer ORD/000539/2021-2022 2693/MD 09/09/2021 7 RADIANT 1.25 1.25 100 1
6 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Acceptance cum formal work order for Dismentling of Concrete road and Construction the same from Head Work site to 2nd Tube Well Site of TILASAN Water Supply Scheme at Habibpur Dev. Block under Malda Division, P.H.E. Dte. In the district of Malda. Mr. Arnab Giri, Assistant Engineer ORD/000785/2022-2023 1443/MD 29/03/2023 30 M/S EHAN ENTERPRISE 3.15 3.15 100 100
7 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) and Laying of 90 mm dia (OD) uPVC Pipeline under command area of AUGMENTATION OF TILASAN Water Supply Scheme at Habibpur Dev. Block under Malda Division, PHE Dte. in the district of Malda. Mr. Arnab Giri, Assistant Engineer Mukaddar Parvage, Junior Engineer ORD/001036/2023-2024 1262/MD 15/03/2024 45 SATTWIK CONSTRUCTION 7.44 0.00 0 0
8 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Material Requisition To Resource Division RTOR000005/2022-2023 1107/MD 17/05/2022 Resource Division 16.55 0.00 0 0
9 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Material Requisition To Resource Division RTOR000010/2022-2023 1461/MD 22/06/2022 Resource Division 6.78 0.00 0 0
10 MALDAH Malda Division Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Material Requisition To Resource Division RTOR000043/2022-2023 1587/MD 28/03/2023 Resource Division 0.41 0.00 0 0
11 MALDAH Central Drilling Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Hiring of Diesel Driven Motor Cab (BS-IV & Above) having contract carriage permit along with driver for the office of the Calcutta Mecha nical Sub Division-I(D), CDD, P.H.Engineering Dte. For Supervision of JJM related works. Driller In Charge Junior Engineer ORD/000220/2023-2024 13/CMSD-I(D) 15/01/2024 198 AJAY KUMAR 0.94 1.04 110.64 15
12 MALDAH Central Drilling Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation PROVIDING TUBE WELL MATERIALS CONFORMING TO IS: 12818:2010 WITH OTHER WORKS AT SITE FOR CONSTRUCTION OF TUBE WELL AT TILASAN, HABIBPUR BLOCK, MALDA DISTRICT UNDER CDD, PHE DTE. ORD/000241/2022-2023 347/CMSD-I 25/07/2022 15 CHANDA ENTERPRISE 4.69 4.43 94.46 0
13 MALDAH Central Drilling Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation SUPPLY & DELIVERY OF CONSUMBLES WITH OTHER WORKS AT SITEFOR CONSTRUCTION OF TUBE WELL AT JAGJIBANPUR, HABIBPUR BLOCK, MALDA DISTRICT UNDER CDD, PHE DTE. ORD/000242/2022-2023 346/CMSD-I 25/07/2022 15 CHANDA ENTERPRISE 4.66 1.40 30.04 0
14 MALDAH Malda Mechanical Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components of Augmentation for T/W no.- I of Tilason Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/009047) Assistant Engineer - II Junior Engineer-03 ORD/000253/2023-2024 2226/MLMD 18/07/2023 120 SUBRATA KUMAR DAS. 10.08 6.06 60.12 0
15 MALDAH Malda Mechanical Augmentation of Tilasan Piped water supply scheme , SM/09567 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components of Augmentation for T/W no.- II of Tilason Water Supply Scheme in the District of Malda under Malda Mechanical Division, PHE Dte. (TSM/009047) Assistant Engineer - II Junior Engineer-03 ORD/000254/2023-2024 2227/MLMD 18/07/2023 120 JOY ENTERPRISE. 7.57 0.00 0 0
Total 283.24 218.99 77.32