Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 128.3 43.66 34.03  
1 MALDAH Malda Division Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of MIANAGAR Water Supply Scheme , SM/06867 Retrofitting Formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of MIANAGAR Water Supply Scheme at Habibpur Block under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Ziaur Rahaman, Junior Engineer ORD/000072/2020-2021 2439/MD 12/10/2020 45 M/S AMIT KUMAR GUPTA 72.29 36.59 50.62 66
2 MALDAH Malda Division Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of MIANAGAR Water Supply Scheme , SM/06867 Retrofitting Acceptance cum formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of Uttar Chandipur Zone-IV Water Supply Scheme at Manikchak Dev. Block under Malda Division, PHE Dte. in the district of Malda. (Phase-III) Mr. Arnab Giri, Assistant Engineer,Mr. Sumit Kumar Ghosh, Assistant Engineer Mr. Tilok Roy, Junior Engineer,Sumit Kumar Ganguly, Junior Engineer ORD/000124/2022-2023 1642/MD 19/07/2022 30 M/S AMIT KUMAR GUPTA 16.26 0.04 0.25 1
3 MALDAH Malda Division Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of MIANAGAR Water Supply Scheme , SM/06867 Retrofitting Acceptance cum formal work order for Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA ) under command area of MAHESHPUR Water Supply Scheme at Ratua-I Block under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Sumit Kumar Ganguly, Junior Engineer ORD/000132/2020-2021 2442/MD 12/10/2020 30 M/S PRATIMA CONSTRUCTION 14.91 0.00 0 1
4 MALDAH Malda Division Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of MIANAGAR Water Supply Scheme , SM/06867 Retrofitting Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of MIANAGAR Water Supply Scheme under Malda Division, PHE Dte. Mr. Arnab Giri, Assistant Engineer Sumit Kumar Ganguly, Junior Engineer ORD/000551/2020-2021 2439/MD 12/10/2020 120 M/S AMIT KUMAR GUPTA 20.00 7.03 35.15 0
5 MALDAH Malda Division Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SWAPNA) under command area of MIANAGAR Water Supply Scheme , SM/06867 Retrofitting Acceptance cum formal work order for Laying of UPVC pipe line in place of damaged portion due to the construction of PMGSY road at KANDARAN ZONE-I Water Supply Scheme under Malda Division PHE. Dte in The District of Malda. (Part-III) Mr. Arnab Giri, Assistant Engineer Sumit Kumar Ganguly, Junior Engineer ORD/000576/2021-2022 36/CSD 07/01/2022 20 M/S FOUR STAR CONSTRUCTION 4.84 0.00 0 1
Total 128.30 43.67 34.04