Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
1 110.01 0 0  
1 DAKSHIN DINAJPUR Malda Mechanical Design, Supply and Installation of different capacity Solar Power Plant at various water work station of Gangarampur Sub Surface Water Based Piped Water Supply Scheme with Net Metering Arrangement, Monitoring System in the district of Dakshin Dinajpur un , SM/17676 IOT Design, Supply and Installation of different capacity Solar Power Plant at Gangarampur Western Water Work Station (Kantatoir, 2X315 KVA Substation), Gangarampur Eastern Water Works Station (Jahangirpur, 2 x 500 KVA Substation) and GLR Water Works Station (Banihari of Gangarampur Eastern Sector, 150 KVA Substation) within Gangarampur Block of Tapan-Gangarampur Sub Surface Water Based Piped Water Supply Scheme with Net Metering Arrangement, Monitoring System in the district of Dakshin Dinajpur under Malda Mechanical Division, PHE Dte. Assistant Engineer - I Junior Engineer-07 ORD/000067/2024-2025 1635/MLMD 21/06/2024 90 WATER TECH 110.01 0.00 0 0
Total 110.01 0.00 0