Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 449.07 255.07 56.8  
1 COOCHBEHAR Coochbehar Division Augmentation of PURBA FULKARDABRI Piped water supply schemes. , SM/10162 Augmentation HIRING VEHICLE BILL/00480/2024-2025 BP-212 31/07/2024 BHAGWATI BHUJEL 0.66 0.00 0 0
2 COOCHBEHAR Coochbehar Division Augmentation of PURBA FULKARDABRI Piped water supply schemes. , SM/10162 Augmentation HIRING VEHICLE BILL/00489/2024-2025 null 01/06/2024 ANIMESH DHAR CHOUDHURY 0.36 0.00 0 0
3 COOCHBEHAR Coochbehar Division Augmentation of PURBA FULKARDABRI Piped water supply schemes. , SM/10162 Augmentation Providing FHTC, Repairing of reservoir and laying new Pipe line and other allied works at in-connection with augmentation PURBA FULKAR DABRI PWSS under Cooch Behar Division, PHED.(Part-C) ASSISTANT ENGINEER, RWS COOCHBEHAR SUB-DIVISION JUNIOR ENGINEER, RWS COOCH BEHAR SUB-DIVISION ORD/000005/2022-2023 21/CD 07/04/2022 120 BABA LOKENATH UN EMPLOYED ENGINEERS CO OP SOCIETY LTD 66.67 57.76 86.64 1
4 COOCHBEHAR Coochbehar Division Augmentation of PURBA FULKARDABRI Piped water supply schemes. , SM/10162 Augmentation Providing FHTC, Construction of pump house, Boundary wall at additional T/W site and laying of Pipe line and other allied works at in-connection with augmentation of PURBA FULKAR DABRI PWSS under Cooch Behar Division, PHED. (Part-B) ASSISTANT ENGINEER, RWS COOCHBEHAR SUB-DIVISION JUNIOR ENGINEER, RWS COOCH BEHAR SUB-DIVISION ORD/000006/2022-2023 22/CD 07/04/2022 120 NABIN DEBNATH 82.64 57.59 69.69 1
5 COOCHBEHAR Coochbehar Division Augmentation of PURBA FULKARDABRI Piped water supply schemes. , SM/10162 Augmentation Providing FHTC, Repairing of Boundary wall, Pump house & Blower room, and laying of Pipe line and other allied works at in-connection with augmentation of PURBA FULKARDABRI PWSS under Cooch Behar Division, PHED.(Part-A) ASSISTANT ENGINEER, RWS COOCHBEHAR SUB-DIVISION JUNIOR ENGINEER, RWS COOCH BEHAR SUB-DIVISION ORD/000007/2022-2023 23/CD 07/04/2022 120 MANABENDRA DE 85.75 75.75 88.34 1
6 COOCHBEHAR Coochbehar Division Augmentation of PURBA FULKARDABRI Piped water supply schemes. , SM/10162 Augmentation Sinking of 250mm x 200 mm Big dia. Tube well with UPVC Pipes & Strainer at 3rd Site of PURBA FULKADABRI PWSS under Cooch Behar Division PHE Dte. ASSISTANT ENGINEER, RWS COOCHBEHAR SUB-DIVISION JUNIOR ENGINEER, RWS COOCH BEHAR SUB-DIVISION ORD/000065/2022-2023 262/CD 24/05/2022 45 LONGLAST PIPES (INDIA) PVT. LTD. 12.00 0.00 0 0
7 COOCHBEHAR Coochbehar Division Augmentation of PURBA FULKARDABRI Piped water supply schemes. , SM/10162 Augmentation Providing FHTC and Laying of pipe line and other allied work at PURBA FULKARDABRI PWSS under JAL JEEVAN MISSION.(Part-E) ASSISTANT ENGINEER, RWS COOCHBEHAR SUB-DIVISION JUNIOR ENGINEER, RWS COOCH BEHAR SUB-DIVISION ORD/000335/2022-2023 984/CD 29/09/2022 60 ASHIT KUMAR SINGHA 60.18 43.43 72.17 1
8 COOCHBEHAR Coochbehar Division Augmentation of PURBA FULKARDABRI Piped water supply schemes. , SM/10162 Augmentation Shifting of Pipe line incl River Crossing with suppurting RSJ pile at Kangratoli immigr. Rd. at PURBA FULKADABRI PWSS under Cooch Behar Division, PHED ASSISTANT ENGINEER, RWS COOCHBEHAR SUB-DIVISION JUNIOR ENGINEER, RWS COOCH BEHAR SUB-DIVISION ORD/000408/2021-2022 1466/CD 10/03/2022 30 MANABENDRA DE 35.47 20.54 57.91 1
9 COOCHBEHAR Coochbehar Division Augmentation of PURBA FULKARDABRI Piped water supply schemes. , SM/10162 Augmentation Providing functional house hold tap connection (unmetered) 135 nos. in Upen chowki KuchlibariPiped Water Supply Scheme under Mathabhanga Sub-Division, P.H.E.Dte. Under Jaldhara Programme. (Part-C) ASSISTANT ENGINEER, RWS COOCHBEHAR SUB-DIVISION JUNIOR ENGINEER, RWS COOCH BEHAR SUB-DIVISION ORD/000445/2021-2022 450/MTB 04/03/2022 15 SANJAY MANDAL 4.98 0.00 0 1
10 COOCHBEHAR Coochbehar Division Augmentation of PURBA FULKARDABRI Piped water supply schemes. , SM/10162 Augmentation Material Requisition To Resource Division RTOR000003/2023-2024 106/CD 26/04/2023 Resource Division 29.60 0.00 0 0
11 COOCHBEHAR Coochbehar Division Augmentation of PURBA FULKARDABRI Piped water supply schemes. , SM/10162 Augmentation Material Requisition To Resource Division RTOR000047/2022-2023 1370/CD 22/12/2022 Resource Division 29.75 0.00 0 0
12 COOCHBEHAR Coochbehar Division Augmentation of PURBA FULKARDABRI Piped water supply schemes. , SM/10162 Augmentation FHTC VCH/001690/2021-2022 BP_2021_22_506 31/03/2022 SHIBA ENTERPRISE 28.89 0.00 0 0
13 COOCHBEHAR Coochbehar Division Augmentation of PURBA FULKARDABRI Piped water supply schemes. , SM/10162 Augmentation COST OF PIPE VCH/001699/2021-2022 BP_2021_22_415 04/03/2022 EXECUTIVE ENGINEER RESOURCES DIVISION P.H.E.DTE. 1.11 0.00 0 0
14 COOCHBEHAR Northern Mechanical Division II Augmentation of PURBA FULKARDABRI Piped water supply schemes. , SM/10162 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Augumentation of Purba Fulkardabri water supply scheme, TW no III under Northern Mechanical Division-II, PHE Dte.Alipurduar ORD/000849/2023-2024 2429/NMD-II 10/08/2023 30 M/S RATAN KUMAR DASGUPTA & CO. 11.01 0.00 0 0
Total 449.06 255.08 56.8