Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 99.05 0 0  
1 COOCHBEHAR Coochbehar Division Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Baro pinjarir Jhar Water Supply Scheme , SM/08165 Retrofitting Providing FHTC & Laying P/Line at BARO PINJARERJHAR PWSS under Cooch Behar Division, PHED ASSISTANT ENGINEER, MATHABHANGA SUB-DIVISION JUNIOR ENGINEER, MATHABHANGA SUB-DIVISION ORD/000019/2022-2023 35/CD 07/04/2022 45 PATLAKHOWA UN EMP CO OP LAB CONT AND CONST SOC LTD 26.88 0.00 0 1
2 COOCHBEHAR Coochbehar Division Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Baro pinjarir Jhar Water Supply Scheme , SM/08165 Retrofitting PAYMENT TO EE RES VCH/001339/2021-2022 BP-2021-22-400 22/02/2022 EXECUTIVE ENGINEER RESOURCES DIVISION P.H.E.DTE. 3.06 0.00 0 0
3 COOCHBEHAR Coochbehar Division Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Baro pinjarir Jhar Water Supply Scheme , SM/08165 Retrofitting PAYMENT TO RES VCH/001344/2021-2022 BP-2021-22-400 22/02/2022 EXECUTIVE ENGINEER RESOURCES DIVISION P.H.E.DTE. 46.94 0.00 0 0
4 COOCHBEHAR Coochbehar Division Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Baro pinjarir Jhar Water Supply Scheme , SM/08165 Retrofitting FHTC VCH/001660/2021-2022 BP_2021_22_479 25/03/2022 TAPAN CHANDA 17.81 0.00 0 0
5 COOCHBEHAR Coochbehar Division Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Baro pinjarir Jhar Water Supply Scheme , SM/08165 Retrofitting COST PIPES VCH/001753/2021-2022 BP-2021_22_415 04/03/2022 EXECUTIVE ENGINEER RESOURCES DIVISION P.H.E.DTE. 4.36 0.00 0 0
Total 99.05 0.00 0