Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 424.83 61.33 14.44  
1 JALPAIGURI Siliguri W/S Division Augmentation of Porjhar Pipe Water Supply Scheme , SM/15302 Augmentation PREPARATION OF DETAILS PROJECT REPORT (DPR) INCLUDING ROUTE SURVEY IN CONNECTION WITH AUGMENTATION OF PORJHAR PIPED WATER SUPPLY SCHEME UNDER RAJGANJ BLOCK, JALPAIGURI DISTRICT UNDER SILIGURI W/S DIVISION, P.H.E. DTE Assistant Engineer(Civil) Junior Engineer (Civil) ORD/000071/2023-2024 264/SSD 05/06/2023 10 ENVIROTECH SOLUTIONS 2.77 1.39 50.18 30
2 JALPAIGURI Siliguri W/S Division Augmentation of Porjhar Pipe Water Supply Scheme , SM/15302 Augmentation Laying distribution system,risingmain,installation of iron elemination plant, pump houses ,boundary walls ,functional house hold tap connection (FHTC) and other allied works under Jal Jeevan Mission (JJM) for Augmentation of PORJHAR Piped Water Supply Scheme under Rajganj Block under Siliguri Sub Division, P.H.E. Dte. Assistant Engineer(Civil) Junior Engineer (Civil) ORD/000111/2023-2024 1158/SWSD 09/08/2023 240 AKASH ENTERPRISE 356.29 50.97 14.31 70
3 JALPAIGURI Siliguri W/S Division Augmentation of Porjhar Pipe Water Supply Scheme , SM/15302 Augmentation Material Requisition To Resource Division RTOR000086/2022-2023 2211/SWSD 05/01/2023 Resource Division 31.37 0.00 0 0
4 JALPAIGURI Northern Mechanical Augmentation of Porjhar Pipe Water Supply Scheme , SM/15302 Augmentation New Service Connection Charge for PORAJHAR, T/W No. I, under SHIVMANDIR CCC [APPLICATION NO. 4003332364 , Reference ID : 403156961] BILL/02007/2023-2024 BP/23-24/308 09/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.78 0.00 0 0
5 JALPAIGURI Northern Mechanical Augmentation of Porjhar Pipe Water Supply Scheme , SM/15302 Augmentation New Service Connection Charge for PORAJHAR, T/W No. II, under SHIVMANDIR CCC [APPLICATION NO. 4003332377 , Reference ID : 403156964] BILL/02008/2023-2024 BP/23-24/308 09/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 5.14 0.00 0 0
6 JALPAIGURI Northern Mechanical Augmentation of Porjhar Pipe Water Supply Scheme , SM/15302 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for AUGMENTATION OF PORJHAR PWSS,ZONE-I,TW NO-I AND ZONE-II,TW NO-I in the district of Jalpaiguri under Northern Mechanical Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000355/2023-2024 1316/NMD 04/08/2023 30 S.D. CONCERN WORKSHOP 23.48 8.97 38.2 70
Total 424.82 61.32 14.44