Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15 618.73 66.34 10.72  
1 JALPAIGURI Maynaguri Jalpaiguri Division Chapgar Piped Water Supply Scheme. , SM/18492 New Supply of Fuel (diesel) of vehicle no-WB 71 A 5774 for the month of June 2024 BILL/00397/2024-2025 BP-2024-25-232 18/07/2024 FILL & SMILE 0.23 0.00 0 null
2 JALPAIGURI Maynaguri Jalpaiguri Division Chapgar Piped Water Supply Scheme. , SM/18492 New Supply of Fuel (diesel) of vehicle no-WB 71 A 5774 for the month of April 2024 BILL/00398/2024-2025 BP-2024-25-233 18/07/2024 FILL & SMILE 0.23 0.00 0 null
3 JALPAIGURI Maynaguri Jalpaiguri Division Chapgar Piped Water Supply Scheme. , SM/18492 New Supply mobil to vehicle no WB 71 A 5774 BILL/00399/2024-2025 BP-2024-25-270 30/07/2024 FILL & SMILE 0.02 0.00 0 null
4 JALPAIGURI Maynaguri Jalpaiguri Division Chapgar Piped Water Supply Scheme. , SM/18492 New Supply of Fuel (diesel) of vehicle no-WB 71 A 5774 for the month of August 2024 BILL/00650/2024-2025 null 10/09/2024 FILL & SMILE 0.21 0.00 0 null
5 JALPAIGURI Maynaguri Jalpaiguri Division Chapgar Piped Water Supply Scheme. , SM/18492 New Supply mobil to vehicle no WB 71 A 5774 BILL/00651/2024-2025 null 10/09/2024 FILL & SMILE 0.02 0.00 0 null
6 JALPAIGURI Maynaguri Jalpaiguri Division Chapgar Piped Water Supply Scheme. , SM/18492 New SOIL TEST CONDUCTION AND SUBMISSION OF REPORT FOR 42 NOS. SITE AT DIFFERENT HEAD WORKS OF DIFFERENT PIPED WATER SUPPLY SCHEMES LOCATED AT JALPAIGURI SADAR BLOCK,MAYNAURI BLOCK AND KRANTI BLOCK UNDER JALPAIGURI DIVISION ,P.H.E Dte. BILL/01426/2023-2024 BP-2024-25-1 03/04/2024 DR. AMBARISH GHOSH 44.43 0.00 0 0
7 JALPAIGURI Maynaguri Jalpaiguri Division Chapgar Piped Water Supply Scheme. , SM/18492 New Continuation Work order for Supply of 1 (One) Maxi cub with Engine capacity Less than or equal to 2000 CC. on hire basis including driver for Assistant Engineer Jalpaiguri R. W.S Sub-Division P.HE. Dte. for 6 month (Period from 01/08/2024 to 31/01/2025) Assistant Engineer Junior Engineer ORD/000054/2024-2025 709/RWS 31/07/2024 180 ASHIM SARKAR 0.88 0.29 32.95 0
8 JALPAIGURI Maynaguri Jalpaiguri Division Chapgar Piped Water Supply Scheme. , SM/18492 New Execution of Wall writing for creating awareness program in connection with Jal Jeevan Mission for Part-C of Maynaguri Block under Jalpaiguri Division P.H.E. Dte. Assistant Engineer ORD/000070/2024-2025 985/JD 14/08/2024 15 LIMRA SOCIAL WELFARE SOCIETY 4.63 0.00 0 0
9 JALPAIGURI Maynaguri Jalpaiguri Division Chapgar Piped Water Supply Scheme. , SM/18492 New Construction of different components of Chapgar (Zone-I & II) PWSS i.e. TW, Pump Houses, Water distribution Network , OHR, RISING MAIN, FHTC etc. In connection with Jal Jeevan Mission at Block -Maynaguri under Jalpaiguri Division, P.H.E Dte. Assistant Engineer Junior Engineer ORD/000264/2023-2024 944/JD 08/08/2023 180 UNIBRO INFRASERV PRIVATE LIMITED 488.00 48.43 9.92 34
10 JALPAIGURI Maynaguri Jalpaiguri Division Chapgar Piped Water Supply Scheme. , SM/18492 New Facelifting and Interior furishing works for Junior Engineer Room-1 and DPMU Room under Jalpaiguri Division, PHE Dte. Assistant Engineer Junior Engineer 2 ORD/000555/2023-2024 501/JSSD 02/01/2024 45 BREATHING SPACE DESIGN & VAASTU CONSULTANTS 9.65 8.58 88.91 100
11 JALPAIGURI Maynaguri Jalpaiguri Division Chapgar Piped Water Supply Scheme. , SM/18492 New Facelifting and Interior furnishing works for Junior Engineer Room-2 and Estimating Section under Jal;paiguri Division,P.H.E.Dte. Assistant Engineer Junior Engineer 2 ORD/000556/2023-2024 502/JSSD 02/01/2024 45 BREATHING SPACE DESIGN & VAASTU CONSULTANTS 9.66 9.04 93.58 100
12 JALPAIGURI Maynaguri Jalpaiguri Division Chapgar Piped Water Supply Scheme. , SM/18492 New Material Requisition To Resource Division RTOR000200/2023-2024 2061/JD 10/01/2024 Resource Division 9.79 0.00 0 0
13 JALPAIGURI Maynaguri Northern Mechanical Chapgar Piped Water Supply Scheme. , SM/18492 New New Service Connection Charge for CHAPGAR, ZONE-I,T/W-I under MAYNAGURI CCC APPLICATION NO. 4003376095 Reference ID : 403191643 BILL/00151/2024-2025 BP/24-25/25 09/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 3.54 0.00 0 null
14 JALPAIGURI Maynaguri Northern Mechanical Chapgar Piped Water Supply Scheme. , SM/18492 New New Service Connection Charge for CHAPGAR, ZONE-I,T/W-II under MAYNAGURI CCC APPLICATION NO. 4003379456 Reference ID : 403196953 BILL/00205/2024-2025 BP/24-25/14 23/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 3.68 0.00 0 null
15 JALPAIGURI Maynaguri Northern Mechanical Chapgar Piped Water Supply Scheme. , SM/18492 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for CHAPGAR PWSS, Zone-I,II at TW no I & II in the district of Jalpaiguri under Northern Mechanical Division, PHE Dte. Assistant Engineer , Head Quarters , NMD Junior Engineer ORD/000611/2023-2024 1343/NMD 08/08/2023 30 SUNRISE ENGINEERING CORPORATION 43.76 0.00 0 0
Total 618.71 66.34 10.72