Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 83.45 18.32 21.95  
1 JALPAIGURI Jalpaiguri Division Rejuvenation of Purba Duramari Piped Water Supply Scheme , SM/15326 Augmentation Construction of different components of Rejuvenation of Purba Duramari PWSS i.e. TW, Pump Houses, Boundary Walls, Water Distribution Network, FHTC, Rising Main etc. in connection with Jal Jeevan Mission at Block - Dhupguri under Jalpaiguri Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/000085/2023-2024 334/JD 22/05/2023 60 MONTOSH GHOSH 41.09 12.33 30.01 35
2 JALPAIGURI Jalpaiguri Division Rejuvenation of Purba Duramari Piped Water Supply Scheme , SM/15326 Augmentation Providing Functional Household Tap Connection in connection with Jaldhara / Jalswapna near Dhangkali road, Simul Jhora and allied area for Purba Duramari Piped Water Supply Scheme under Jalpaiguri Division, PHE Dte. (Phase-IV) Assistant Engineer Junior Engineer ORD/000125/2023-2024 803/JD. 24/07/2023 21 DEEP CONSTRUCTION 10.93 2.10 19.21 0
3 JALPAIGURI Jalpaiguri Division Rejuvenation of Purba Duramari Piped Water Supply Scheme , SM/15326 Augmentation Material Requisition To Resource Division RTOR000096/2023-2024 1051/JD 24/08/2023 Resource Division 3.45 0.00 0 0
4 JALPAIGURI Northern Mechanical Rejuvenation of Purba Duramari Piped Water Supply Scheme , SM/15326 Augmentation New Service Connection Charge for new service connection at REJUVENATION OF PURBA DURAMARI PWSS,T/W-III, GAIRKATA CCC APPLICATION NO. 4003460491 Reference ID : 403255265 BILL/00974/2024-2025 BP/24-25/166 14/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.82 0.00 0 null
5 JALPAIGURI Northern Mechanical Rejuvenation of Purba Duramari Piped Water Supply Scheme , SM/15326 Augmentation Infrastructure development cost for new service connection at REJUVENATION OF PURBA DURAMARI PWSS,T/W-III, GAIRKATA CCC APPLICATION NO. 100000115667 Reference ID : 860308377 BILL/00975/2024-2025 BP/24-25/166 14/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 15.66 0.00 0 null
6 JALPAIGURI Northern Mechanical Rejuvenation of Purba Duramari Piped Water Supply Scheme , SM/15326 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for REJUVENATION OF PURBA DURAMARI PWSS, TW NO- III in the district of Jalpaiguri under Northern Mechanical Division, PHE Dte. Driller-in-Charge Junior Engineer ORD/000182/2023-2024 1219/NMD 26/07/2023 30 BONANZA ENTERPRISE 11.50 3.89 33.83 60
Total 83.45 18.32 21.95