Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 172.04 65.42 38.03  
1 JALPAIGURI Jalpaiguri Division Rejuvenation of Karbala Tea Garden Piped Water Supply Scheme , SM/15298 Augmentation Construction of different components of Rejuvenation of Karbala Tea Garden PWSS i.e. TW, Pump Houses, Boundary Walls, Water Distribution Network, FHTC, Rising Main etc. in connection with Jal Jeevan Mission at Block - Banarhat under Jalpaiguri Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/000014/2023-2024 41/JD 13/04/2023 90 MALAY BHOWMIK 110.90 48.88 44.08 85
2 JALPAIGURI Jalpaiguri Division Rejuvenation of Karbala Tea Garden Piped Water Supply Scheme , SM/15298 Augmentation Sinking of Big dia Tube well 250x200mm dia using MS Slotted strainer at required depth by Reverse Rotary method of drilling for Karbala Tea Garden Pipe Water Supply Scheme in connection with Jal Jeevan Mission at Block - Banarhat under Jalpaiguri Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000297/2023-2024 1355/JD 26/09/2023 30 EFFLUENT AND WATERTREATEMENT ENGINEERS(P) LTD. 20.38 7.98 39.16 100
3 JALPAIGURI Jalpaiguri Division Rejuvenation of Karbala Tea Garden Piped Water Supply Scheme , SM/15298 Augmentation Material Requisition To Resource Division RTOR000057/2023-2024 1095/JD 24/08/2023 Resource Division 12.32 0.00 0 0
4 JALPAIGURI Northern Mechanical Rejuvenation of Karbala Tea Garden Piped Water Supply Scheme , SM/15298 Augmentation New Service Connection Charge for REJU KARBALA TEA GARDEN, T/W No. I, under BANARHAT CCC [APPLICATION NO. 4003333217 , Reference ID : 403157469] BILL/02003/2023-2024 BP/23-24/308 09/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.61 0.00 0 0
5 JALPAIGURI Northern Mechanical Rejuvenation of Karbala Tea Garden Piped Water Supply Scheme , SM/15298 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for REJUVENATION OF KARBALA TG PWSS, TW no I and II in the district of Jalpaiguri under Northern Mechanical Division, PHE Dte. Driller-in-Charge Junior Engineer ORD/000414/2023-2024 1328/NMD 08/08/2023 30 AHALYA ENGINEERING WORKS 23.83 8.56 35.92 60
Total 172.05 65.42 38.02