Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 130.48 19.75 15.14  
1 JALPAIGURI Jalpaiguri Division Rejuvenation of Mathachulka Piped Water Supply Scheme , SM/15098 Augmentation Repairing of Pump House ( 1st site ), boundary wall ( 1st site ) and other Allied works at MATHACHULKA Piped Water Supply Scheme under Jalpaiguri Division ,P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000115/2022-2023 92/JSSD 22/07/2022 15 DEBABRATA SARKAR 4.62 0.00 0 100
2 JALPAIGURI Jalpaiguri Division Rejuvenation of Mathachulka Piped Water Supply Scheme , SM/15098 Augmentation Construction of different components of Rejuvenation of Mathachulka PWSS i.e. TW, Pump Houses, Boundary Walls, Water Distribution Network, FHTC, Rising Main etc. in connection with Jal Jeevan Mission at Block - Metali under Jalpaiguri Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000141/2023-2024 701/JD 13/07/2023 60 M/S. D.K. DEY & CO.. 77.02 19.75 25.64 70
3 JALPAIGURI Jalpaiguri Division Rejuvenation of Mathachulka Piped Water Supply Scheme , SM/15098 Augmentation Material Requisition To Resource Division RTOR000086/2023-2024 1067/JD 24/08/2023 Resource Division 17.44 0.00 0 0
4 JALPAIGURI Jalpaiguri Division Rejuvenation of Mathachulka Piped Water Supply Scheme , SM/15098 Augmentation Material Requisition To Resource Division RTOR000209/2023-2024 2069/JD 10/01/2024 Resource Division 4.00 0.00 0 0
5 JALPAIGURI Northern Mechanical Rejuvenation of Mathachulka Piped Water Supply Scheme , SM/15098 Augmentation "INFRA COST IRO NSC for (REJU) MATHACHULKA TG PWSS TW NO-III, METELI CCC " APPLICATION NO.100000105524 Reference ID : 860297574 BILL/00246/2024-2025 BP/24-25/25 09/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.59 0.00 0 null
6 JALPAIGURI Northern Mechanical Rejuvenation of Mathachulka Piped Water Supply Scheme , SM/15098 Augmentation "New Service Connection Charge fo MATHACHULKA PWSS TW NO-III, METELI CCC " APPLICATION NO.4003386724 Reference ID : 403200293 BILL/00389/2024-2025 BP/24-25/73 30/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.68 0.00 0 null
7 JALPAIGURI Northern Mechanical Rejuvenation of Mathachulka Piped Water Supply Scheme , SM/15098 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for REJUVENATION OF MATHACHULKA PWSS, TW no III,IV in the district of Jalpaiguri under Northern Mechanical Division, PHE Dte. Assistant Engineer , Head Quarters , NMD Junior Engineer ORD/000172/2023-2024 1214/NMD 26/07/2023 30 MUSTAFI CONCERN 22.13 0.00 0 0
Total 130.49 19.75 15.14