Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 152.39 19.69 12.92  
1 JALPAIGURI Jalpaiguri Division REJUVENATION OF PASCHIM SALBARI PWSS , SM/15076 Augmentation Construction of different components for Rejuvenation of Paschim Salbari PWSS i.e. TW, Pump Houses, Water distribution Network, RISING MAIN, FHTC etc. in connection with Jal Jeevan Mission at Block - Maynaguri under Jalpaiguri Division, P.H.E.Dte. Assistant Engineer Junior Engineer 2 ORD/000039/2023-2024 129/JD 28/04/2023 90 NARAYAN CHANDRA SAHA 112.50 0.00 0 0
2 JALPAIGURI Jalpaiguri Division REJUVENATION OF PASCHIM SALBARI PWSS , SM/15076 Augmentation Emergency repairing of pipe line damaged due to rural road construction and provision for laying of Gas pipe line at different location under Paschim Salbari (Zone - I) Water Supply Scheme under Jalpaiguri Division, PHE Dte. (2nd Call) Assistant Engineer Junior Engineer 2 ORD/000148/2023-2024 812/RWS 14/07/2023 21 SAHA CONSTRUCTION 2.99 1.42 47.49 100
3 JALPAIGURI Jalpaiguri Division REJUVENATION OF PASCHIM SALBARI PWSS , SM/15076 Augmentation "Restoration of DI pipeline earlier damaged under Paschim Salbari Water Supply Scheme (Zone-1) under Jalpaiguri Division PHE Dte. " Assistant Engineer Junior Engineer 2 ORD/000188/2022-2023 554/RWS 01/09/2022 30 B.M CONSTRUCTION 3.28 2.56 78.05 0
4 JALPAIGURI Jalpaiguri Division REJUVENATION OF PASCHIM SALBARI PWSS , SM/15076 Augmentation Providing Functional Household Tap Connection (FHTC) in connection with JJM under the command area of Paschim Salbari (Zone-I) Piped Water Supply Scheme under Jalpaiguri Division, PHE Dte. Assistant Engineer Junior Engineer 2 ORD/000418/2022-2023 170/RWS 28/02/2023 21 SAHA CONSTRUCTION 4.91 4.51 91.85 1
5 JALPAIGURI Jalpaiguri Division REJUVENATION OF PASCHIM SALBARI PWSS , SM/15076 Augmentation Providing Functional Household Tap Connection (FHTC) in connection with JJM under the command area of Paschim Salbari (Zone-II) Piped Water Supply Scheme at Jalpaiguri Block under Jalpaiguri Division, PHE Dte. Assistant Engineer Junior Engineer 2 ORD/000486/2022-2023 284/RWS 29/03/2023 21 PARAMJYOTI ENTERPRISE 4.94 2.46 49.8 100
6 JALPAIGURI Northern Mechanical REJUVENATION OF PASCHIM SALBARI PWSS , SM/15076 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for REJUVENATION OF PASCHIM SALBARI PWSS, TW NO- I,II in the district of Jalpaiguri under Northern Mechanical Division, PHE Dte. Assistant Engineer , Head Quarters , NMD Junior Engineer ORD/000057/2023-2024 572/NMD 17/05/2023 30 M/S JIT ENTERPRISE 23.04 8.74 37.93 50
7 JALPAIGURI Northern Mechanical REJUVENATION OF PASCHIM SALBARI PWSS , SM/15076 Augmentation Supply and Delivery of C.I special as when as required at T/W No-I of PASCHIM SALBARI and other adjacent W/S Scheme under in the Dist. of JALPAIGURI. Assistant Engineer , Head Quarters , NMD Junior Engineer ORD/000070/2024-2025 1059/HQ/NMD 21/06/2024 7 CHOWDHURY AND BASU ENTERPRISE 0.73 0.00 0 0
Total 152.39 19.69 12.92