Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 107.85 16.36 15.17  
1 JALPAIGURI Jalpaiguri Division Rejuvenation of Nagaisuree Tea Garden Area Piped Water Supply Scheme , SM/15060 Augmentation Providing Inspection Vehicle WB-71B-9586 for JJM on daily basis @12.00/Km for Official use of the Assistant Engineer, Jalpaiguri Sadar-Sub Division P.H.E. Dte (OCT 2023 TO DEC 2023) BILL/01202/2023-2024 BP-2023-24-637 09/02/2024 DHIRAJ BISWAS 1.20 0.00 0 0
2 JALPAIGURI Jalpaiguri Division Rejuvenation of Nagaisuree Tea Garden Area Piped Water Supply Scheme , SM/15060 Augmentation Sinking of 2 Nos. Big Dia Tube Well by Modified DTH - ODEX Method at Yong Tong Tea Gargen Piped Water Supply Scheme under Jalpaiguri Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000016/2024-2025 532/JD 28/06/2024 30 EFFLUENT AND WATERTREATEMENT ENGINEERS(P) LTD. 33.23 0.00 0 100
3 JALPAIGURI Jalpaiguri Division Rejuvenation of Nagaisuree Tea Garden Area Piped Water Supply Scheme , SM/15060 Augmentation Construction of different components of Rejuvenation of Nagaisuree Tea Garden PWSS i.e. 3rd Site Boundary Walls, Rising Main etc. in connection with Jal Jeevan Mission at Block - Matiali under Jalpaiguri Division, P.H.E.Dte. (Part-A) Assistant Engineer Junior Engineer ORD/000096/2023-2024 335/JD 22/05/2023 30 BAJRANG ENTERPRISE 7.79 3.87 49.68 100
4 JALPAIGURI Jalpaiguri Division Rejuvenation of Nagaisuree Tea Garden Area Piped Water Supply Scheme , SM/15060 Augmentation Sinking of Big Dia Tube well by Modified DTH - ODEX Method at 5th & 6th tube well site of Nagaisuree Tea Garden Piped Water Supply Scheme of Matiali Block in connection with Jal Jeevan Mission under Jalpaiguri Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000108/2024-2025 0602 04/09/2024 30 EFFLUENT AND WATERTREATEMENT ENGINEERS(P) LTD. 35.23 9.00 25.55 0
5 JALPAIGURI Jalpaiguri Division Rejuvenation of Nagaisuree Tea Garden Area Piped Water Supply Scheme , SM/15060 Augmentation Construction of different components of Rejuvenation of Nagaisuree Tea Garden PWSS i.e. 4th Site Boundary Walls, Rising Main etc. in connection with Jal Jeevan Mission at Block - Matiali under Jalpaiguri Division, P.H.E.Dte. (Part-B) Assistant Engineer Junior Engineer ORD/000293/2023-2024 1414/JD 03/10/2023 30 ARUP SARKAR 7.02 3.49 49.72 100
6 JALPAIGURI Jalpaiguri Division Rejuvenation of Nagaisuree Tea Garden Area Piped Water Supply Scheme , SM/15060 Augmentation Material Requisition To Resource Division RTOR000093/2023-2024 1052/JD 24/08/2023 Resource Division 23.38 0.00 0 0
Total 107.84 16.35 15.16