Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
23 631.09 237.33 37.61  
1 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation FUEL SUPPLY BILL/00128/2022-2023 BP-2022-23-403 17/01/2023 FILL & SMILE 1.71 0.00 0 0
2 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation ETDS BILL/00129/2022-2023 BP-2022-23-405 17/01/2023 SUSHIL KUMAR SINGHA 0.08 0.00 0 0
3 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation ETDS BILL/00130/2022-2023 BP-2022-23-406 17/01/2023 SUSHIL KUMAR SINGHA 0.13 0.00 0 0
4 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation SUPPLY OF SHARP TONNER CARTRIDGE BILL/00131/2022-2023 BP-2022-23-404 17/01/2023 QUATTRON 0.17 0.00 0 0
5 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation hire chages BILL/00247/2022-2023 BP-2022-23-438 03/02/2023 LOKNATH CONSTRUCTION 0.52 0.00 0 0
6 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation Sinking of 1 No. 250mm x 150mm x 138m deep Rig Bored tube well by Reverse Rotary method of drilling for Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme under Jalpaiguri Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000010/2022-2023 871/JD 04/04/2022 21 UNIBRO INFRASERV PRIVATE LIMITED 8.00 7.72 96.5 100
7 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation Construction of Boundary Wall with Pump House (3.6mx2.4m) and Sinking of tube well by reverse rotary method of Drilling for 4th TW including Delivery main for Augmentation of Dakshin Chak Moulani PWSS under Jal Jeevan Mission under Jalpaiguri Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/000022/2024-2025 671/JD 16/07/2024 60 M/S S. G. ENTERPRISE 19.97 0.00 0 0
8 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation Construction of Boundary Wall at 3rd Pump House site with land development, inside peripheral drain, gate, pathway and other ancillary works for Augmentation Dakshin Chakmoulani Piped Water Supply Scheme under Jalpaiguri Division,P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000107/2022-2023 83/JSSD 22/07/2022 20 CHANDAN GHOSH 4.56 2.20 48.25 100
9 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation Construction of Rig approach for Installation of tubewell 3rd Tube Well site for Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme under Jalpaiguri Division,P.H.E.Dte. Assistant Engineer Junior Engineer ORD/000108/2022-2023 85/JSSD 22/07/2022 7 ALICK DUTTA 0.81 0.81 100 100
10 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation Balance work i.c.w Laying Rising Main from 1st, 2nd & 3rd Tubewell site OHR Aug. of Dakshin Chak Moulani PWSS in connection with Jal Jeevan Mission at Block- Kranti under Jalpaiguri Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/000117/2024-2025 230/JSSD 10/09/2024 10 SADHAN KARMAKAR 0.64 0.00 0 0
11 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation Laying Distribution System providing with Functional Household Tap Connection (FHTC) in connection with Jal Swapna / JJM for Augmentation of Dakhin Chak Moulani Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. Junior Engineer ORD/000348/2021-2022 211/JD 24/01/2022 60 UNIBRO INFRASERV PRIVATE LIMITED 426.83 200.42 46.96 80
12 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation Construction of 300 CuM Over Head Reservoir (OHR) (Staging Height 20 Mtr.) as per departmental design and drawing with land development works for Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000349/2023-2024 1437/JD 05/10/2023 180 M/S. D.K. DEY & CO.. 91.09 14.83 16.28 35
13 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation Continuation Order for the work ¿Supply of (one) Maxi Cab with engine capacity more than 2000 C.C on hire basis including driver for Assistant Engineer, Jalpaiguri Sadar Sub- Division, P.H.E. Dte. Dist. Jalpaiguri (with valid Taxi Permit)¿ from 01.10.2022 to 31.12.2022. Assistant Engineer Junior Engineer ORD/000358/2022-2023 248/JSSD 28/09/2022 93 TANMOY CHOUDHURY 0.46 0.33 71.74 0
14 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation Continuation Order for the work "Supply of (one) Maxi Cab with engine capacity more than 2000 C.C on hire basis including driver for Assistant Engineer, Jalpaiguri Sadar Sub-Division, P.H.E. Dte. Dist. Jalpaiguri (with valid Taxi Permit)" from 01.01.2023 to 31.03.2023 Assistant Engineer Junior Engineer ORD/000368/2022-2023 348/JSSD 27/12/2022 90 TANMOY CHOUDHURY 0.44 0.40 90.91 0
15 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation Soil Investigation work for 300 CuM Over Head Reservoir (OHR) for Augmentation of Dakshin Chalk Moulani P.W.S.S. under Jalpaiguri Division, P.H.E. Dte. Junior Engineer ORD/000691/2021-2022 1066/JSSD 24/01/2022 20 ASIS ENTERPRISE 1.83 1.81 98.91 0
16 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation Laying Rising Main from Pump Houses to Over Head Reservoir with necessity connections for Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme i.c.w. Jal Jeevan Mission under Jalpaiguri Division, P. H. E. Dte. Assistant Engineer Junior Engineer ORD/000811/2023-2024 566/JSSD 05/03/2024 30 GOURAV CONSTRUCTION CO. 4.03 1.16 28.78 90
17 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation Construction of Pump House (3.60 m X 2.40 m) size including Sanitary and Plumbing works at 3rd TubeWell site for Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. ORD/000831/2021-2022 1109/W/JSSD 27/01/2022 45 M/S M G CONSTRUCTION 4.76 2.35 49.37 100
18 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation LDS DAKSHIN CHALK MOULANI VCH/000046/2022-2023 BP-2021-22-29 27/04/2022 UNIBRO INFRASERV PRIVATE LIMITED 16.42 0.00 0 0
19 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation LDS DAKSHIN CHALK MOULANI VCH/001233/2021-2022 BP-2021-22-361 14/03/2022 UNIBRO INFRASERV PRIVATE LIMITED 31.20 0.00 0 0
20 JALPAIGURI Jalpaiguri Division Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation PREPARATION OF DPR DAKHIN CHAKMOULANI VCH/001282/2021-2022 BP-2021-22-490 09/04/2022 SUBHANKAR GHOSH 1.56 0.00 0 0
21 JALPAIGURI Northern Mechanical Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation New Service Connection Charge for AUGMENTATION OF DAKSHIN CHAK MOULANI, T/W No. III, under KRANTI CCC, [APPLICATION NO. 4003266328, Reference ID : 403105517] BILL/01275/2023-2024 23-24/153&162 12/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.69 0.00 0 0
22 JALPAIGURI Northern Mechanical Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation Infrastructure Cost for AUGMENTATION OF DAKSHIN CHAK MOULANI, T/W No. III, under KRANTI CCC, [APPLICATION NO. 100000093179, Reference ID : 860284829] BILL/01276/2023-2024 23-24/153&162 12/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.87 0.00 0 0
23 JALPAIGURI Northern Mechanical Augmentation of Dakshin Chak Moulani Piped Water Supply Scheme , SM/09561 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for AUGMENTATION OF DAKSHIN CHAK MOULANI PWSS, TW no III in the district of Jalpaiguri under Northern Mechanical Division, PHE Dte. Assistant Engineer , Head Quarters , NMD Junior Engineer ORD/000444/2023-2024 1383/NMD 09/08/2023 30 M/S ROYAL ENTERPRISE 10.32 5.30 51.36 60
Total 631.08 237.33 37.61