Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 36.3 22.35 61.57  
1 JALPAIGURI Jalpaiguri Division Rejuvenation of Khalaigram Piped Water Supply Scheme , SM/09486 Augmentation Laying Rising Main at 3rd Tube Well site of Khalaigram PWSS in connection with JJM under Jalpaiguri Division, PHE Dte. Assistant Engineer,HQ Junior Engineer ORD/000023/2023-2024 123/JD 28/04/2023 14 PRIYABRATA KARMAKAR 8.33 4.01 48.14 80
2 JALPAIGURI Jalpaiguri Division Rejuvenation of Khalaigram Piped Water Supply Scheme , SM/09486 Augmentation Construction of Pump House (3.60 m x 2.40 m) size with sanitary & plumbing arrangement at 3rd tube well site for Khalaigram P.W.S.S. under Jalpaiguri Division P.H.E.Dte. Assistant Engineer,HQ Junior Engineer ORD/000222/2022-2023 1851/JD 16/09/2022 45 MANAB BAKSHI 4.65 4.72 101.51 0
3 JALPAIGURI Jalpaiguri Division Rejuvenation of Khalaigram Piped Water Supply Scheme , SM/09486 Augmentation Sinking of 250 mm x 150mm dia tube well by Reverse Rotary method of drilling for Rejuvenation of Khalaigram PWSS at Dhupguri Block under PHE Dte. Jalpaiguri Division. Junior Engineer ORD/000451/2021-2022 199/JD 21/01/2022 30 UNIBRO INFRASERV PRIVATE LIMITED 8.02 7.05 87.91 1
4 JALPAIGURI Northern Mechanical Rejuvenation of Khalaigram Piped Water Supply Scheme , SM/09486 Augmentation New Service Connection Charge for KHALAIGRAM,DHUBGURU W/S Scheme, T/W No. III, under DHUPGURI CCC, [APPLICATION NO. 4003018666, Reference ID : 402928492] BILL/00034/2022-2023 BP/22-23/130 20/01/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.38 0.00 0 0
5 JALPAIGURI Northern Mechanical Rejuvenation of Khalaigram Piped Water Supply Scheme , SM/09486 Augmentation Infrastructure Cost for KHALAIGRAM,DHUBGURU W/S Scheme, T/W No. III, under DHUPGURI CCC, [APPLICATION NO.100000066803, Reference ID : 860257023] BILL/00035/2022-2023 BP/22-23/130 20/01/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 3.24 0.00 0 0
6 JALPAIGURI Northern Mechanical Rejuvenation of Khalaigram Piped Water Supply Scheme , SM/09486 Augmentation ADDITIONAL WORK Infrastructure Cost for KHALAIGRAM, T/W III, under DHUPGURI CCC [APPLICATION NO. 100000090647, Reference ID : 860281557] BILL/01118/2023-2024 BP/23-24/124 10/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.64 0.00 0 0
7 JALPAIGURI Northern Mechanical Rejuvenation of Khalaigram Piped Water Supply Scheme , SM/09486 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components for KHALAIGRAM (REJU) PWSS, at TW no. III, in the district of Jalpaiguri under Northern Mechanical Division, PHE Dte. Driller-in-Charge Junior Engineer ORD/000580/2022-2023 1123/NMD 12/09/2022 30 S.P. ENTERPRISE (KOLKATA) 8.13 3.81 46.86 100
8 JALPAIGURI Northern Mechanical Rejuvenation of Khalaigram Piped Water Supply Scheme , SM/09486 Augmentation Supply, delivery and installation of Servo Motor operated Copper wound line voltage corrector under KHALAIGRAM (Reju) WS Scheme at TW No. III in the dist. of Jalpaiguri under Northern Mechanical Division, P.H. Engineering Dte. Assistant Engineer , Head Quarters , NMD Junior Engineer ORD/000667/2022-2023 1400/NMD 09/12/2022 30 S.D. CONCERN 2.91 2.76 94.85 100
Total 36.31 22.35 61.57