Sl. No. | Division
Working Divisions
|
System Order No
System generated Order No. for the Work Order as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Order Value
Value of Work as mentioned in the Work Order
|
---|---|---|---|---|---|---|---|
8 | 212.23 | ||||||
1 | Eastern Mechanical Division | ORD/000461/2022-2023 | 19/11/2022 | 6265/EMD | CONCORD ENGINEERING | Providing And Installation of Electro-Mechanical Equipments and Allied Works for Arsenic Removal Plant at Mrigi Piped Water SupplyScheme, Block: Tehatta-I, Dist. Nadia Under EMD, PHE Dte. NIET No. 21 of EE/EMD of 2022-23 (Sl. No.- 20) | 41.28 |
2 | Eastern Mechanical Division | ORD/000895/2022-2023 | 20/01/2023 | 405/EMD | S.G. ENTERPRISE | Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer, Automatic Chlorinator etc Augmentation to Accomodate FHTC under BADKULLA (ZONE-I) W/S Scheme, Block- Hanskhali , Dist. - Nad | 30.45 |
3 | Eastern Mechanical Division | ORD/001925/2022-2023 | 22/03/2023 | 1197/EMD | P.K. ENGINEERING | Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer, Automatic Chlorinator etc Augmentation to Accomodate FHTC under KARIMPUR JALANGI(Z-6) W/S Scheme, Block- Karimpur I, & KAMALPU | 48.95 |
4 | Eastern Mechanical Division | ORD/001921/2022-2023 | 21/03/2023 | 1177/EMD | PS AND ASSOCIATES | Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer, Automatic Chlorinator etc Augmentation to Accommodate FHTC under GEDE W/S Scheme, Block- Krishnaganj , Dist. - Nadia. NIET | 13.60 |
5 | Eastern Mechanical Division | ORD/002287/2022-2023 | 14/08/2022 | 6148 /EMD | DIPALI CONSTRUCTION | Supply, delivery & installation of Submersible Pumping Machinery alongwith allied electro- mechanical works and chlorinator(in connection with Aug. work related to FHTC) at Pump House No.II(Z-I) under Sindrani W/S Scheme District of 24 Pgs. (N) (Block- Ba | 15.00 |
6 | Eastern Mechanical Division | ORD/001903/2023-2024 | 29/11/2023 | 6771/EMD | H.K. DAS & CO. | Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.II (Replacement) under Raghunathpur W/ | 13.00 |
7 | Eastern Mechanical Division | ORD/002689/2023-2024 | 23/02/2024 | 462/EMD | GANAPATI ENTERPRISE | Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No. II under Mahishgadi W/S Scheme, Blo | 11.03 |
8 | Eastern Mechanical Division | ORD/000766/2024-2025 | 17/12/2024 | 2893/EMD | WEST BENGAL ENGINEERING CO. | Installation of 33KV terminal arrangement with 36KV indoor type equipment (non-extensible type) with VCB, CT, PT etc. at Sub-Station of INTAKE under surface based for Arsenic Affected Blocks of Baduria, Basirhat- I & II, Swarupnagar and Deganga In the Dis | 38.92 |
Total | 212.23 |