1 |
Siliguri W/S Division |
ORD/000127/2021-2022 |
08/03/2022 |
2366/SWSD |
M/S DEBRAJ ENTERPRISE |
Supplying, fabrication, erection on suitable RCC foundation and commissioning with 3 (three) months trial run of pressure type Iron Removal Plant with blower cum compressor room of internal size (3.6 M X 3.00 M) and platform of size (9.00 m X 4.50 m) for |
13.19 |
2 |
Siliguri W/S Division |
ORD/000006/2022-2023 |
18/04/2022 |
146/SWSD |
PROSANTA KUMAR DAS |
Construction of 200 cu.m. capacity R.C.C. Elevated Reservoir, 20 Mtrs. Staging Height at the head works site including Rising Mains and Distribution System (Part-A) allied with Providing Functional Household Tap Connection (FHTC) under Jal Swapno and Jal |
130.22 |
3 |
Siliguri W/S Division |
ORD/000112/2021-2022 |
13/08/2021 |
832/SWSD |
SUBHANKAR GHOSH |
Preparation of Details Project Report (D.P.R.) in connection with the augmentation of Salbari W/S Scheme at Matigara block of Siliguri Sub Division under Siliguri W/S Division, PHE Dte. in connection with Jal Jeevan Mission and Jal Swapno Programme. SL. |
1.61 |
4 |
Siliguri W/S Division |
ORD/000191/2024-2025 |
11/12/2024 |
3360/SWSD |
BHARATI CHEMICAL & SCIENTIFIC WORKS |
Continuation order for Supply of Chemical, Consumables for Darjeeling District Laboratories under Siliguri Water Supply Division, PHE Dte.
|
2.32 |