Sl. No. | Division
Working Divisions
|
System Order No
System generated Order No. for the Work Order as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Order Value
Value of Work as mentioned in the Work Order
|
---|---|---|---|---|---|---|---|
40 | 755.22 | ||||||
1 | Jalpaiguri Division | ORD/000487/2021-2022 | 30/11/2021 | 839/RWS | ANUP SARKAR | Restoration work in connection with shifting of pipe line due to widening & work of NHAI from Fulbari more to Jhumur Bridge for Ambari Falakata W/S/S under Jalpaiguri Division , P.H.E. Dte | 3.04 |
2 | Jalpaiguri Division | ORD/000472/2021-2022 | 30/11/2021 | 840/RWS | M/S RATAN KUMAR DAS GUPTA AND CO | Providing Drainage system for waste water of iron Elemination plant for Mandal ghat W/S/S under Jalpaiguri Division , P.H.E. Dte | 1.72 |
3 | Jalpaiguri Division | ORD/000572/2021-2022 | 04/03/2022 | 183/RWS | BISWAJIT BHADURI | Maintenance O.H.R for rejuvenation of Garalbari Zone ¿ II W/S/S under Jalpaiguri Division P.H.E. Dte. | 3.15 |
4 | Jalpaiguri Division | ORD/001076/2021-2022 | 31/12/2021 | 909/RWS | M/S SURAJIT DEY AND CO. | Continuation order for Maintenance of pipe line & other Mise work related to pipe Mtc. of I.E plant for Kilkot T.G PWSS under Jalpaiguri Division P.H.E.Dte.(Period from - 01.01.2022 to 28.02.2022) | 0.70 |
5 | Jalpaiguri Division | ORD/000401/2022-2023 | 09/03/2023 | 604/JD | M/S DEY & ROY CHOUDHURY | Providing R.B.T (Reinforced Barbed Tape) in the Boundary Wall ,construction of chamber & changing of valves of I.E.P at Charerbari Water Supply Scheme under Jalpaiguri Division, PHE Dte. | 3.92 |
6 | Jalpaiguri Division | ORD/000042/2022-2023 | 01/04/2022 | 01/RWS | SUKES BASU MAJUMDAR | Extension order for the work of supply of different chemicals Lime for I.E.P. at Head work site under Maynaguri Water Supply Scheme under Jalpaiguri Division PHE Dte. | 0.73 |
7 | Jalpaiguri Division | ORD/000453/2024-2025 | 10/12/2024 | 1002 | RABINDRA NATH DUTTA | Balance Laying Distribution System and Providing Functional House Hold Tap Connection at Gaurgram PWSS in Maynaguri Block under Jalpaiguri Division, P.H.E.Dte. | 34.39 |
8 | Jalpaiguri Division | ORD/000456/2024-2025 | 10/12/2024 | 0905 | SAPTASWA SARKAR | Balance works Distribtion System and Functional Household Tap Connection (FHTC) including Different Components of Kantadighi Kumar Para TG PWSS i.e. TW, Pump House, Boundary Wall, Rising Main etc. in connection with Jal Jeevan Mission at Block-Mal under J | 82.16 |
9 | Jalpaiguri Division | ORD/000486/2024-2025 | 28/08/2024 | 1215/JD | GURUKUL INFOTECH | Continuation order for the work of "Providing support service for survey work using Total Station & Auto level instruments and other moderate instruments, machinery along with Surveyor and Surveyor Assistant, Tools and Plants & machinery all complete | 3.16 |
10 | Jalpaiguri Division | ORD/000495/2024-2025 | 25/11/2024 | 2057/JD | BREATHING SPACE DESIGN & VAASTU CONSULTANTS | Construction of Boundary Wall, Sluice Valve, Pathway, Drain etc. at 3rd Tube Well Site of Gairkata Piped Water Supply Scheme in connection with Jal Jeevan Mission under Jalpaiguri Division, P.H.E. Dte. | 8.51 |
11 | Jalpaiguri Division | ORD/000498/2024-2025 | 19/12/2024 | 2390/JD | BISHAL DAS | Rejuvenation of 2nd Tube Well Site, 3rd Tube Well Site and Head Work Site Pump House at Gairkata Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. | 2.48 |
12 | Jalpaiguri Division | ORD/000158/2024-2025 | 25/09/2024 | 264/JSSD | PRITAM DUTTA | Balance work i.c.w Laying Rising Main from 1st, 2nd & 3rd Tubewell site to OHR for Augmentation of Oodlabari (Zone-II) PWSS in connection with Jal Jeevan Mission at Block -Mal under Jalpaiguri Division, P.H.E.Dte. | 2.47 |
13 | Jalpaiguri Division | ORD/000500/2024-2025 | 19/12/2024 | 2394/JD | SAHA CONSTRUCTION | Construction of Rig Approach Road of Head Works Site & Second Site for Bhatiapara Piped Water Supply Scheme in Dhupguri Block under Jalpaiguri Division, P.H.E. Dte. | 1.55 |
14 | Jalpaiguri Division | ORD/000480/2024-2025 | 03/10/2024 | 1016 | ALICK DUTTA | Balance Laying Distribution System and Providing Functional House Hold Tap Connection at Kaoagap PWSS in Maynaguri Block under Jalpaiguri Division, P.H.E.Dte. | 34.87 |
15 | Jalpaiguri Division | ORD/000487/2024-2025 | 18/12/2024 | 1101 | M/S ROY & SARKAR CONSTRUCTION | Balance work of Laying pipeline & providing FHTC with allied works at Haritalguri Piped Water Supply Scheme in connection with JJM within Banarhat Block under Jalpaiguri Division, PHE Dte | 32.68 |
16 | Jalpaiguri Division | ORD/000445/2024-2025 | 09/12/2024 | 1403 | EFFLUENT AND WATERTREATMENT ENGINEERS PVT. LTD | Sinking of 2 (Two) Nos Big Dia Tube Well (250mm x 200mm x 120 mtr. Depth) by Modified R.C. Drilling Rig at Haldibari Tea Garden (D) of Augmentation of Binnaguri Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. | 38.97 |
17 | Jalpaiguri Division | ORD/000505/2024-2025 | 19/12/2024 | 2398/JD | SANJIT SAHA | Providing FHTC Including Restoration of Existing FHTC in the Command Area of Bhandani PWSS in connection with Jal Jeevan Mission at Block - Dhupguri under Jalpaiguri Division, P.H.E. Dte. | 6.96 |
18 | Jalpaiguri Division | ORD/000155/2024-2025 | 25/09/2024 | 261/JSSD | KANAI LAL SEN | Balance work in connection with laying distribution system incl. Providing FHTC for i.c.w.Jal Jeevan Mission for Indong Tea Garden Area Area Piped W/S Scheme under Jalpaiguri Division, P.H.¿. Dte. | 5.88 |
19 | Jalpaiguri Division | ORD/000461/2024-2025 | 11/12/2024 | 5501 | M/S. S.D. ENTERPRISE | Construction of Boundary Wall with Pump House (3.6mx2.4m) and Sinking of tube well by reverse rotary method of Drilling for 4th TW including Delivery main for Augmentation of Purba Batabari PWSS under Jal Jeevan Mission under Jalpaiguri Division, P.H.E.Dt | 19.96 |
20 | Jalpaiguri Division | ORD/000233/2024-2025 | 25/10/2024 | 5716 | SAPTASWA SARKAR | Construction of different components of Chamurchi Zone 2 PWSS Rising Main, FHTC etc. in connection with Jal Jeevan Mission at Block - Banarhat under Jalpaiguri Division, P.H.E. Dte. | 68.98 |
21 | Jalpaiguri Division | ORD/000485/2024-2025 | 28/06/2024 | 525/JD | GURUKUL INFOTECH | Continuation order for the work of "Providing support service for survey work using Total Station & Auto level instruments and other moderate instruments, machinery along with Surveyor and Surveyor Assistant, Tools and Plants & machinery all complete | 3.16 |
22 | Jalpaiguri Division | ORD/000477/2024-2025 | 16/12/2024 | 1108 | A P CONSTRUCTION | Balance Laying Distribution System with Providing Functional House Hold Tap Connection in connection with JJM at Purba Salbari Piped Water Supply Scheme under Jalpaiguri Division, P.H.E.Dte. (Phase-II) | 36.26 |
23 | Jalpaiguri Division | ORD/000450/2024-2025 | 10/12/2024 | 0801 | ARATI CONSTRUCTION | Balance Laying Distribution System including Providing FHTC and other allied work releted to pipe line at Bhangerhat PWSS in connection with Jal Jeevan Mission at Block Dhupguri under Jalpaiguri Division, P.H.E.Dte. | 34.03 |
24 | Jalpaiguri Division | ORD/000459/2024-2025 | 10/12/2024 | 1115 | SRINIWAS AGARWAL | Balance work of distribution system and Functional House Hold Tap Connection (FHTC) including Construction of Boundary wall, drain, footpath at 2 nd site of Charchara Bari PWSS at Banarhat Block under Jalapiguri Division PHE. Dte. | 70.88 |
25 | Jalpaiguri Division | ORD/000478/2024-2025 | 16/12/2024 | 1202 | M/S SIBU DEY AND CO. | Protective Boulder Work, Land Development and approach road inside the premises at H/W Site for Gajaldoba Tea Garden PWSS in connection with Jal Jeevan Mission at Block-Mal under Jalpaiguri Division, P.H.E. Dte. | 23.80 |
26 | Jalpaiguri Division | ORD/000503/2024-2025 | 19/12/2024 | 2397/JD | SAPTASWA SARKAR | Construction of Boundary Wall, Footpath, Drain & Laying Pipe Line for Rising Main at 3rd TW Site of Riabari Tea Garden PWSS in connection with Jal Jeevan Mission at Banarhat Block under Jalpaiguri Division, P.H.E. Dte. | 8.66 |
27 | Jalpaiguri Division | ORD/000152/2024-2025 | 25/09/2024 | 268/JSSD | SAHA CONSTRUCTION | Balance work, Construction of approaches to Pump house area and Land development inside PH area under Rejuvenation of Syli TG PWSS in connection with Jal Jeevan Mission under Jalpaiguri Division, P.H.E.Dte. | 6.49 |
28 | Jalpaiguri Division | ORD/000481/2024-2025 | 17/12/2024 | 1208 | PARESH CHANDRA ROY | Restoration of pipeline including replacement of valves damaged by PMGSY with IEP Washout, etc. at HW site of Mainatali PWSS in Dhupguri Development Block under Jalpaiguri Division, P.H.E. Dte. | 27.19 |
29 | Jalpaiguri Division | ORD/000153/2024-2025 | 23/09/2024 | 244/JSSD | ARUP SARKAR | Installation of a Rig Bored Big Dia Deep Tubewell by ODEX-165 method of drilling along with pump connection and other allied works at Uttar Salbari Mouza (5th T/W site) of Augmentation of Angrabhasa Piped Water Supply Scheme, Nagrakata Block under Jalpa | 9.97 |
30 | Jalpaiguri Division | ORD/000443/2024-2025 | 06/12/2024 | 1401 | EFFLUENT AND WATERTREATMENT ENGINEERS PVT. LTD | Sinking of 2 (Two) Nos Big Dia Tube Well (250mm x 200mm x 120 mtr. Depth) by Modified R.C. Drilling Rig at Telipara Tea Garden (D) of Augmentation of Binnaguri Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. | 38.97 |
31 | Jalpaiguri Division | ORD/000444/2024-2025 | 09/12/2024 | 1402 | EFFLUENT AND WATERTREATMENT ENGINEERS PVT. LTD | Sinking of 1 (One) Nos Big Dia Tube Well (250mm x 200mm x 120 mtr. Depth) by Modified R.C. Drilling Rig at Maraghat Tea Garden (D) of Augmentation of Binnaguri Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. | 19.49 |
32 | Jalpaiguri Division | ORD/000507/2024-2025 | 20/12/2024 | 2403/JD | SAPTASWA SARKAR | Relaying of Rising Main from Head Works Site to Pump House No.-II due to the Damage of HDPE Pipeline at Riabari T.G PWSS under Jalpaiguri Division, P.H.E. | 1.32 |
33 | Jalpaiguri Division | ORD/000502/2024-2025 | 19/12/2024 | 2396/JD | M/S SARKAR BROTHERS CONSTRUCTION | Laying of Pipe Line & Repairing of FHTC at Red Bank Tea Garden Piped Water Supply Scheme in Banarhat Block under Jalpaiguri Division, P.H.E. Dte. | 3.87 |
34 | Jalpaiguri Division | ORD/000506/2024-2025 | 20/12/2024 | 2402/JD | PRADIP SAHA | Shifting of Pipe Line & Providing FHTC Including Retrofitting Works Near Rambilas More of Grassmore T.G. PWSS at Nagrakata Block under Jalpaiguri Division, P.H.E. Dte. | 2.13 |
35 | Jalpaiguri Division | ORD/000488/2024-2025 | 18/12/2024 | 1112 | ABHIK BHOWMIK | Construction of Boundary Wall, Sluice Valve, Pathway, Drain etc. at 3rd TW Site for Kathapara PWSS i.c.w. JJM under Jalpaiguri Division, PHE Dte. | 11.54 |
36 | Jalpaiguri Division | ORD/000460/2024-2025 | 11/12/2024 | 1111 | DINABANDHU ROY | Laying Water Distribution Network in Gajoldoba Tea Garden PWSS in connection with Jal Jeevan Mission at Block - Mal under Jalpaiguri Division, PHE Dte. (Part- A) | 10.47 |
37 | Jalpaiguri Division | ORD/000115/2024-2025 | 10/09/2024 | 331/JSSD | SWAPAN SAHA | Providing Sluice Valves at Purba Batabari Piped Water Supply Scheme under Jalpaiguri Division, P.H.E.Dte. | 0.55 |
38 | Jalpaiguri Division | ORD/000143/2024-2025 | 24/09/2024 | 255/JSSD | ARUP SARKAR | Laying distribution system and providing FHTC with other allied works under Jal Jeevan Mission for the adjacent area of Dharanipur Cha Sundari piped W/S scheme at Nagrakata Block under Jalpaiguri Sadar Sub Division P.H.E. Dte. (Phase-II) | 8.59 |
39 | Jalpaiguri Division | ORD/000483/2024-2025 | 17/12/2024 | 0804 | VIBEKANANDA DEY | Construction Boundary wall, footpath, drain and laying balance portion of distribution system including providing FHTC and other allied works related to pipe line at Bhangamali PWSS in connection with Jal Jeevan Mission at Block Maynaguri under Jalpaiguri | 28.04 |
40 | Jalpaiguri Division | ORD/000484/2024-2025 | 17/12/2024 | 0813 | MD HAKIMUDDIN | Sinking of 3 (Three) Nos Tube Well by ODEX-165 method of drilling and construction of Pump House (3.60m x 2.40m) size with sanitary plumbing arrangement and boundary wall for direct boosting in the command area of New Clenco TG PWSS in connection with Jal | 53.54 |
Total | 755.22 |