No. of unauthorized work order
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
40 755.22
1 Jalpaiguri Division ORD/000487/2021-2022 30/11/2021 839/RWS ANUP SARKAR Restoration work in connection with shifting of pipe line due to widening & work of NHAI from Fulbari more to Jhumur Bridge for Ambari Falakata W/S/S under Jalpaiguri Division , P.H.E. Dte 3.04
2 Jalpaiguri Division ORD/000472/2021-2022 30/11/2021 840/RWS M/S RATAN KUMAR DAS GUPTA AND CO Providing Drainage system for waste water of iron Elemination plant for Mandal ghat W/S/S under Jalpaiguri Division , P.H.E. Dte 1.72
3 Jalpaiguri Division ORD/000572/2021-2022 04/03/2022 183/RWS BISWAJIT BHADURI Maintenance O.H.R for rejuvenation of Garalbari Zone ¿ II W/S/S under Jalpaiguri Division P.H.E. Dte. 3.15
4 Jalpaiguri Division ORD/001076/2021-2022 31/12/2021 909/RWS M/S SURAJIT DEY AND CO. Continuation order for Maintenance of pipe line & other Mise work related to pipe Mtc. of I.E plant for Kilkot T.G PWSS under Jalpaiguri Division P.H.E.Dte.(Period from - 01.01.2022 to 28.02.2022) 0.70
5 Jalpaiguri Division ORD/000401/2022-2023 09/03/2023 604/JD M/S DEY & ROY CHOUDHURY Providing R.B.T (Reinforced Barbed Tape) in the Boundary Wall ,construction of chamber & changing of valves of I.E.P at Charerbari Water Supply Scheme under Jalpaiguri Division, PHE Dte. 3.92
6 Jalpaiguri Division ORD/000042/2022-2023 01/04/2022 01/RWS SUKES BASU MAJUMDAR Extension order for the work of supply of different chemicals Lime for I.E.P. at Head work site under Maynaguri Water Supply Scheme under Jalpaiguri Division PHE Dte. 0.73
7 Jalpaiguri Division ORD/000453/2024-2025 10/12/2024 1002 RABINDRA NATH DUTTA Balance Laying Distribution System and Providing Functional House Hold Tap Connection at Gaurgram PWSS in Maynaguri Block under Jalpaiguri Division, P.H.E.Dte. 34.39
8 Jalpaiguri Division ORD/000456/2024-2025 10/12/2024 0905 SAPTASWA SARKAR Balance works Distribtion System and Functional Household Tap Connection (FHTC) including Different Components of Kantadighi Kumar Para TG PWSS i.e. TW, Pump House, Boundary Wall, Rising Main etc. in connection with Jal Jeevan Mission at Block-Mal under J 82.16
9 Jalpaiguri Division ORD/000486/2024-2025 28/08/2024 1215/JD GURUKUL INFOTECH Continuation order for the work of "Providing support service for survey work using Total Station & Auto level instruments and other moderate instruments, machinery along with Surveyor and Surveyor Assistant, Tools and Plants & machinery all complete 3.16
10 Jalpaiguri Division ORD/000495/2024-2025 25/11/2024 2057/JD BREATHING SPACE DESIGN & VAASTU CONSULTANTS Construction of Boundary Wall, Sluice Valve, Pathway, Drain etc. at 3rd Tube Well Site of Gairkata Piped Water Supply Scheme in connection with Jal Jeevan Mission under Jalpaiguri Division, P.H.E. Dte. 8.51
11 Jalpaiguri Division ORD/000498/2024-2025 19/12/2024 2390/JD BISHAL DAS Rejuvenation of 2nd Tube Well Site, 3rd Tube Well Site and Head Work Site Pump House at Gairkata Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. 2.48
12 Jalpaiguri Division ORD/000158/2024-2025 25/09/2024 264/JSSD PRITAM DUTTA Balance work i.c.w Laying Rising Main from 1st, 2nd & 3rd Tubewell site to OHR for Augmentation of Oodlabari (Zone-II) PWSS in connection with Jal Jeevan Mission at Block -Mal under Jalpaiguri Division, P.H.E.Dte. 2.47
13 Jalpaiguri Division ORD/000500/2024-2025 19/12/2024 2394/JD SAHA CONSTRUCTION Construction of Rig Approach Road of Head Works Site & Second Site for Bhatiapara Piped Water Supply Scheme in Dhupguri Block under Jalpaiguri Division, P.H.E. Dte. 1.55
14 Jalpaiguri Division ORD/000480/2024-2025 03/10/2024 1016 ALICK DUTTA Balance Laying Distribution System and Providing Functional House Hold Tap Connection at Kaoagap PWSS in Maynaguri Block under Jalpaiguri Division, P.H.E.Dte. 34.87
15 Jalpaiguri Division ORD/000487/2024-2025 18/12/2024 1101 M/S ROY & SARKAR CONSTRUCTION Balance work of Laying pipeline & providing FHTC with allied works at Haritalguri Piped Water Supply Scheme in connection with JJM within Banarhat Block under Jalpaiguri Division, PHE Dte 32.68
16 Jalpaiguri Division ORD/000445/2024-2025 09/12/2024 1403 EFFLUENT AND WATERTREATMENT ENGINEERS PVT. LTD Sinking of 2 (Two) Nos Big Dia Tube Well (250mm x 200mm x 120 mtr. Depth) by Modified R.C. Drilling Rig at Haldibari Tea Garden (D) of Augmentation of Binnaguri Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. 38.97
17 Jalpaiguri Division ORD/000505/2024-2025 19/12/2024 2398/JD SANJIT SAHA Providing FHTC Including Restoration of Existing FHTC in the Command Area of Bhandani PWSS in connection with Jal Jeevan Mission at Block - Dhupguri under Jalpaiguri Division, P.H.E. Dte. 6.96
18 Jalpaiguri Division ORD/000155/2024-2025 25/09/2024 261/JSSD KANAI LAL SEN Balance work in connection with laying distribution system incl. Providing FHTC for i.c.w.Jal Jeevan Mission for Indong Tea Garden Area Area Piped W/S Scheme under Jalpaiguri Division, P.H.¿. Dte. 5.88
19 Jalpaiguri Division ORD/000461/2024-2025 11/12/2024 5501 M/S. S.D. ENTERPRISE Construction of Boundary Wall with Pump House (3.6mx2.4m) and Sinking of tube well by reverse rotary method of Drilling for 4th TW including Delivery main for Augmentation of Purba Batabari PWSS under Jal Jeevan Mission under Jalpaiguri Division, P.H.E.Dt 19.96
20 Jalpaiguri Division ORD/000233/2024-2025 25/10/2024 5716 SAPTASWA SARKAR Construction of different components of Chamurchi Zone 2 PWSS Rising Main, FHTC etc. in connection with Jal Jeevan Mission at Block - Banarhat under Jalpaiguri Division, P.H.E. Dte. 68.98
21 Jalpaiguri Division ORD/000485/2024-2025 28/06/2024 525/JD GURUKUL INFOTECH Continuation order for the work of "Providing support service for survey work using Total Station & Auto level instruments and other moderate instruments, machinery along with Surveyor and Surveyor Assistant, Tools and Plants & machinery all complete 3.16
22 Jalpaiguri Division ORD/000477/2024-2025 16/12/2024 1108 A P CONSTRUCTION Balance Laying Distribution System with Providing Functional House Hold Tap Connection in connection with JJM at Purba Salbari Piped Water Supply Scheme under Jalpaiguri Division, P.H.E.Dte. (Phase-II) 36.26
23 Jalpaiguri Division ORD/000450/2024-2025 10/12/2024 0801 ARATI CONSTRUCTION Balance Laying Distribution System including Providing FHTC and other allied work releted to pipe line at Bhangerhat PWSS in connection with Jal Jeevan Mission at Block Dhupguri under Jalpaiguri Division, P.H.E.Dte. 34.03
24 Jalpaiguri Division ORD/000459/2024-2025 10/12/2024 1115 SRINIWAS AGARWAL Balance work of distribution system and Functional House Hold Tap Connection (FHTC) including Construction of Boundary wall, drain, footpath at 2 nd site of Charchara Bari PWSS at Banarhat Block under Jalapiguri Division PHE. Dte. 70.88
25 Jalpaiguri Division ORD/000478/2024-2025 16/12/2024 1202 M/S SIBU DEY AND CO. Protective Boulder Work, Land Development and approach road inside the premises at H/W Site for Gajaldoba Tea Garden PWSS in connection with Jal Jeevan Mission at Block-Mal under Jalpaiguri Division, P.H.E. Dte. 23.80
26 Jalpaiguri Division ORD/000503/2024-2025 19/12/2024 2397/JD SAPTASWA SARKAR Construction of Boundary Wall, Footpath, Drain & Laying Pipe Line for Rising Main at 3rd TW Site of Riabari Tea Garden PWSS in connection with Jal Jeevan Mission at Banarhat Block under Jalpaiguri Division, P.H.E. Dte. 8.66
27 Jalpaiguri Division ORD/000152/2024-2025 25/09/2024 268/JSSD SAHA CONSTRUCTION Balance work, Construction of approaches to Pump house area and Land development inside PH area under Rejuvenation of Syli TG PWSS in connection with Jal Jeevan Mission under Jalpaiguri Division, P.H.E.Dte. 6.49
28 Jalpaiguri Division ORD/000481/2024-2025 17/12/2024 1208 PARESH CHANDRA ROY Restoration of pipeline including replacement of valves damaged by PMGSY with IEP Washout, etc. at HW site of Mainatali PWSS in Dhupguri Development Block under Jalpaiguri Division, P.H.E. Dte. 27.19
29 Jalpaiguri Division ORD/000153/2024-2025 23/09/2024 244/JSSD ARUP SARKAR Installation of a Rig Bored Big Dia Deep Tubewell by ODEX-165 method of drilling along with pump connection and other allied works at Uttar Salbari Mouza (5th T/W site) of Augmentation of Angrabhasa Piped Water Supply Scheme, Nagrakata Block under Jalpa 9.97
30 Jalpaiguri Division ORD/000443/2024-2025 06/12/2024 1401 EFFLUENT AND WATERTREATMENT ENGINEERS PVT. LTD Sinking of 2 (Two) Nos Big Dia Tube Well (250mm x 200mm x 120 mtr. Depth) by Modified R.C. Drilling Rig at Telipara Tea Garden (D) of Augmentation of Binnaguri Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. 38.97
31 Jalpaiguri Division ORD/000444/2024-2025 09/12/2024 1402 EFFLUENT AND WATERTREATMENT ENGINEERS PVT. LTD Sinking of 1 (One) Nos Big Dia Tube Well (250mm x 200mm x 120 mtr. Depth) by Modified R.C. Drilling Rig at Maraghat Tea Garden (D) of Augmentation of Binnaguri Piped Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte. 19.49
32 Jalpaiguri Division ORD/000507/2024-2025 20/12/2024 2403/JD SAPTASWA SARKAR Relaying of Rising Main from Head Works Site to Pump House No.-II due to the Damage of HDPE Pipeline at Riabari T.G PWSS under Jalpaiguri Division, P.H.E. 1.32
33 Jalpaiguri Division ORD/000502/2024-2025 19/12/2024 2396/JD M/S SARKAR BROTHERS CONSTRUCTION Laying of Pipe Line & Repairing of FHTC at Red Bank Tea Garden Piped Water Supply Scheme in Banarhat Block under Jalpaiguri Division, P.H.E. Dte. 3.87
34 Jalpaiguri Division ORD/000506/2024-2025 20/12/2024 2402/JD PRADIP SAHA Shifting of Pipe Line & Providing FHTC Including Retrofitting Works Near Rambilas More of Grassmore T.G. PWSS at Nagrakata Block under Jalpaiguri Division, P.H.E. Dte. 2.13
35 Jalpaiguri Division ORD/000488/2024-2025 18/12/2024 1112 ABHIK BHOWMIK Construction of Boundary Wall, Sluice Valve, Pathway, Drain etc. at 3rd TW Site for Kathapara PWSS i.c.w. JJM under Jalpaiguri Division, PHE Dte. 11.54
36 Jalpaiguri Division ORD/000460/2024-2025 11/12/2024 1111 DINABANDHU ROY Laying Water Distribution Network in Gajoldoba Tea Garden PWSS in connection with Jal Jeevan Mission at Block - Mal under Jalpaiguri Division, PHE Dte. (Part- A) 10.47
37 Jalpaiguri Division ORD/000115/2024-2025 10/09/2024 331/JSSD SWAPAN SAHA Providing Sluice Valves at Purba Batabari Piped Water Supply Scheme under Jalpaiguri Division, P.H.E.Dte. 0.55
38 Jalpaiguri Division ORD/000143/2024-2025 24/09/2024 255/JSSD ARUP SARKAR Laying distribution system and providing FHTC with other allied works under Jal Jeevan Mission for the adjacent area of Dharanipur Cha Sundari piped W/S scheme at Nagrakata Block under Jalpaiguri Sadar Sub Division P.H.E. Dte. (Phase-II) 8.59
39 Jalpaiguri Division ORD/000483/2024-2025 17/12/2024 0804 VIBEKANANDA DEY Construction Boundary wall, footpath, drain and laying balance portion of distribution system including providing FHTC and other allied works related to pipe line at Bhangamali PWSS in connection with Jal Jeevan Mission at Block Maynaguri under Jalpaiguri 28.04
40 Jalpaiguri Division ORD/000484/2024-2025 17/12/2024 0813 MD HAKIMUDDIN Sinking of 3 (Three) Nos Tube Well by ODEX-165 method of drilling and construction of Pump House (3.60m x 2.40m) size with sanitary plumbing arrangement and boundary wall for direct boosting in the command area of New Clenco TG PWSS in connection with Jal 53.54