No. of unauthorized work order
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Showing 1 to 14 of 14 entries
Sl. No.Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
14 878.98
Sl. No.
Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
14
878.98
Total
878.98
1 Jalpaiguri Division ORD/000487/2021-2022 30/11/2021 839/RWS ANUP SARKAR Restoration work in connection with shifting of pipe line due to widening & work of NHAI from Fulbari more to Jhumur Bridge for Ambari Falakata W/S/S under Jalpaiguri Division , P.H.E. Dte 3.04
2 Jalpaiguri Division ORD/000472/2021-2022 30/11/2021 840/RWS M/S RATAN KUMAR DAS GUPTA AND CO Providing Drainage system for waste water of iron Elemination plant for Mandal ghat W/S/S under Jalpaiguri Division , P.H.E. Dte 1.72
3 Jalpaiguri Division ORD/000572/2021-2022 04/03/2022 183/RWS BISWAJIT BHADURI Maintenance O.H.R for rejuvenation of Garalbari Zone ¿ II W/S/S under Jalpaiguri Division P.H.E. Dte. 3.15
4 Jalpaiguri Division ORD/001076/2021-2022 31/12/2021 909/RWS M/S SURAJIT DEY AND CO. Continuation order for Maintenance of pipe line & other Mise work related to pipe Mtc. of I.E plant for Kilkot T.G PWSS under Jalpaiguri Division P.H.E.Dte.(Period from - 01.01.2022 to 28.02.2022) 0.70
5 Jalpaiguri Division ORD/000401/2022-2023 09/03/2023 604/JD M/S DEY & ROY CHOUDHURY Providing R.B.T (Reinforced Barbed Tape) in the Boundary Wall ,construction of chamber & changing of valves of I.E.P at Charerbari Water Supply Scheme under Jalpaiguri Division, PHE Dte. 3.92
6 Jalpaiguri Division ORD/000042/2022-2023 01/04/2022 01/RWS SUKES BASU MAJUMDAR Extension order for the work of supply of different chemicals Lime for I.E.P. at Head work site under Maynaguri Water Supply Scheme under Jalpaiguri Division PHE Dte. 0.73
7 Jalpaiguri Division ORD/000152/2024-2025 25/09/2024 268/JSSD SAHA CONSTRUCTION Balance work, Construction of approaches to Pump house area and Land development inside PH area under Rejuvenation of Syli TG PWSS in connection with Jal Jeevan Mission under Jalpaiguri Division, P.H.E.Dte. 6.49
8 Jalpaiguri Division ORD/000029/2025-2026 29/05/2025 3001 EFFLUENT AND WATERTREATMENT ENGINEERS PVT. LTD Sinking of One No Big Dia Tube Well by Modified DTH - ODEX method for 3rd tube well site at Rejuvenation of Gatia Tea Garden Piped Water Supply Scheme under Jalpaiguri Division, PHE Dte. 16.63
9 Jalpaiguri Division ORD/000713/2024-2025 30/01/2025 429/JSSD GURUKUL INFOTECH Continuation work of Providing support service for survey work using Total Station & Auto level instruments and other moderate instruments, machinery along with Surveyor and Surveyor Assistant, Tools and Plants & machinery all complete for providing PHE S 3.16
10 Jalpaiguri Division ORD/000025/2025-2026 19/05/2025 0702 B. B. CONSTRUCTION Construction of RCC Overhead Reservoir Capacity 750 CUM with 20 Mtr. Staging Height as per departmental design & drawing for Rejuvination of DABGRAM-II (NORTH) Piped Water Supply Scheme in connection with Jal Jeevan Mission at Block: Rajganj under Jalpa 190.27
11 Jalpaiguri Division ORD/000024/2025-2026 16/05/2025 0701 EFFLUENT AND WATERTREATMENT ENGINEERS PVT. LTD Construction of different Components of ANANDAPUR T.G. PWSS i.e. 2 Nos Tube well, 2 Nos Pump house, Iron Elimination plant, 2 Nos Boundary Wall, Blower Room, Water distribution Network, 350 Cum OHR, Rising Main, FHTC etc. in connection with Jal Jeevan Mis 481.86
12 Jalpaiguri Division ORD/000712/2024-2025 26/11/2024 345/JSSD GURUKUL INFOTECH Continuation work of "Providing support service for survey work using Total Station & Auto level instruments and other moderate instruments, machinery along with Surveyor and Surveyor Assistant, Tools and Plants & machinery all complete for providing PHE 3.16
13 Jalpaiguri Division ORD/000023/2025-2026 16/05/2025 0605 KAMAL GHOSH Construction of boundary wall with gate,drain,Land development and pathway and laying pipe line at Zone- I (H/W Site , 2 nd TW site) Zone_II,(H/W Site,2nd TW Site,3rd TW Site) and Zone-III (H/W Site,2nd TW site, 3rd TW site ) of PANIKAURI piped water 111.41
14 Jalpaiguri Division ORD/000021/2025-2026 13/05/2025 2601 M/S DEY & ROY CHOUDHURY Laying of different dia pipeline as replacement of old 63 mm and 75 mm dia (OD) pipeline to improve the water distribution network at Charerbari area under Chapgar Piped Water Supply Scheme in connection with Jal Jeevan Mission at Maynaguri Block under Ja 52.73
Total 878.98
Showing 1 to 14 of 14 entries