No. of unauthorized work order
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
13 635.54
1 Barasat Division ORD/001037/2024-2025 19/12/2024 Ikbal/Sangram A.C ENTERPRISE Acceptance cum work order for Construction of Boundary Wall at the Head Work site of Sangrampur Water Supply Scheme under Basirhat Sub-Division within Barasat Division, P.H.E. Dte. 18.27
2 Barasat Division ORD/001041/2024-2025 20/12/2024 Deb/Berachamp DEBAPRASAD MONDAL. Acceptance cum work order for Construction of Boundary wall at Berachampa Zone - V 1st Tubewell site at Kaukepara Mouza within Deganga Block under Barasat Sub-Division, PHE Dte. 27.57
3 Barasat Division ORD/001039/2024-2025 20/12/2024 Ikbal/Gobinda A.C ENTERPRISE Acceptance cum work order for Construction of Boundary Wall at the site of Pump House -III of Gobindapur Water Supply Scheme under Basirhat Sub-Division within Barasat Division, P.H.E. Dte. 14.35
4 Barasat Division ORD/001002/2024-2025 11/12/2024 Abulklam/Kachua ABUL KALAM GAZI Acceptance cum work order for Restoration of Kachua Mandir to BaguaDanga Masjid road at Kachua Swarupnagar water supply scheme of Basirhat II Block under Barasat Division P.H.E.Dte 9.55
5 Barasat Division ORD/001017/2024-2025 16/12/2024 A.P/Swetpur A.P POWER & CONCRETE Formal work order for Additional pipeline and other allied works as per revised LDS in connection with Augmentation of Swetpur-II Water Supply Scheme under JJM programme in Deganga block within Barasat Sub Division, P.H.E.Dte. 192.44
6 Barasat Division ORD/001001/2024-2025 11/12/2024 Gazi/Dhanyakuria ABDUL HAMID GAZI. Acceptance cum work order for Restoration of concrete roads in different location at Dhanyakuria water supply scheme in Basirhat II Block under Barasat Division P.H.E.Dte. 66.05
7 Barasat Division ORD/000991/2024-2025 09/12/2024 AMEnterr ALAMGIR ENTERPRISE. Acceptance cum work order for Protection works for protection of newly laid UPVC distribution pipe line at N/H/O Utpal Mondal at Jhikra Paschim para within Jhikra w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E.Dte. 9.06
8 Barasat Division ORD/000995/2024-2025 10/12/2024 Chitta ACHINTA KUMAR HALDER. Acceptance cum work order for Construction of Protection wall for protection of UPVC distribution pipe line at N/H/O Rabiul Gazi & Enamul Gazi in connection with Augmentation of Hingalganj w/s scheme (Z-II), Hingalganj block under Hasnabad Sub-Division P. 8.19
9 Barasat Division ORD/000469/2024-2025 10/09/2024 584/BSD MANGES INDUSTRIAL CORPORATION. Repair and Renovation Work of Pump House at 3rd Tubewell site and allied works at Nebadhui Duttapukur Zone-II Water Supply Scheme under Barasat Sub Division, P.H.E. Dte. 2.51
10 Barasat Division ORD/001033/2024-2025 17/12/2024 SS/Murarisha S.S.ENTERPRISE. (BAMANGACHI) Formal work order for Additional Laying of UPVC distribution pipe line, Providing FHTC for the leftout portion, protection works & other allied works in connection with Augmentation of Murarisha w/s scheme, Hasnabad Block under Hasnabad Sub-Division, P 169.89
11 Barasat Division ORD/000988/2024-2025 09/12/2024 GaziEnterpri SELIM GAZI. Acceptance cum work order for Protection works for protection of newly laid UPVC distribution pipe line at N/H/O Pankaj Mondal at Jhikra Majher para within Jhikra w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. 9.32
12 Barasat Division ORD/001018/2024-2025 16/12/2024 nebadhui/B.K M/S B.K.ENTERPRISE. Formal work order for Additional pipeline and other allied works as per revised LDS in connection with Augmentation of Nebhadui-II Water Supply Scheme under JJM programme in Barasat-I block within Barasat Sub Division, P.H.E.Dte. 100.40
13 Barasat Division ORD/001038/2024-2025 19/12/2024 Jeet/DBagundi A.C ENTERPRISE Acceptance cum work order for Construction of Boundary Wall at the site of Pump House 1 of Dakshin Bagundi Water Supply Scheme under Basirhat Sub-Division within Barasat Division, P.H.E. Dte. 7.93
Total 635.54