No. of unauthorized work order
Exception Report Showing the Status of Major Pending Works for the Divisions

Update Data
Rs. in Lakh
Sl. No. Division
Working Divisions
System Order No
System generated Order No. for the Work Order as per PHED-MIS
Order Date
Date of Issuance of the Work Order as per PHED-MIS
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Order Value
Value of Work as mentioned in the Work Order
12 485.64
1 Alipore Division ORD/000746/2024-2025 05/11/2024 4413/AD G.B. CONSTRUCTION (TW) Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Kanthalberia W/S Scheme, Block - Basanti under Canning Sub Division of Alipore Division, PHE Dte. (Tube well no. 19.68
2 Alipore Division ORD/001224/2024-2025 13/12/2024 5182/AD M/S KHAJABABA ENTERPRISE Construction of 400 m³ capacity R.C.C OHR (based on Departmental Design & Drawing) with 20 mtr. staging height including Geo- Technical investigation, foundation, pipeline connection and cost of pipes, specials etc. for augmentation of Bhaleya piped wate 133.61
3 Alipore Division ORD/000535/2024-2025 12/09/2024 3709/AD M/S KHAJABABA ENTERPRISE Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site for the Augmentation of Sabek Mahisahara & Adjoining Mouzas (Chunpuri) W/S Scheme, Block - Canning-II under C 6.97
4 Alipore Division ORD/000485/2024-2025 02/09/2024 3544/AD JYOTY SOLAR POWER Laying pipeline to connect the uncovered area at Purba Radhanagar (Zone-I) W/S Scheme, Block - Gosaba, under Canning Sub-Division of Alipore Division, P.H.E.Dte. 27.78
5 Alipore Division ORD/000511/2024-2025 24/06/2024 2720/AD BHUMI FOUNDATION Wall writing of IEC messages along with logo pictures etc. of multiple colour as will be supplied by the PHE Dte. on smooth wall surface at Falta and Diamond -I block under Alipore Division, PHE Dte. 3.24
6 Alipore Division ORD/000822/2024-2025 11/11/2024 4504/AD M/S PARAMESWAR CHOWDHURY Balance works under the Augmentation scheme of Zone-II at Falta block for providing balance pipe lying works, House Hold Tap connection, road restoration works etc.under Mega Surface Water Based Water Supply Scheme for Falta- Mathurapur, District South 24 80.38
7 Alipore Division ORD/001066/2024-2025 05/12/2024 5003/AD M/S KHAJABABA ENTERPRISE Construction of boundary wall and Land development for Tube Well no 3 Site for Ground Water Based of Bibir Abad Piped Water Supply Scheme, Block - Canning- II under Canning Sub-Division of Alipore Division, PHE Dte. 10.40
8 Alipore Division ORD/000545/2024-2025 12/09/2024 3716/AD I.S. ENTERPRISE Laying of additional pipe line and other allied works at Bipradaspur W/S Scheme, Block-Gosaba under Canning Sub-Division of Alipore Division, P.H.E. Dte. 76.62
9 Alipore Division ORD/000514/2024-2025 24/06/2024 2721/AD BHUMI FOUNDATION Wall writing of IEC messages along with logo pictures etc. of multiple colour as will be supplied by the PHE Dte. on smooth wall surface at Kulpi and Diamond Harbour -II block under Alipore Division, PHE Dte. 3.40
10 Alipore Division ORD/000658/2024-2025 23/10/2024 4204/AD R.S.CONSTRUCTION CO. Laying distribution system of piped water supply at Zone- X of Mathurapur - I Block in connection with Jal Jeevan Mission (JJM) for Mega Surface water based water supply scheme for Falta-Mathurapur, District South 24 Parganas under Raidighi Sub-Division 38.62
11 Alipore Division ORD/000457/2024-2025 21/08/2024 3415/AD M/S KHAJABABA ENTERPRISE Construction of boundary wall along with Land Development, Plinth Protection and Approach Road for Pump House at 4th Tubewell Site for Achintyanagar W/S scheme, Block : Pathar Pratima under JJM of Kakdwip Sub-Division under Alipore Division, P.H.E. Dte. ( 9.67
12 Alipore Division ORD/000442/2024-2025 25/07/2024 3077/AD MAA LAXMI ENTERPRISE Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections, pile and pile cap for OHR etc at Indraprastha PWSS, Block -Pathar Pratima for implementation of JJM under Kakdwip Sub-Division of Alipore Division, P.H. 75.28
Total 485.64