Sl. No. | Division
Working Divisions
|
Bill Number | Bill Date
Date of Issuance of the Work Order as per PHED-MIS
|
Vendor Name
Vendor Appointed Against this Work Order as per PHED-MIS
|
System Order Number
System generated Order No. for the Work Order as per PHED-MIS
|
Memo Number
Memo no. for Work Order Provided by the Divisions as per PHED-MIS
|
Order Date
Date of Issuance of the Work Order as per PHED-MIS
|
work_name
Name of the Work as per the Issued Work Order
|
Bill Gross Amount | Voucher Number | Voucher Date | System Voucher Number |
---|---|---|---|---|---|---|---|---|---|---|---|---|
0 | 15,112.55 | |||||||||||
1 | Murshidabad Division | BILL/00392/2024-2025 | 08/07/2024 | A.K. INSDUSTRIES | ORD/000188/2023-2024 | 1996/MURD | 21/07/2023 | MASLA PWSS under Jal Jeevan Mission of BHARATPUR - I Block, Kandi Sub division , Murshidabad District under Murshidabad Division, PHE. Dte. | 58.19 | 247-MSD/2024-25 | 24/07/2024 | VCH/000340/2024-2025 |
2 | Murshidabad Division | BILL/00529/2024-2025 | 30/07/2024 | M/S JAN MAHAMMAD | ORD/000147/2023-2024 | 1897/MURD | 17/07/2023 | SAHAPUR (Part-B) & adjoining mouzas PWSS to accommodate Of T/W,LDS, Pump House Cum Chlorine Room, boundary wall and service road, under Jal Jeevan Mission of Murshidabad District under Murshidabad Division, PHE. Dte. | 188.12 | 258-MSD/2024-25 | 06/08/2024 | VCH/000375/2024-2025 |
3 | Murshidabad Division | BILL/00537/2024-2025 | 30/07/2024 | SANJAY BISWAS | ORD/000014/2023-2024 | 982/MURD | 10/04/2023 | Edrakpur & Adjoining Mouzas Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Nowda Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 124.90 | 257-MSD/2024-25 | 06/08/2024 | VCH/000423/2024-2025 |
4 | Murshidabad Division | BILL/00594/2024-2025 | 01/08/2024 | CREATIVE CONSTRUCTION | ORD/000574/2023-2024 | 3299/MURD | 20/10/2023 | Augmentation of Ground Water Based Nagar Zone II PWSS of accommodate FHTC( 1909 Nos), Laying Distribution System, Laying Rising Main, Switch Room, Boundary Wall, 300 CUM OHR in Khargram Block within Murshidabad District under Murshidabad Division, PHE | 75.20 | 290-MSD/2024-25 | 20/08/2024 | VCH/000449/2024-2025 |
5 | Murshidabad Division | BILL/00601/2024-2025 | 01/08/2024 | M/S. GHOSH ENTERPRISE (MANAB KR GHOSH) | ORD/000604/2022-2023 | 3171/MURD | 30/11/2022 | Formal work order for Augmentation of Arazi Madhupur & its adjoining mouzas Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Berhampore Block within Berhampore Sub Division of Murshidabad Distr | 44.93 | 271-MSD/2024-25 | 20/08/2024 | VCH/000437/2024-2025 |
6 | Murshidabad Division | BILL/00610/2024-2025 | 01/08/2024 | NADIA TUBEWELLS | ORD/000038/2023-2024 | 1105/MURD | 24/04/2023 | Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II of 90.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Kelai & adjoining mouzas Water Supply Scheme at Head Work Site & 2nd Site at K h | 17.32 | 276-MSD/2024-25 | 20/08/2024 | VCH/000441/2024-2025 |
7 | Murshidabad Division | BILL/00612/2024-2025 | 01/08/2024 | RAJIB SAHA | ORD/000470/2023-2024 | 2984/MURD | 21/09/2023 | Ground Water based mini piped water supply scheme for Jot Raghu village, Block:- Farakka, Jangipur Sub-Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 6.55 | 287-MSD/2024-25 | 20/08/2024 | VCH/000346/2024-2025 |
8 | Murshidabad Division | BILL/00803/2024-2025 | 21/08/2024 | ROY ENTERPRISE | ORD/000248/2023-2024 | 2463/MURD | 09/08/2023 | Construction 200 Cum OHR, Laying Distribution System Part-A, FHTC at Brahmanpara Village (Village Code-315290), Bahara Village (Village Code-315291) & Bhandira Village (Village Code-315292), Repairing of Existing Pump house (H.W), Boundary Wall, Existing | 41.00 | 321-MSD/2024-25 | 30/08/2024 | VCH/000376/2024-2025 |
9 | Murshidabad Division | BILL/00806/2024-2025 | 21/08/2024 | MADAN MOHAN SASMAL | ORD/000215/2023-2024 | 2330/MURD | 02/08/2023 | Ground Water based piped water supply scheme for Jaulia Part- A village, Block:- Bharatpur-II, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 2.32 | 319-MSD/2024-25 | 30/08/2024 | VCH/000377/2024-2025 |
10 | Murshidabad Division | BILL/00809/2024-2025 | 21/08/2024 | HIRANMAY GHOSH | ORD/000013/2023-2024 | 983/MURD | 10/04/2023 | KOGRAM & adjoining moujas PWSS to accommodate FHTC under Jal Jivan Mission, Block- BURWAN of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE.Dte. | 143.51 | 317-MSD/2024-25 | 30/08/2024 | VCH/000471/2024-2025 |
11 | Murshidabad Division | BILL/01026/2024-2025 | 09/09/2024 | NADIA TUBEWELLS | ORD/000127/2023-2024 | 1764/MURD | 06/07/2023 | Sinking of 03 (Three) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Juranpur ( PART-A) Water Supply Scheme at Head Work Site, 2nd Site, 3 | 10.73 | 376-MSD/2024-25 | 12/09/2024 | VCH/000544/2024-2025 |
12 | Murshidabad Division | BILL/01113/2024-2025 | 23/09/2024 | R.K. DRILLING SERVICES | ORD/000137/2023-2024 | 1772/MURD | 06/07/2023 | Sinking of 03 (Three) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Bhasaipaikar Zone- I A & Kusumgachi Water Supply Scheme under Murshida | 6.09 | 429-MSD/2024-25 | 02/10/2024 | VCH/000592/2024-2025 |
13 | Murshidabad Division | BILL/01120/2024-2025 | 23/09/2024 | KISMAT ARA BEGAM | ORD/000178/2023-2024 | 1997/MURD | 21/07/2023 | Laying Distribution System (PART-C) and FHTC for KUNDAL PWSS in Burwan Block under Murshidabad Division ,PHE. Dte. | 29.46 | 439-MSD/2024-25 | 02/10/2024 | VCH/000546/2024-2025 |
14 | Murshidabad Division | BILL/01121/2024-2025 | 23/09/2024 | ESCON INDIA | ORD/000815/2022-2023 | 673/MURD | 09/03/2023 | Formal work order for Augmentation of PANCHTHUPI ZONE-I PWSS to accommodate FHTC ,under Jal Jeevan Mission, Block- BURWAN of Kandi Sub-Division, Murshidabad District under Murshidabad Division, PHE.Dte. | 128.83 | 419-MSD/2024-25 | 27/09/2024 | VCH/000606/2024-2025 |
15 | Murshidabad Division | BILL/01237/2024-2025 | 01/10/2024 | MAMATA USHA ENTERPRISE | ORD/000717/2022-2023 | 79/MURD | 10/01/2023 | Formal work order for the work of PETARI & Adjoining Mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room , Laying Distribution System, Rising Main, boundary wall and service road , under Jal Swapna of Murshidabad | 75.40 | 522-MSD/2024-25 | 06/10/2024 | VCH/000703/2024-2025 |
16 | Murshidabad Division | BILL/01239/2024-2025 | 01/10/2024 | S. DUTTA | ORD/000839/2023-2024 | 822/MURD | 15/03/2024 | AHIRON & adjoining mouzas PWSS to accommodate Rising Main with allied Laying Distribution under Jal Jeevan Mission, Block- SUTI-I of JANGIPUR Sub Division of Murshidabad District under Murshidabad Division, PHE.Dte. | 6.83 | 515-MSD/2024-25 | 06/10/2024 | VCH/000696/2024-2025 |
17 | Murshidabad Division | BILL/01247/2024-2025 | 01/10/2024 | SANDHAN ADHIKARI | ORD/000769/2022-2023 | 496/MURD | 21/02/2023 | Laying Distribution System For Augmentation of Basabari (Part-A) PWSS of Berhampore Block under Murshidabad Division ,PHE.Dte | 14.26 | 513-MSD/2024-25 | 06/10/2024 | VCH/000694/2024-2025 |
18 | Murshidabad Division | BILL/01249/2024-2025 | 01/10/2024 | PRIYANKA CONSTRUCTION | ORD/000836/2022-2023 | 833/MURD | 23/03/2023 | Formal work order for RAMNA BARAKHARI & adjoining moujas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jivan Mission, Block- BHARA | 31.48 | 508-MSD/2024-25 | 04/10/2024 | VCH/000689/2024-2025 |
19 | Murshidabad Division | BILL/01251/2024-2025 | 01/10/2024 | TIRUPATI CONSTRUCTION | ORD/000834/2022-2023 | 740/MURD | 16/03/2023 | Formal Work Order for Augmentation of PANCHTHUPI ZONE-III PWSS to accommodate FHTC under Jal Jeevan Mission, Block- BURWAN of Kandi Sub-Division, Murshidabad District under Murshidabad Division, PHE.Dte. | 16.51 | 514-MSD/2024-25 | 06/10/2024 | VCH/000695/2024-2025 |
20 | Murshidabad Division | BILL/01440/2024-2025 | 22/10/2024 | SUGATA CHOWDHURY | ORD/000233/2023-2024 | 2343/MURD | 03/08/2023 | Ground Water based piped water supply scheme for Kharsa Part- E village, Block:- Khargram, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 1.19 | 552-MSD/2024-25 | 28/10/2024 | VCH/000733/2024-2025 |
21 | Murshidabad Division | BILL/01444/2024-2025 | 22/10/2024 | M/S. BIMALENDU BOSE | ORD/000027/2023-2024 | 1076/MURD | 19/04/2023 | Laying Distribution System, Rising Main Connection, FHTC, Repairing of Existing OHR, Pump House, Construction of New Boundary Wall for Augmentation of BELE Ground water based Piped water supply scheme in Khargram Block under Murshidabad Division, PHE. Dt | 38.38 | 547-MSD/2024-25 | 28/10/2024 | VCH/000729/2024-2025 |
22 | Murshidabad Division | BILL/01463/2024-2025 | 25/10/2024 | KISMAT ARA BEGAM | ORD/000327/2022-2023 | 1691/MURD | 28/06/2022 | Formal Work Order for Augmentation of Jalangi Zone II Part-B Ground Water Based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection ) within Jalangi Block of Murshidabad District under Murshidabad Division,PHE.Dte. | 25.63 | 555-MSD/2024-25 | 30/10/2024 | VCH/000852/2024-2025 |
23 | Murshidabad Division | BILL/01466/2024-2025 | 26/10/2024 | TANUSHREE ENTERPRISE | ORD/000041/2023-2024 | 1139/MURD | 26/04/2023 | Laying Distribution System and FHTC at Bara Biadyapur Village (Village Code-315733), Tenya Village (Village-315737), Ghoshpara Village ( Village Code- 315735), Kechunia Village (Village Code-315722), Korgram Village (Village Code- 315736) & Nowapara Vill | 3.31 | 566-MSD/2024-25 | 27/11/2024 | VCH/001092/2024-2025 |
24 | Murshidabad Division | BILL/01472/2024-2025 | 28/10/2024 | KAMIRUL SK AND CO. (PART: KAMIRUL SK. & OTHERS) | ORD/000690/2022-2023 | 144/MURD | 17/01/2023 | Formal work order for the work of GARULIA & adjoining moujas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jevan Mission of Murshi | 285.77 | 559-MSD/2024-25 | 30/10/2024 | VCH/000856/2024-2025 |
25 | Murshidabad Division | BILL/01474/2024-2025 | 29/10/2024 | KAMIRUL SK AND CO. (PART: KAMIRUL SK. & OTHERS) | ORD/000707/2022-2023 | 146/MURD | 17/01/2023 | Formal work order for the work of LOHADAHA & Adjoining Mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room , Laying Distribution System, Rising Main, boundary wall and service road , under Jal Swapna of Murshidaba | 89.49 | 565-MSD/2024-25 | 27/11/2024 | VCH/001091/2024-2025 |
26 | Murshidabad Division | BILL/00298/2024-2025 | 24/06/2024 | HOQUEDAR ALI | ORD/000012/2023-2024 | 978/MURD | 10/04/2023 | SITARAMPUR PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jivan Mission, Block- SAMSERGANJ of Jangipur Sub-Division, Murshidabad District under Murshida | 34.12 | 202-MSD/2024-25 | 02/07/2024 | VCH/000268/2024-2025 |
27 | Murshidabad Division | BILL/00349/2024-2025 | 01/07/2024 | SARKAR WATER SUPPLY AGENCY | ORD/000032/2023-2024 | 1107/MURD | 24/04/2023 | Sinking of 01 (One) No. of 300 mm x 200 mm dia tube well i.e. TW-III of 90.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Bele & adjoining mouzas Water Supply Scheme at 3rd work site at K h a r g r a m B | 9.65 | 219-MSD/2024-25 | 18/07/2024 | VCH/000312/2024-2025 |
28 | Murshidabad Division | BILL/00366/2024-2025 | 03/07/2024 | DHIRENDRANATH MONDAL | ORD/000438/2023-2024 | 2886/MURD | 12/09/2023 | Laying Distribution System of AMLAI PWSS to accommodate FHTC under Jal Jeevan Mission of Murshidabad District under Bharatpur-I Block, Kandi Sub-Division of Murshidabad Division ,PHE Dte. | 87.67 | 228-MSD/2024-25 | 18/07/2024 | VCH/000319/2024-2025 |
29 | Murshidabad Division | BILL/00643/2024-2025 | 02/08/2024 | KAMIRUL SK AND CO. (PART: KAMIRUL SK. & OTHERS) | ORD/000175/2023-2024 | 1991/MURD | 21/07/2023 | BHARWAN (Part-A) & adjoining mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jeevan Mission of Murshidabad District under Murs | 51.98 | 289-MSD/2024-25 | 20/08/2024 | VCH/000448/2024-2025 |
30 | Murshidabad Division | BILL/00824/2024-2025 | 22/08/2024 | PASCON | ORD/000712/2022-2023 | 91/MURD | 11/01/2023 | Formal work order for the work of SINGADDA & adjoining moujas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jeevan Mission of Murs | 200.25 | 305-MSD/2024-25 | 31/08/2024 | VCH/000465/2024-2025 |
31 | Murshidabad Division | BILL/00826/2024-2025 | 23/08/2024 | EXECUTIVE ENGINER WBSRDA MURSHIDABAD DIVISION | null | 213/MD/SRDA /13-409 and 13-391/PHE | 17/05/2024 | Payment Cost of repairing road from Biswaspara (SH) to Jortala More PWD Road under Jalangi Block in Murshidabad District vide packeage no WB 13-409. | 32.83 | 303-MSD/2024-25 | 29/08/2024 | VCH/000456/2024-2025 |
32 | Murshidabad Division | BILL/00952/2024-2025 | 02/09/2024 | BENGAL ENTERPRISE (PROP:-HADIKUL MOLLA) | ORD/000746/2023-2024 | 82/MURD | 09/01/2024 | Construction of Boundary wall at H/O site, land Development & Approach Road in connection with Augmentation of Surangapur Zone - II PWSS under Murshidabad Division , PHE Dte. Length -266 mtr. | 16.77 | 346-MSD/2024-25 | 11/09/2024 | VCH/000514/2024-2025 |
33 | Murshidabad Division | BILL/01168/2024-2025 | 26/09/2024 | M/S. TAPAS KUMAR CHAKRABORTY & CO. | ORD/000534/2022-2023 | 2641/MURD | 19/09/2022 | Formal work order for Augmentation of Sagarpara Part-A Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Jalangi Block in the District of Murshidabad under Murshidabad Division, P H Engg Dte. | 131.57 | 467-MSD/2024-25 | 02/10/2024 | VCH/000655/2024-2025 |
34 | Murshidabad Division | BILL/01174/2024-2025 | 27/09/2024 | BABUSONA CONSTRUCTION | ORD/000176/2023-2024 | 1994/MURD | 21/07/2023 | Laying of Distribution System and Overhauling of R.C.C. elevated reservoir 800 Cum capacity of staging height 20 mtr for Augmentation work of Teghari (Zone-I) PWSS (PART-A) in Raghunathganj-II Block under Murshidabad Division, PHE.Dte. | 52.95 | 470-MSD/2024-25 | 02/10/2024 | VCH/000658/2024-2025 |
35 | Murshidabad Division | BILL/01176/2024-2025 | 27/09/2024 | S.K. ENTERPRISE (SANDIP GHOSH) | ORD/000017/2023-2024 | 991/MURD | 11/04/2023 | Laying Distribution System PART-B,FHTC for Augmentation of GOBARHATI PWSS in KANDI Block , under Murshidabad Division ,PHE.Dte.Part-B | 2.85 | 474-MSD/2024-25 | 02/10/2024 | VCH/000662/2024-2025 |
36 | Murshidabad Division | BILL/01177/2024-2025 | 27/09/2024 | M/S UNIVERSAL TRADING | ORD/000558/2023-2024 | 3219/MURD | 13/10/2023 | Augmentation of NARASINGHAPUR ZONE-I PWSS Laying Distribution System, Rising Main Connection of JALANGI Block, under Murshidabad Division PHE. Dte. PART_A | 64.52 | 456-MSD/2024-25 | 02/10/2024 | VCH/000643/2024-2025 |
37 | Murshidabad Division | BILL/01180/2024-2025 | 27/09/2024 | TRANS ORGANICS (INDIA) PVT. LTD. | ORD/000677/2022-2023 | 36/MURD | 04/01/2023 | Formal work order for the work of BRAHMANDIHI & Adjoining Mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road , under Jal Swapna of Murshida | 40.46 | 469-MSD/2024-25 | 07/10/2024 | VCH/000657/2024-2025 |
38 | Murshidabad Division | BILL/01037/2023-2024 | 09/01/2024 | BHARATI CHEMICAL & SCIENTIFIC WORKS | ORD/001247/2021-2022 | 3361/MURD | 11/10/2021 | Continuation work order for Engagement of Resource Person & Sampling Assistant at the Laboratory Site to Operate AAS Spectrophotometer System for a Period of One Year under Murshidabad Division, PHE Dte. in the district of Murshidabad. (Period from 15/10/ | 2.41 | 281-MSD/2024-25 | 12/08/2024 | VCH/001279/2023-2024 |
39 | Murshidabad Division | BILL/01047/2024-2025 | 09/09/2024 | TEKNO ENTERPRISE | ORD/000054/2023-2024 | 1260/MURD | 08/05/2023 | Construction of 1000 M3 Capacity, 20mtr. staging height RCC Elevated Service Reservoir as per Departmental type design (Ref :- DRG.No. PC/-I/OHR/17/2012) including delivery, Inlet, Washout & Overflow pipe connection etc. all complete for piped water sup | 88.83 | 374-MSD/2024-25 | 12/09/2024 | VCH/000519/2024-2025 |
40 | Murshidabad Division | BILL/01068/2024-2025 | 12/09/2024 | HOQUEDAR ALI | ORD/000012/2023-2024 | 978/MURD | 10/04/2023 | SITARAMPUR PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jivan Mission, Block- SAMSERGANJ of Jangipur Sub-Division, Murshidabad District under Murshida | 30.95 | 384-MSD/2024-25 | 19/09/2024 | VCH/000551/2024-2025 |
41 | Murshidabad Division | BILL/01072/2024-2025 | 12/09/2024 | DHIRENDRANATH MONDAL | ORD/000729/2022-2023 | 340/MURD | 08/02/2023 | Formal work order for Construction of 350 Cum OHR,Laying Distribution System (PART-C),Rising Main Connection, FHTC , for Uncovered of SALINDA PWSS in Bharatpur-II Block , Kandi Sub-Division under Murshidabad Division ,PHE.Dte. | 194.05 | 381-MSD/2024-20 | 19/09/2024 | VCH/000499/2024-2025 |
42 | Murshidabad Division | BILL/01074/2024-2025 | 12/09/2024 | ARPAN PANDIT | ORD/000820/2022-2023 | 621/MURD | 03/03/2023 | Formal work order for the work of ADWAITA NAGAR PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room , Laying Distribution System, Rising Main, boundary wall and service road , under Jal Jiban Mission of Samserganj Block, Murshidabad District | 40.78 | 391-MSD/2024-25 | 19/09/2024 | VCH/000563/2024-2025 |
43 | Murshidabad Division | BILL/01076/2024-2025 | 12/09/2024 | CHABDAR ALI TRADERS | ORD/000011/2023-2024 | 959/MURD | 05/04/2023 | BAJITPUR PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jevan Mission, Raghunathganj-II Block of Murshidabad District under Jangipur Sub-Division, Murshida | 42.07 | 385-MSD/2024-25 | 19/09/2024 | VCH/000557/2024-2025 |
44 | Murshidabad Division | BILL/01139/2024-2025 | 24/09/2024 | INDRAJIT MAZUMDAR | ORD/000401/2023-2024 | 2808/MURD | 05/09/2023 | Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at SAHAPUR AND ADJOINING MOUJAS Water Supply Scheme at Head Work Site, 2nd Site si | 15.24 | 445-MSD/2024-25 | 02/10/2024 | VCH/000624/2024-2025 |
45 | Murshidabad Division | BILL/01156/2024-2025 | 25/09/2024 | SARKAR WATER SUPPLY AGENCY | ORD/000700/2023-2024 | 3785/MURD | 11/12/2023 | Sinking of 03 (Three) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at LALGOLA ZONE-III, BHANDARA ZONE - I and SURANGAPUR ZONE -I Water Supply | 20.40 | 446-MSD/2024-25 | 02/10/2024 | VCH/000626/2024-2025 |
46 | Murshidabad Division | BILL/01286/2024-2025 | 03/10/2024 | MD MUKLESUR RAHAMAN | ORD/000783/2023-2024 | 392/MURD | 06/02/2024 | Hiring of Maxicab (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel / LPG / CNG Engine) in perfect good running condition of performing a very long journey and should be covered anywhere without any trouble on Daily hire basis for of | 0.40 | 533-MSD/2024-25 | 06/10/2024 | VCH/000714/2024-2025 |
47 | Murshidabad Division | BILL/01287/2024-2025 | 03/10/2024 | M/S JOY MA BANAMALI | ORD/000657/2023-2024 | 3381/MURD | 31/10/2023 | Hiring of maxi cab (Non Air conditioned ,Bharat stage III) on or after 31.10.2023 with diesel/LPG/CNG Engine) in perfect good condition of performing very long journey and should cover anywere within any trouble on daily wage basis for official used und | 0.40 | 534-MSD/2024-25 | 06/10/2024 | VCH/000715/2024-2025 |
48 | Murshidabad Division | BILL/01323/2024-2025 | 04/10/2024 | HAMIDUL ISLAM | ORD/000874/2023-2024 | 166/ISD | 28/03/2024 | Continuation order for Hiring of Maxicab (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/ LPG/ CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on monthly hi | 0.35 | 541-MSD/2024-25 | 06/10/2024 | VCH/000720/2024-2025 |
49 | Murshidabad Division | BILL/01325/2024-2025 | 04/10/2024 | AQUEDUCT PLASTICS PVT LTD | ORD/000292/2018-2019 | 582/MURD | 07/03/2019 | Formal Work Order for 'Surveying, Planning, Design, Delievery, erection, construction, commissioning and completion in all respect of all CIVIL,ELECTRICAL and MECHANICAL works including all allied related and enabling works but excluding construction of O | 118.34 | 544-MSD/2024-25 | 05/10/2024 | VCH/000725/2024-2025 |
50 | Murshidabad Division | BILL/01194/2024-2025 | 28/09/2024 | S. DUTTA | ORD/000716/2023-2024 | 3861/MURD | 15/12/2023 | Collection of Drinking Water Sample and detail information like Geographical location, GP Name/ Mouza/Habitation, location of source with reference household & Institution viz Schools, Anganwaris etc. , also capturing of sanitary survey status of spot sou | 8.17 | 483-MSD/2024-25 | 02/10/2024 | VCH/000670/2024-2025 |
51 | Murshidabad Division | BILL/01205/2024-2025 | 28/09/2024 | M/S. MAYA CONSTRUCTION | ORD/000240/2023-2024 | 2410/MURD | 07/08/2023 | DAFAHAT CT PWSS to accommodate 700 cum OHR ( Dept Drg No.PC-I/OHR/6/2012), 2 Nos Pump House, 2 No Boundary Wall & Path Way under Jal Jeevan Mission of Suti - II Block, Murshidabad District under Jangipur SubDivision Murshidabad Division, PHE. Dte. | 54.37 | 490-MSD/2024-25 | 02/10/2024 | VCH/000676/2024-2025 |
52 | Murshidabad Division | BILL/00309/2024-2025 | 24/06/2024 | RAJKUMAR MONDAL | ORD/000276/2023-2024 | 2617/MURD | 22/08/2023 | Augmentation of Ground Water Based Narsinghpur Zone-II PWS accommodate FHTC, Laying Distribution System, Laying Rising Main in Jalangi Block within Murshidabad District under Murshidabad Division, PHE Dte. PART_A | 29.13 | 200-MSD/2024-25 | 02/07/2024 | VCH/000266/2024-2025 |
53 | Murshidabad Division | BILL/00380/2024-2025 | 05/07/2024 | DIPAK KUMAR GHOSH | ORD/000818/2022-2023 | 675/MURD | 09/03/2023 | Formal work order for PARBATIPUR & adjoining moujas PWSS to accommodate FHTC under Jal Jivan Mission, Block- KANDI of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE.Dte. | 114.22 | 221-MSD/2024-25 | 18/07/2024 | VCH/000313/2024-2025 |
54 | Murshidabad Division | BILL/00608/2024-2025 | 01/08/2024 | NADIA TUBEWELLS | ORD/000551/2023-2024 | 3193/MURD | 12/10/2023 | Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at BACHHRA ZONE ¿ I Water Supply Scheme at Head Work Site, 2nd Site site at Belda | 10.29 | 274-MSD/2024-25 | 20/08/2024 | VCH/000439/2024-2025 |
55 | Murshidabad Division | BILL/00808/2024-2025 | 21/08/2024 | BISWAJIT ROY | ORD/000554/2023-2024 | 3215/MURD | 13/10/2023 | Ground Water based mini piped water supply scheme for Saheb Nagar village, Block:- Farakka, Jangipur Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte | 6.54 | 311-MSD/2024-25 | 05/09/2024 | VCH/000473/2024-2025 |
56 | Murshidabad Division | BILL/00936/2024-2025 | 30/08/2024 | SOUMYADIP MISRA | ORD/000900/2022-2023 | 330/MURD | 07/02/2023 | Hiring of Maxicab (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel / LPG / CNG Engine) in perfect good running condition of performing a very long journey and should be covered anywhere without any trouble on Daily hire basis for of | 0.20 | 342-MSD/2024-25 | 06/09/2024 | VCH/000491/2024-2025 |
57 | Murshidabad Division | BILL/00992/2024-2025 | 05/09/2024 | M/S. MOHAN LAL JAIN | ORD/000366/2023-2024 | 2724/MURD | 29/08/2023 | Augmentation of NATIAL RAJANAGAR ZONE-I ,II,& III Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Raninagar -II Block of Murshidabad District under Murshidabad Division, PHE. Dte. | 125.07 | 370-MSD/2024-25 | 11/09/2024 | VCH/000532/2024-2025 |
58 | Murshidabad Division | BILL/01094/2024-2025 | 18/09/2024 | SARKAR WATER SUPPLY AGENCY | ORD/000103/2023-2024 | 1744/MURD | 06/07/2023 | Sinking of 01 (One) No of 250mm x 150 mm dia tube well i.e. TW-I of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at KHAYRAMARI Part-A and Salar Zone - IIB Water Supply Scheme as required under Murshid | 7.39 | 409-MSD/2024-25 | 24/09/2024 | VCH/000580/2024-2025 |
59 | Murshidabad Division | BILL/01129/2024-2025 | 24/09/2024 | KAMIRUL SK AND CO. (PART: KAMIRUL SK. & OTHERS) | ORD/000840/2023-2024 | 818/MURD | 15/03/2024 | Allied & Balance work for Road Restoration of Damaged During Laying of pipeline and Laying of distribution pipe line of AOCHA Piped Water Supply Scheme, Bharatpur-II Block, Kandi Sub-Division under Murshidabad Division, P.H.E Dte. | 32.68 | 442-MSD/2024-25 | 02/10/2024 | VCH/000620/2024-2025 |
60 | Murshidabad Division | BILL/01226/2024-2025 | 30/09/2024 | BISWAS ENTERPRISE. | ORD/000802/2022-2023 | 564/MURD | 28/02/2023 | Providing FHTC to 754 nos. household, Rising Main, Repairing Vertical extension of Boundary wall and repairing of Pump House and overhauling of R.C.C. elevated reservoir 450 Cum capacity of staging height 20 mtr. (Shaft wall) for Augmentation work of Mahe | 20.99 | 498-MSD/2024-25 | 04/10/2024 | VCH/000681/2024-2025 |
61 | Murshidabad Division | BILL/01462/2024-2025 | 25/10/2024 | DHIRENDRANATH MONDAL | ORD/000855/2022-2023 | 794/MURD | 21/03/2023 | Formal work order for GHORSALA PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room , Laying Distribution System, Rising Main, boundary wall and service road , under Jal Jivan Mission of raghunathganj-I Block, Murshidabad District under Jangipur | 32.38 | 556-MSD/2024-25 | 30/10/2024 | VCH/000853/2024-2025 |
62 | Murshidabad Division | BILL/00335/2024-2025 | 27/06/2024 | MAMATA USHA ENTERPRISE | ORD/000387/2023-2024 | 2777/MURD | 01/09/2023 | Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at BISWANATHPUR Water Supply Scheme at Head Work Site, 2nd Site site at Khargram B | 14.11 | 206-MSD/2024-25 | 02/07/2024 | VCH/000272/2024-2025 |
63 | Murshidabad Division | BILL/00356/2024-2025 | 02/07/2024 | M/S GUHA & ROY ENTERPRISE | ORD/000579/2022-2023 | 3032/MURD | 16/11/2022 | Formal work order for Laying of Distribution system, Rising Main, Sub-soil Investigation and construction of OHR (400 cum) and construction of Boundary wall and repairing of Pump-House in connection with Augmentation of Godhanpara Zone-II water supply sch | 118.57 | 239-MSD/2024-25 | 18/07/2024 | VCH/000332/2024-2025 |
64 | Murshidabad Division | BILL/00364/2024-2025 | 03/07/2024 | MAMATA USHA ENTERPRISE | ORD/000270/2023-2024 | 2588/MURD | 21/08/2023 | Sinking of 02 (Two) Nos. of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at MUNIGARM AND ADJOINING MOUJAS Water Supply Scheme at Head Work Site, 2nd Site | 13.14 | 235-MSD/2024-25 | 18/07/2024 | VCH/000328/2024-2025 |
65 | Murshidabad Division | BILL/00657/2024-2025 | 06/08/2024 | M/S. S. DAS AND ENTERPRISE | ORD/000571/2023-2024 | 3291/MURD | 19/10/2023 | Augmentation of SATITARA under Jal Jeevan Mission of BURWAN Block, Kandi Sub Division, Murshidabad District under Murshidabad Division, PHE Dte. | 84.31 | 273-MSD/2024-25 | 09/08/2024 | VCH/000462/2024-2025 |
66 | Murshidabad Division | BILL/00702/2024-2025 | 09/08/2024 | SAMBHU NATH ROY | ORD/000267/2023-2024 | 2575/MURD | 18/08/2023 | Laying Distribution System for Augmentation of Loknathpur Zone-I (Part-A) PWSS of Beldanga-II Block under Murshidabad Division, PHE Dte. | 65.20 | 300-MSD/2024-25 | 16/08/2024 | VCH/000463/2024-2025 |
67 | Murshidabad Division | BILL/00813/2024-2025 | 21/08/2024 | M/S R B CONSTRUCTION | ORD/000611/2023-2024 | 3376/MURD | 31/10/2023 | Construction of 11 Nos. different Capacity OHR including Soil test (100,200,300,400,500,600,700,750,1000 Cum), Boundary Wall, 11 Nos Operator Shed cum chlorine room with sanitary and water supply arrangement, Laying of clear water Rising Main , Laying D | 170.31 | 310-MSD/2024-25 | 30/08/2024 | VCH/000457/2024-2025 |
68 | Murshidabad Division | BILL/00818/2024-2025 | 22/08/2024 | ULTRA CONSTRUCTION. | ORD/000079/2023-2024 | 1385/MURD | 22/05/2023 | Augmentation of BILASPUR PWSS under Jal Jivan Mission of DOMKAL Block, ISLAMPUR Sub division , Murshidabad District under Murshidabad Division, PHE. Dte. | 27.37 | 308-MSD/2024-25 | 05/09/2024 | VCH/000503/2024-2025 |
69 | Murshidabad Division | BILL/00822/2024-2025 | 22/08/2024 | DEBEN RAJAK | ORD/000606/2023-2024 | 3367/MURD | 31/10/2023 | Ground Water based mini piped water supply scheme for Raghunathpur village, Block:- Khargram, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 19.23 | 316-MSD/2024-25 | 30/08/2024 | VCH/000470/2024-2025 |
70 | Murshidabad Division | BILL/00825/2024-2025 | 22/08/2024 | MAHMOOD ASSOCIATES PRIVATE LIMITED | ORD/000846/2022-2023 | 773/MURD | 17/03/2023 | Formal work order for Augmentation of Aminabad Zone-II Piped Water Supply Scheme under Jal Jevan Mission of DOMKAL Block in the District Murshidabad under Murshidabad Division, PHE.Dte. | 127.37 | 304-MSD/2024-25 | 05/09/2024 | VCH/000501/2024-2025 |
71 | Murshidabad Division | BILL/00863/2024-2025 | 27/08/2024 | M/S GUNGUN CONSTRUCTION | ORD/000862/2022-2023 | 807/MURD | 22/03/2023 | Laying of Distribution System for Augmentation of KADOA (ZONE-I) Part B PWSS in SUTI-I Block under Murshidabad Division, PHE.Dte. | 25.75 | 326-MSD/2024-25 | 30/08/2024 | VCH/000475/2024-2025 |
72 | Murshidabad Division | BILL/00864/2024-2025 | 27/08/2024 | TRIYA CONSTRUCTION | ORD/000588/2023-2024 | 3330/MURD | 23/10/2023 | Construction of Pump House, Boundary wall & Providing Functional Household Tap Connection for Augmentation of Narasinghapur Zone-I PWSS in Jalangi Block , Islampur Sub-Division under Murshidabad Division , PHE. Dte. Part-B | 7.59 | 335-MSD/2024-25 | 05/09/2024 | VCH/000497/2024-2025 |
73 | Murshidabad Division | BILL/00873/2024-2025 | 28/08/2024 | SANJIB GHOSH | ORD/000722/2022-2023 | 172/MURD | 18/01/2023 | Construction of 250 Cum OHR for Augmentation of Mithipur Water Supply Scheme in Raghunathganj-II Block , Jangipur Sub-Division under Murshidabad Division ,PHE.Dte. | 16.98 | 337-MSD/2024-25 | 30/08/2024 | VCH/000479/2024-2025 |
74 | Murshidabad Division | BILL/00950/2024-2025 | 02/09/2024 | DHIRENDRANATH MONDAL | ORD/000172/2023-2024 | 1988/MURD | 21/07/2023 | INDRANI (Part-A) & adjoining mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Rising Main, FHTC work, boundary wall and service road, under Jal Jeevan Mission of Murshidabad District under Murshidabad Divisio | 68.99 | 352-MSD/2024-20 | 12/09/2024 | VCH/000485/2024-2025 |
75 | Murshidabad Division | BILL/00954/2024-2025 | 02/09/2024 | M/S. ROY TRADING CO. | ORD/000540/2022-2023 | 2860/MURD | 19/10/2022 | Formal Work Order for Augmentation of Saktipur Zone-I Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Beldanga-II Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 51.29 | 345-MSD/2024-25 | 11/09/2024 | VCH/000513/2024-2025 |
76 | Murshidabad Division | BILL/00965/2024-2025 | 03/09/2024 | SOUMYADIP MISRA | ORD/000900/2022-2023 | 330/MURD | 07/02/2023 | Hiring of Maxicab (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel / LPG / CNG Engine) in perfect good running condition of performing a very long journey and should be covered anywhere without any trouble on Daily hire basis for of | 0.21 | 342-MSD/2024-25 | 06/09/2024 | VCH/000492/2024-2025 |
77 | Murshidabad Division | BILL/01161/2024-2025 | 26/09/2024 | SOUMYADIP MISRA | ORD/000659/2023-2024 | 3528/MURD | 10/11/2023 | JAGANNATHPUR PWSS under Jal Jeevan Mission of BURWAN Block, Kandi Sub division , Murshidabad District under Murshidabad Division, PHE. Dte. | 66.93 | 455-MSD/2024-25 | 02/10/2024 | VCH/000642/2024-2025 |
78 | Murshidabad Division | BILL/01167/2024-2025 | 26/09/2024 | M/S. BIMALENDU BOSE | ORD/000479/2023-2024 | 3050/MURD | 29/09/2023 | Augmentation of KATAKOPRA (Zone-I) PWSS under Jal Jeevan Mission of DOMKAL Block, ISLAMPUR Sub division , Murshidabad District under Murshidabad Division, PHE Dte. (Part-A) | 207.00 | 458-MSD/2024-25 | 02/10/2024 | VCH/000645/2024-2025 |
79 | Murshidabad Division | BILL/01073/2024-2025 | 12/09/2024 | EXECUTIVE ENGINEER, PWD, MURSHIDABAD HIGHWAY DIVISION-II | null | 10-96/626 | 30/07/2024 | RESTORATION OF DAMAGED ROAD DUE TO LAYING OF PHE PIPELINE OF MAHADIA-DURGAPUR ROAD FROM 0.30 KM TO 2.10 KM UNDER MSD HIGHWAY DIVISION.-II DURING THE YEAR OF 2024-25 | 13.77 | 393-MSD/2024-25 | 19/09/2024 | VCH/000575/2024-2025 |
80 | Murshidabad Division | BILL/01078/2024-2025 | 12/09/2024 | M/S SUBHA CONSTRUCTION | ORD/000877/2022-2023 | 897/MURD | 29/03/2023 | Construction of 200 Cum OHR, Laying of Distribution System (part_A) at NODE 1 TO NODE 197, Rising Main , repairing & Overhauling of R.C.C. elevated reservoir 168 Cum capacity of staging height 20 mtr. for Augmentation work of CHANDKATI PWSS in NAWDA Blo | 24.21 | 390-MSD/2024-25 | 19/09/2024 | VCH/000562/2024-2025 |
81 | Murshidabad Division | BILL/01086/2024-2025 | 13/09/2024 | J.S. CONSTRUCTION | ORD/000312/2023-2024 | 2676/MURD | 24/08/2023 | Augmentation BANIAKHALI PWSS under Jal Jeevan Mission of DOMKAL Block, ISLAMPUR Subdivision , Murshidabad District under Murshidabad Division, PHE.Dte. (Part -A) | 157.44 | 404-MSD/2024-25 | 24/09/2024 | VCH/000582/2024-2025 |
82 | Murshidabad Division | BILL/01087/2024-2025 | 18/09/2024 | RAMAKRISHNA MISSION ASHRAMA (SEVAVRATA), BAIRGACHI | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for Remuneration of Lab-Personnel for the period 01/07/24 to 31/08/24. | 1.25 | 395-MSD/2024-25 | 20/09/2024 | VCH/000535/2024-2025 |
83 | Murshidabad Division | BILL/01148/2024-2025 | 24/09/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000610/2023-2024 | 3373/MURD | 31/10/2023 | Augmentation of Ground Water Based Seikhpara PWSS of accommodate FHTC, Laying Distribution System, Laying Rising Main, Repairing & Construction of Switch Room, Repairing of Boundary Wall, Repairing of 600 CUM OHR, Construction of 400 CUM OHR in Raninaga | 143.77 | 433-MSD/2024-25 | 02/10/2024 | VCH/000612/2024-2025 |
84 | Murshidabad Division | BILL/01289/2024-2025 | 03/10/2024 | MAJUMDER CONSTRUCTION | ORD/000787/2020-2021 | 3138/MURD | 11/12/2020 | Retrofitting Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission and Jal Swapna under command area of village Kandibandha (Village code 315327) under Sahajadpur Ground Water Based Water Supply Scheme for Arsenic Affected Area | 14.68 | 529-MSD/2024-25 | 06/10/2024 | VCH/000710/2024-2025 |
85 | Murshidabad Division | BILL/01318/2024-2025 | 04/10/2024 | H.L. CONSTRUCTION (TITAN BISWAS) | ORD/000792/2022-2023 | 592/MURD | 01/03/2023 | Formal work order for construction of 250 Cum OHR, Pump House at Head Work Site & 2nd Tube well site , Laying Distribution System (PART-A), Rising Main, Boundwary Wall of GAFULIA PWSS, in Burwan Block under Murshidabad Division ,PHE.Dte. [ (i)Amount | 17.00 | 543-MSD/2024-25 | 06/10/2024 | VCH/000724/2024-2025 |
86 | Murshidabad Division | BILL/01197/2024-2025 | 28/09/2024 | BISWAS ENTERPRISE (PROP. JESMIN KHATUN) | ORD/000521/2022-2023 | 2496/MURD | 30/08/2022 | Formal Work Order for Augmentation of CHANDPUR Zone-II Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Nawda Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 53.32 | 479-MSD/2024-25 | 02/10/2024 | VCH/000667/2024-2025 |
87 | Murshidabad Division | BILL/01216/2024-2025 | 30/09/2024 | R.K. DRILLING SERVICES | ORD/000121/2023-2024 | 1762/MURD | 06/07/2023 | Sinking of 03 (Three) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Aminabad (Zone-II) & Katakobra Zone - I Water Supply Scheme under Mur | 10.11 | 504-MSD/2024-25 | 04/10/2024 | VCH/000685/2024-2025 |
88 | Murshidabad Division | BILL/00312/2024-2025 | 24/06/2024 | TARIKUL SK | ORD/000832/2022-2023 | 719/MURD | 14/03/2023 | Formal work order for Laying Distribution System and Rising Main Connection For Augmentation of Kankuria Jafrabad (Zone-I) PWSS of Samserganj Block in Jangipur Sub-Division under Murshidabad Division ,PHE.Dte. | 44.32 | 197-MSD/2024-25 | 02/07/2024 | VCH/000263/2024-2025 |
89 | Murshidabad Division | BILL/00374/2024-2025 | 05/07/2024 | M/S JATIN | ORD/000596/2023-2024 | 3342/MURD | 28/10/2023 | Construction of 700 Cum OHR, Boundary Wall (H.W, 2nd & 3rd Site), Pump House (H.W, 2nd & 3rd Site), Land Development (H.W, 2nd & 3rd Site) and office cum godown of HIZOLE (Zone- I) & its adjoining mouzas water supply scheme of Kandi Block under Murshida | 17.24 | 233-MSD/2024-25 | 18/07/2024 | VCH/000326/2024-2025 |
90 | Murshidabad Division | BILL/00376/2024-2025 | 05/07/2024 | SUMAN ENTERPRISE AND SUMAN AQUA | ORD/000823/2023-2024 | 744/MURD | 12/03/2024 | Replacing of Filter media of Existing AIRP (Modified Sujapur Sadhipur Model ) of (Capacity 120 Cum/hr.) at Kankramari Water Supply Scheme of Jangipur Sub-Division under Murshidabad Division, PHEngineering Dte. | 41.42 | 218-MSD/2024-25 | 16/07/2024 | VCH/000311/2024-2025 |
91 | Murshidabad Division | BILL/00378/2024-2025 | 05/07/2024 | M/S GUHA & ROY ENTERPRISE | ORD/000725/2023-2024 | 3952/MURD | 26/12/2023 | Augmentation of AMINABAD ZONE-I Piped Water Supply Scheme under Jal Jeevan Mission of DOMKAL Block in the District Murshidabad District under Murshidabad Division, PHE. Dte. | 66.05 | 238-MSD/2024-25 | 18/07/2024 | VCH/000331/2024-2025 |
92 | Murshidabad Division | BILL/00388/2024-2025 | 05/07/2024 | BIJAY CHOWDHURY | ORD/000836/2023-2024 | 785/MURD | 14/03/2024 | Allied work for Construction of Annular Combined Pile Raft Foundation for R.C.C Elevated Reservoir of Capacity 900 CuM of staging height 20 Meter at Head Work site within BANYESWAR(Zone-XIII) W/S Scheme, Block-Sagardighi, District-Murshidabad Under Murshi | 76.21 | 246-MSD/2024-25 | 18/07/2024 | VCH/000339/2024-2025 |
93 | Murshidabad Division | BILL/00539/2024-2025 | 30/07/2024 | ATIKUL SAIKH | ORD/000819/2022-2023 | 801/MURD | 22/03/2023 | Augmentation of Ground Water Based HAFANIA (ZONE-II) & KEYADANGA PWSS, Block- SUTI-II, District-Murshidabad, Under Murshidabad Division, P.H.Engineering Dte. | 75.78 | 256-MSD/2024-25 | 06/08/2024 | VCH/000863/2024-2025 |
94 | Murshidabad Division | BILL/00604/2024-2025 | 01/08/2024 | S.&P. ENTERPRISE | ORD/000764/2022-2023 | 480/MURD | 20/02/2023 | Formal work order for construction of 250 Cum OHR , Laying Distribution System (PART-A), Rising Main, FHTC, for Uncovered SANTOSHPUR PWSS in Kandi Block , Kandi Sub-Division under Murshidabad Division ,PHE.Dte. [ (i) Amount for LDS , R.Main & FHTC: Rs.2, | 44.35 | 286-MSD/2024-25 | 20/08/2024 | VCH/000447/2024-2025 |
95 | Murshidabad Division | BILL/00606/2024-2025 | 01/08/2024 | M/S. S.C. CIVIL ENTERPRISES | ORD/000258/2023-2024 | 2469/MURD | 09/08/2023 | Providing FHTC Connection to 1050 nos household , Construction of 450 Cum OHR, Laying of Distribution System, Rising Main ,Construction of Boundary Wall and Pump House with sanitary and Water Supply Arrangement for Augmentation work of REJINAGAR Z | 90.73 | 285-MSD/2024-25 | 20/08/2024 | VCH/000446/2024-2025 |
96 | Murshidabad Division | BILL/00990/2024-2025 | 05/09/2024 | M/S. N. ISLAM AND CO. | ORD/000689/2022-2023 | 128/MURD | 16/01/2023 | Formal work order for Laying of Distribution System, Rising Main, Construction of Boundary wall , Repairing & Renovation of Pump House in connection with Augmentation of Dogachhi Zone-I Water Supply Scheme in Samsherganj Block of Murshidabad District un | 33.48 | 365-MSD/2024-25 | 11/09/2024 | VCH/000540/2024-2025 |
97 | Murshidabad Division | BILL/01028/2024-2025 | 09/09/2024 | H.I.ENTERPRISE | ORD/000339/2022-2023 | 1807/MURD | 11/07/2022 | Formal work order for Augmentation of Jalangi Zone-IV Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection ) under Jal Swapna in Jalangi Block of Murshidabad District under Murshidabad Division,PHE.Dte. | 39.92 | 372-MSD/2024-25 | 12/09/2024 | VCH/000542/2024-2025 |
98 | Murshidabad Division | BILL/01103/2024-2025 | 20/09/2024 | SARKAR WATER SUPPLY AGENCY | ORD/000105/2024-2025 | 2195/MURD | 31/07/2024 | Sinking of 2NOS. 300mm x 200 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Raturi Zone-II Water Supply Scheme and Bahutuli Water Supply Scheme under Murshidabad Division, P.H.Eng | 9.80 | 412-MSD/2024-20 | 24/09/2024 | VCH/000583/2024-2025 |
99 | Murshidabad Division | BILL/01123/2024-2025 | 23/09/2024 | J.S. CONSTRUCTION | ORD/000572/2023-2024 | 3296/MURD | 20/10/2023 | Augmentation Work Laying Distribution System, Rising Main Connection, FHTC of Herampur Zone-I PWS in Raninagar - I Block within Murshidabad District under Murshidabad Division, PHE Dte. (PART - A) | 125.34 | 418-MSD/2024-25 | 27/09/2024 | VCH/000531/2024-2025 |
100 | Murshidabad Division | BILL/01128/2024-2025 | 24/09/2024 | PRANAB KUMAR GHOSH | ORD/000715/2022-2023 | 106/MURD | 13/01/2023 | Formal work order for the work of MUNIGRAM & adjoining moujas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall, IEP and service road, under Jal Jevan Mission of M | 124.70 | 438-MSD/2024-25 | 02/10/2024 | VCH/000617/2024-2025 |
101 | Murshidabad Division | BILL/01132/2024-2025 | 24/09/2024 | NURTAJ SHAIKH | ORD/000843/2022-2023 | 753/MURD | 16/03/2023 | Formal work order for KELAI (PART-B) & adjoining moujas PWSS to accommodate FHTC under Jal Jivan Mission, Block- KHARGRAM of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE.Dte. | 55.31 | 436-MSD/2024-25 | 02/10/2024 | VCH/000615/2024-2025 |
102 | Murshidabad Division | BILL/01224/2024-2025 | 30/09/2024 | DHIRENDRANATH MONDAL | ORD/000142/2023-2024 | 1866/MURD | 14/07/2023 | BADDA PWSS under Jal Jeevan Mission of BURWAN Block, Kandi Sub division , Murshidabad District under Murshidabad Division, PHE.Dte. (Part A) | 47.74 | 494-MSD/2024-25 | 04/10/2024 | VCH/000588/2024-2025 |
103 | Murshidabad Division | BILL/01233/2024-2025 | 01/10/2024 | MITRA CONSTRUCTION | ORD/000152/2023-2024 | 1900/MURD | 17/07/2023 | Laying Distribution System (PART-B), FHTC in GAFULIA Water at Supply Scheme in Burwan Block , under Murshidabad Division ,PHE. Dte. | 23.55 | 497-MSD/2024-25 | 04/10/2024 | VCH/000680/2024-2025 |
104 | Murshidabad Division | BILL/01240/2024-2025 | 01/10/2024 | AMAL KUMAR DAS | ORD/000169/2023-2024 | 1975/MURD | 20/07/2023 | BISWANATHPUR PWSS under Jal Jeevan Mission of KHARGRAM Block, Kandi Sub division , Murshidabad District under Murshidabad Division, PHE. Dte. | 24.44 | 517-MSD/2024-25 | 06/10/2024 | VCH/000697/2024-2025 |
105 | Murshidabad Division | BILL/01243/2024-2025 | 01/10/2024 | RAMAKRISHNA MISSION ASHRAMA (SEVAVRATA), BAIRGACHI | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for Remuneration of Lab-Personnel for the period 01/09/24 to 30/09/24 and Claim for Festival Bonus of Lab-Personnel for the period 2023-2024. | 0.63 | 536-MSD/2024-25 | 06/10/2024 | VCH/000598/2024-2025 |
106 | Murshidabad Division | BILL/01244/2024-2025 | 01/10/2024 | MAMATA USHA ENTERPRISE | ORD/000695/2023-2024 | 3768/MURD | 08/12/2023 | Sinking of 01 (One) Nos of 300mm x 200 mm dia tube well i.e. TW-I of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at KUPILA Water Supply Scheme and Herampur Zone - I Water Supply Scheme under Murshida | 10.55 | 523-MSD/2024-25 | 06/10/2024 | VCH/000704/2024-2025 |
107 | Murshidabad Division | BILL/01246/2024-2025 | 01/10/2024 | IMAGIN | ORD/000113/2024-2025 | 2386/MURD | 23/08/2024 | Infrastructure support for Information Education & Communication (IEC) activities reached to judicious and safe way of drinking water adopting different modes eg display lands, magic show/folk song, leaflet/booklet, school IEC, formation . and their docum | 92.65 | 510-MSD/2024-25 | 04/10/2024 | VCH/000691/2024-2025 |
108 | Murshidabad Division | BILL/01255/2024-2025 | 01/10/2024 | KALACHAND DAS | ORD/000620/2023-2024 | 3395/MURD | 01/11/2023 | Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at SRIKANTABATI PART B & JOTKAMAL ZONE -II Water Supply Scheme under Murshidabad D | 12.80 | 516-MSD/2024-25 | 05/10/2024 | VCH/000601/2024-2025 |
109 | Murshidabad Division | BILL/01439/2024-2025 | 22/10/2024 | M/S. BOJLUR RAHAMAN | ORD/000604/2023-2024 | 3365/MURD | 31/10/2023 | Ground Water based mini piped water supply scheme for Katigram village, Block:- Khargram, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 6.10 | 549-MSD/2024-25 | 28/10/2024 | VCH/000731/2024-2025 |
110 | Murshidabad Division | BILL/01442/2024-2025 | 22/10/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000229/2023-2024 | 2401/MURD | 07/08/2023 | SAHAJADPUR CT PWSS to accommodate FHTC, Pump House Cum Chlorine Room , Laying Distribution System, Rising Main, boundary wall and service road , under Jal Jeevan Mission of Raghunathganj-II Block, Murshidabad District under Jangipur Sub Division, Murs | 52.85 | 551-MSD/2024-25 | 30/10/2024 | VCH/000857/2024-2025 |
111 | Murshidabad Division | BILL/01460/2024-2025 | 25/10/2024 | NADIA TUBEWELLS | ORD/000039/2023-2024 | 1099/MURD | 24/04/2023 | Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II of 90.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Punrapara & adjoining mouzas Water Supply Scheme at Head Work Site & | 18.97 | 554-MSD/2024-25 | 30/10/2024 | VCH/000735/2024-2025 |
112 | Murshidabad Division | BILL/01471/2024-2025 | 28/10/2024 | M/S. S. DAS AND ENTERPRISE | ORD/000571/2023-2024 | 3291/MURD | 19/10/2023 | Augmentation of SATITARA under Jal Jeevan Mission of BURWAN Block, Kandi Sub Division, Murshidabad District under Murshidabad Division, PHE Dte. | 130.13 | 558-MSD/2024-25 | 30/10/2024 | VCH/000855/2024-2025 |
113 | Murshidabad Division | BILL/00336/2024-2025 | 27/06/2024 | MAMATA USHA ENTERPRISE | ORD/000047/2023-2024 | 1217/MURD | 03/05/2023 | Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II of 90.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Nabadurga & adjoining mouzas Water Supply Scheme at Head Work Site & 2nd | 9.20 | 205-MSD/2024-25 | 02/07/2024 | VCH/000271/2024-2025 |
114 | Murshidabad Division | BILL/00350/2024-2025 | 01/07/2024 | S.K. ENTERPRISE (SANDIP GHOSH) | ORD/000017/2023-2024 | 991/MURD | 11/04/2023 | Laying Distribution System PART-B,FHTC for Augmentation of GOBARHATI PWSS in KANDI Block , under Murshidabad Division ,PHE.Dte.Part-B | 8.34 | 227-MSD/2024-25 | 18/07/2024 | VCH/000318/2024-2025 |
115 | Murshidabad Division | BILL/00357/2024-2025 | 02/07/2024 | RAJU ENTERPRISE | ORD/000839/2022-2023 | 743/MURD | 16/03/2023 | Laying of Rising Main & Distribution System for Augmentation of FATELLAPUR Piped Water Supply in SUTI-I Block under Murshidabad Division, PHE. Dte. | 13.46 | 216-MSD/2024-25 | 08/07/2024 | VCH/000310/2024-2025 |
116 | Murshidabad Division | BILL/00361/2024-2025 | 02/07/2024 | MAJUMDER CONSTRUCTION | ORD/000771/2020-2021 | 3018/MURD | 04/12/2020 | Retrofitting of Functional Household Tap Connections (FHTC) and allied works in connection with " JALSWAPNA (JAL JEEVAN MISSION)" from existing Distribution system within the Command area of village MAIN(Village Code 315632) under Saktipur Ground Water Ba | 8.39 | 294-MSD/24-25 | 20/08/2024 | VCH/000452/2024-2025 |
117 | Murshidabad Division | BILL/00365/2024-2025 | 03/07/2024 | M/S GUHA AND ROY | ORD/000532/2022-2023 | 2540/MURD | 02/09/2022 | Formal Work Order for Augmentation of Sagarpara Part-B Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Jalangi Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 36.53 | 237-MSD/2024-25 | 18/07/2024 | VCH/000330/2024-2025 |
118 | Murshidabad Division | BILL/00372/2024-2025 | 05/07/2024 | MAMATA USHA ENTERPRISE | ORD/000662/2022-2023 | 3407/MURD | 22/12/2022 | Sinking of 02(Two) Nos 250mm x 150 mm dia tube well 100.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at UDAY CHANDPUR PWSS at Head Work Site & 2nd Tube Well Site in Kandi Block under Kandi Sub-Division, | 14.97 | 236-MSD/2024-25 | 18/07/2024 | VCH/000329/2024-2025 |
119 | Murshidabad Division | BILL/00820/2024-2025 | 22/08/2024 | S. DUTTA | ORD/000856/2022-2023 | 792/MURD | 21/03/2023 | Laying of distribution system for Augmentation work of RATURI ZONE I Piped Water Supply Scheme in SUTI-I Block under Murshidabad Division, PHE.Dte. | 17.56 | 307-MSD/2024-25 | 30/08/2024 | VCH/000466/2024-2025 |
120 | Murshidabad Division | BILL/00867/2024-2025 | 27/08/2024 | R.K. DRILLING SERVICES | ORD/000121/2023-2024 | 1762/MURD | 06/07/2023 | Sinking of 03 (Three) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Aminabad (Zone-II) & Katakobra Zone - I Water Supply Scheme under Mur | 21.67 | 336-MSD/2024-25 | 30/08/2024 | VCH/000478/2024-2025 |
121 | Murshidabad Division | BILL/01166/2024-2025 | 26/09/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000042/2023-2024 | 1140/MURD | 26/04/2023 | Laying Distribution System & Functional Household Tap Connection (FHTC) for Augmentation of GOKARNA Water Supply Scheme under Murshidabad Division, P.H.E.Dte.(PART-C) | 48.57 | 465-MSD/2024-25 | 02/10/2024 | VCH/000653/2024-2025 |
122 | Murshidabad Division | BILL/01171/2024-2025 | 26/09/2024 | JIBENDRA NARAYAN SUKUL | ORD/000697/2022-2023 | 132 / MURD | 16/01/2023 | Formal work order for Laying Distribution System (PART -A) of SIJGRAM PWSS of Bharatpur - I Block, Kandi Sub Division under Murshidabad District, PHE Dte. | 42.42 | 454-MSD/2024-25 | 02/10/2024 | VCH/000640/2024-2025 |
123 | Murshidabad Division | BILL/01175/2024-2025 | 27/09/2024 | ARINDAM MAJUMDAR | ORD/000626/2022-2023 | 3278/MURD | 09/12/2022 | Formal work order for Laying of Distribution system(Part-A) , Rising Main, Providing Functional Household Tap Connection to 670 nos household & Repair and Renovation of OHR of 500 cum Capacity of Katlamari Zone -I Water Supply Scheme of Islampur Sub-Divis | 21.97 | 473-MSD/2024-25 | 02/10/2024 | VCH/000661/2024-2025 |
124 | Murshidabad Division | BILL/01184/2024-2025 | 27/09/2024 | GOURANGA MONDAL | ORD/000838/2022-2023 | 758/MURD | 16/03/2023 | JAJAN & adjoining moujas PWSS to accommodate FHTC under Jal Jivan Mission, Block- BHARATPUR-I of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE.Dte. | 42.10 | 463-MSD/2024-25 | 02/10/2024 | VCH/000651/2024-2025 |
125 | Murshidabad Division | BILL/01034/2024-2025 | 09/09/2024 | NATIONAL CONSTRUCTION (PROP:NIZAMUL BISWAS) | ORD/000840/2022-2023 | 744/MURD | 16/03/2023 | Formal Work Order for Augmentation of BRINDABANPUR ZONE-II Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Raninagar -II Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 82.83 | 377-MSD/2024-25 | 12/09/2024 | VCH/000545/2024-2025 |
126 | Murshidabad Division | BILL/01065/2024-2025 | 12/09/2024 | RATAN DUTTA | ORD/000255/2023-2024 | 2492/MURD | 11/08/2023 | Kamalakantapur PWSS to accommodate FHTC of 1518 nos household under Jal Jeevan Mission of Bharatpur-I Block, Murshidabad District under Murshidabad Division, PHE. Dte. | 24.25 | 387-MSD/2024-25 | 19/09/2024 | VCH/000559/2024-2025 |
127 | Murshidabad Division | BILL/01077/2024-2025 | 12/09/2024 | EXECUTIVE ENGINER WBSRDA MURSHIDABAD DIVISION | null | 829/MD/SRDA/13-365/PHE, | 08/08/2024 | CONSTRUCTION OF ROAD FROM GOKARNA TO ASOLAMPUR, PACKAGE NO- WB-13 -365, LENG- 10.215 KM , BLOCK KANDI, IN THE DIST MUSHIDABAD | 5.19 | 403-MSD/2024-25 | 23/09/2024 | VCH/000581/2024-2025 |
128 | Murshidabad Division | BILL/01084/2024-2025 | 13/09/2024 | PRAFULLYA CONSTRUCTION | ORD/000812/2022-2023 | 670/MURD | 09/03/2023 | Formal work order for the work of KOHETPUR PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jivan Mission of SAMSERGANJ Block, Murshidabad District under Mu | 51.92 | 408/-MSD/2024-2 | 24/09/2024 | VCH/000486/2024-2025 |
129 | Murshidabad Division | BILL/01090/2024-2025 | 18/09/2024 | COMMUNITY POLITECHNIC SCHEME, MIT | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the month of August 2024. | 0.45 | 398-MSD/2024-25 | 20/09/2024 | VCH/000538/2024-2025 |
130 | Murshidabad Division | BILL/01143/2024-2025 | 24/09/2024 | JD ENGINEERING | null | GO2223013663PH | 09/02/2023 | PURCHASE OF 3 NOS COMPUTER FOR MSD DIVISION, INVOICE NO- JDE/24-25/47, 25/07/2024 | 2.05 | 450-MSD/2024-25 | 02/10/2024 | VCH/000861/2024-2025 |
131 | Murshidabad Division | BILL/01149/2024-2025 | 24/09/2024 | ROY CONSTRUCTION (PROP:AVIJIT ROY) | ORD/000829/2022-2023 | 694/MURD | 10/03/2023 | Formal Work Order for LOKAIPUR PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jevan Mission, Raghunathganj-II Block of Murshidabad District under Jangipur | 60.62 | 441-MSD/2024-25 | 02/10/2024 | VCH/000619/2024-2025 |
132 | Murshidabad Division | BILL/01158/2024-2025 | 25/09/2024 | IMAGIN | ORD/000008/2024-2025 | 1641/MURD | 29/05/2024 | Continuation work order for Wall writing on smooth, durable wall surface (preferably of Govt. premises/Boundary wall) by cleaning the surface thoroughly, removing old paints, preparing with one coat good quality exterior primer and painting the surface w | 91.30 | 447-MSD/2024-25 | 02/10/2024 | VCH/000521/2024-2025 |
133 | Murshidabad Division | BILL/01322/2024-2025 | 04/10/2024 | MUNNA AGROTECH ENTERPRISE ( PRO: MIRAJUL ISLAM) | ORD/000873/2023-2024 | 165/ISD | 28/03/2024 | Continuation order for Hiring of Maxicab (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/ LPG/ CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on monthly hi | 0.40 | 542-MSD/2024-25 | 06/10/2024 | VCH/000723/2024-2025 |
134 | Murshidabad Division | BILL/01191/2024-2025 | 28/09/2024 | M/S. CHAKRABORTY & COMPANY | ORD/000279/2023-2024 | 2642/MURD | 23/08/2023 | SALU & adjoining mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jeevan Mission, Block- BHARATPUR-II of Murshidabad District | 66.75 | 487-MSD/2024-25 | 02/10/2024 | VCH/000673/2024-2025 |
135 | Murshidabad Division | BILL/01193/2024-2025 | 28/09/2024 | PRASANTA SANA | ORD/000845/2023-2024 | 827/MURD | 15/03/2024 | Balance work of road restoration damaged during laying of pipeline and laying of distribution pipe line of Bundai Piped Water Supply Scheme, Kandi Block, Kandi Sub-Division under Murshidabad Division, P.H.E dte. | 6.51 | 481-MSD/2024-25 | 02/10/2024 | VCH/000595/2024-2025 |
136 | Murshidabad Division | BILL/01214/2024-2025 | 30/09/2024 | S.K. CONSTRUCTION (SARIKUL) | ORD/000639/2022-2023 | 3288/MURD | 09/12/2022 | Formal work order for construction of 1250 M3 Capacity, 20mtr. staging height RCC Elevated Service Reservoir as per Departmental type design (Ref :- DRG.No. PC/-I/OHR/18/2012) including , delivery, Inlet, Washout & Overflow pipe connection etc. all comple | 76.52 | 528-MSD/2024-25 | 06/10/2024 | VCH/000709/2024-2025 |
137 | Murshidabad Division | BILL/01219/2024-2025 | 30/09/2024 | HARUN ALL RASHID & BROTHERS | ORD/000710/2023-2024 | 3814/MURD | 12/12/2023 | Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at ANDHUA ZONE -I Water Supply Scheme at Head Work Site, 2nd Site, 3 r d s | 7.69 | 525-MSD/2024-25 | 06/10/2024 | VCH/000706/2024-2025 |
138 | Murshidabad Division | BILL/01532/2024-2025 | 12/11/2024 | BISWADEB CHOWDHURY, A.E ISD | null | PHE/Estt/2133/2E-81/18 | 28/04/2022 | Remuneration of Contractual Assistant Engineer(Civil) posted at Islampur Sub-Division, PHE Dte. under Murshidabad Division, PHE Dte. in the district of Murshidabad. for the month of June 2024 & October 2024. | 1.40 | 570-MSD/2024-25 | 25/11/2024 | VCH/001097/2024-2025 |
139 | Murshidabad Division | BILL/01533/2024-2025 | 12/11/2024 | RURAL NATIONAL CLUB | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of lab personnel for the month of October 2024. | 0.45 | 571-MSD/2024-25 | 25/11/2024 | VCH/001013/2024-2025 |
140 | Murshidabad Division | BILL/01581/2024-2025 | 03/12/2024 | FARAKKA BEEDI SHRAMIK KALYAN SAMITY | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the month of November 2024 | 0.45 | 582-MSD/2024-25 | 06/12/2024 | VCH/001088/2024-2025 |
141 | Murshidabad Division | BILL/00315/2024-2025 | 25/06/2024 | M/S. BIMALENDU BOSE | ORD/000949/2021-2022 | 3520/MURD | 09/11/2021 | Formal work order for Water Supply arrangmenet for arsenic affected habitation with SOLAR Power connection by Construction/ installation of Comiunity Purification Plant (CPP) unit including Tubewell (125 x 50 mm dia ) with Submersible pump (for Populatio | 8.65 | 196-MSD/2024-25 | 02/07/2024 | VCH/000262/2024-2025 |
142 | Murshidabad Division | BILL/00329/2024-2025 | 26/06/2024 | DHIRENDRANATH MONDAL | ORD/000537/2023-2024 | 3146/MURD | 09/10/2023 | Augmentation of DAKSHIN KHANDA (ZONE - IA) PWSS under Jal Jeevan Mission of Bharatpur-II Block, Kandi Sub division , Murshidabad District under Murshidabad Division, PHE.Dte. | 20.20 | 203-MSD/2024-25 | 02/07/2024 | VCH/000269/2024-2025 |
143 | Murshidabad Division | BILL/00379/2024-2025 | 05/07/2024 | S.K. ENTERPRISE (SANDIP GHOSH) | ORD/000744/2022-2023 | 382/MURD | 10/02/2023 | Formal work order for Laying Distribution system (PART-A) at SADPUR PWSS of Kandi Block , Kandi Sub-Division under Murshidabad Division ,PHE.Dte. | 7.75 | 226-MSD/2024-25 | 18/07/2024 | VCH/000308/2024-2025 |
144 | Murshidabad Division | BILL/00535/2024-2025 | 30/07/2024 | RAMAKRISHNA MISSION ASHRAMA (SEVAVRATA), BAIRGACHI | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for Remuneration of Lab-Personnel for the period 01/06/24 to 30/06/24 | 0.45 | 278-MSD/2024-25 | 12/08/2024 | VCH/000348/2024-2025 |
145 | Murshidabad Division | BILL/00536/2024-2025 | 30/07/2024 | GHOSH ENTERPRISE | ORD/000256/2023-2024 | 2466/MURD | 09/08/2023 | Augmentation Work of Mahesail Zone-III Piped Water Supply Scheme to accommodate with FHTC (1034 Nos), Laying of Rising Main , Laying of Distribution System , construction of 350 CUM OHR, Construction of Switch Room, Boundary Wall under Jal Jeevan Missi | 54.19 | 255-MSD/2024-25 | 06/08/2024 | VCH/000422/2024-2025 |
146 | Murshidabad Division | BILL/00593/2024-2025 | 01/08/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000610/2023-2024 | 3373/MURD | 31/10/2023 | Augmentation of Ground Water Based Seikhpara PWSS of accommodate FHTC, Laying Distribution System, Laying Rising Main, Repairing & Construction of Switch Room, Repairing of Boundary Wall, Repairing of 600 CUM OHR, Construction of 400 CUM OHR in Raninaga | 29.42 | 291-MSD/2024-25 | 20/08/2024 | VCH/000450/2024-2025 |
147 | Murshidabad Division | BILL/00599/2024-2025 | 01/08/2024 | ROY & SAMANTA CONSTRUCTION | ORD/000843/2023-2024 | 781/MURD | 14/03/2024 | Infrastructural development of Domkal S.D Laboratory and Jangipur S.D Laboratory to accommodate the installation of AAS (Atomic Apsorption Spectrometry) under Murshidabad Division, PHE Dte. | 4.52 | 270-MSD/2024-25 | 12/08/2024 | VCH/000461/2024-2025 |
148 | Murshidabad Division | BILL/00603/2024-2025 | 01/08/2024 | DEBOJYOTI CONSTRUCTION | ORD/000409/2023-2024 | 2828/MURD | 07/09/2023 | Ground Water based mini piped water supply scheme for Lakshmipur village, Block:- Farakka, Jangipur Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 16.16 | 288-MSD/2024-25 | 20/08/2024 | VCH/000345/2024-2025 |
149 | Murshidabad Division | BILL/00684/2024-2025 | 07/08/2024 | DOBAY CONSTRUCTION | ORD/000718/2022-2023 | 104/MURD | 13/01/2023 | Formal work order for the work of EKPAHARIA (Part-A) & adjoining moujas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room , Rising Main, boundary wall and service road, under Jal Jevan Mission of Murshidabad District u | 77.09 | 297-MSD/2024-25 | 20/08/2024 | VCH/000454/2024-2025 |
150 | Murshidabad Division | BILL/00804/2024-2025 | 21/08/2024 | M/S S M ENTERPRISE | ORD/000844/2023-2024 | 778/MURD | 14/03/2024 | Construction of Pump House, Boundary Wall, of BRINDABANPUR ZONE-II Ground water based Piped water supply scheme with in Raninagar -II Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 9.95 | 318-MSD/2024-25 | 05/09/2024 | VCH/000409/2024-2025 |
151 | Murshidabad Division | BILL/00805/2024-2025 | 21/08/2024 | M/S. DIPTI ENTERPRISE | null | PHE/WSSO/112(Pt-III)/1194-1204 | 27/04/2016 | Carrying referral water samples to state laboratory. | 0.07 | 329-MSD/2024-25 | 30/08/2024 | VCH/000411/2024-2025 |
152 | Murshidabad Division | BILL/00985/2024-2025 | 04/09/2024 | M/S.S.S. ENTERPRISE | ORD/000251/2023-2024 | 2462/MURD | 09/08/2023 | Laying Distribution System (PART-B), FHTC work at Dohalia Village (Village Code-315294), Baje Dohalia Village (Village Code-315293) & Bhandira Village (Village Code-315292) for Augmentation of of BAHARA Ground water based Piped water supply scheme in KA | 68.93 | 371-MSD/2024-25 | 11/09/2024 | VCH/000541/2024-2025 |
153 | Murshidabad Division | BILL/00991/2024-2025 | 05/09/2024 | INDRAJIT MAZUMDAR | ORD/000277/2023-2024 | 2606/MURD | 22/08/2023 | Sinking of 03 (Three) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at UMARPUR Water Supply Scheme at Head Work Site, 2nd Site site at Suti-II Block | 19.10 | 364-MSD/2024-25 | 11/09/2024 | VCH/000530/2024-2025 |
154 | Murshidabad Division | BILL/01092/2024-2025 | 18/09/2024 | ARIZ ENTERPRISE | ORD/000848/2022-2023 | 781/MURD | 20/03/2023 | Formal work order for KIRTTIPUR & adjoining moujas PWSS to accommodate FHTC under Jal Jivan Mission, Block- KHARGRAM of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE.Dte. | 18.54 | 407-MSD/2024-25 | 24/09/2024 | VCH/000578/2024-2025 |
155 | Murshidabad Division | BILL/01115/2024-2025 | 23/09/2024 | M/S. CHOWDHURY CONSTRUCTION | ORD/000177/2023-2024 | 1995/MURD | 21/07/2023 | Laying of Distribution System for Augmentation work of Teghari (Zone-I) PWSS (PART-B) in Raghunathganj-II Block under Murshidabad Division , PHE. Dte. | 33.88 | 423-MSD/2024-25 | 27/09/2024 | VCH/000608/2024-2025 |
156 | Murshidabad Division | BILL/01118/2024-2025 | 23/09/2024 | SAMAR MUKHERJEE | ORD/000866/2022-2023 | 829/MURD | 23/03/2023 | Providing FHTC Connection to 923 no household and Overhauling of RCC 450 Cum OHR for Augmentation of KADOA (ZONE-I) Part B Piped Water Supply Scheme in SUTI-I Block under Murshidabad Division, PHE.Dte. | 37.54 | 417-MSD/2024-25 | 25/09/2024 | VCH/000605/2024-2025 |
157 | Murshidabad Division | BILL/01119/2024-2025 | 23/09/2024 | DHIRENDRANATH MONDAL | ORD/000855/2022-2023 | 794/MURD | 21/03/2023 | Formal work order for GHORSALA PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room , Laying Distribution System, Rising Main, boundary wall and service road , under Jal Jivan Mission of raghunathganj-I Block, Murshidabad District under Jangipur | 51.01 | 422-MSD/2024-25 | 27/09/2024 | VCH/000593/2024-2025 |
158 | Murshidabad Division | BILL/01122/2024-2025 | 23/09/2024 | IMRAN CONSTRUCTION | ORD/000814/2022-2023 | 672/MURD | 09/03/2023 | Formal work order for Augmentation of PANCHTHUPI ZONE-II PWSS to accommodate FHTC , under Jal Jeevan Mission, Block- BURWAN of Kandi Sub-Division, Murshidabad District under Murshidabad Division, PHE.Dte. | 105.74 | 420-MSD/2024-25 | 27/09/2024 | VCH/000607/2024-2025 |
159 | Murshidabad Division | BILL/01231/2024-2025 | 30/09/2024 | EXECUTIVE ENGINEER , MURSHIDABAD HIGHWAY DIVISION -I, PWD (ROADS) DIRECT. GOV OF W.B | null | 493/ISD | 30/09/2024 | Restoretion of Road State Highway at Najairpur to Islampore Road from chainge 0.00 kmp to 1.350 km shoulder damage amounting to Rs 637462.00 and Akheriganj to Katlamari road from chainge 8.00 km to 9.30 km. | 34.80 | 492-MSD/2024-25 | 04/10/2024 | VCH/000596/2024-2025 |
160 | Murshidabad Division | BILL/01236/2024-2025 | 01/10/2024 | NOVELTY CONSTRUCTION | ORD/000793/2022-2023 | 593/MURD | 01/03/2023 | Formal work order for construction of Pump House at Head Work Site & 2nd Tube well site ,FHTC, Boundwary Wall, Rising Main Connection, Laying Distribution System for BATHUR PWSS in Khargram Block under Murshidabad Division ,PHE.Dte [ (i)Amount for LDS | 31.16 | 520-MSD/2024-25 | 06/10/2024 | VCH/000701/2024-2025 |
161 | Murshidabad Division | BILL/01245/2024-2025 | 01/10/2024 | M/S. MOHAN LAL JAIN | ORD/000366/2023-2024 | 2724/MURD | 29/08/2023 | Augmentation of NATIAL RAJANAGAR ZONE-I ,II,& III Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Raninagar -II Block of Murshidabad District under Murshidabad Division, PHE. Dte. | 48.51 | 521-MSD/2024-25 | 06/10/2024 | VCH/000702/2024-2025 |
162 | Murshidabad Division | BILL/01250/2024-2025 | 01/10/2024 | M.R. ENTERPRISE (MD. HASANUZZAMAN) | ORD/000027/2024-2025 | 1842/MURD | 25/06/2024 | Allied work in connection with Augmentation & Rejuvenation of Birendranagar (Zone-II) Pipe water supply scheme, Block- Raghunathganj-II, District-Murshidabad, Under Murshidabad Division P.H.E Dte. | 14.46 | 506-MSD/2024-25 | 04/10/2024 | VCH/000687/2024-2025 |
163 | Murshidabad Division | BILL/01254/2024-2025 | 01/10/2024 | M/S. SINHA & SONS | ORD/000859/2022-2023 | 793/MURD | 21/03/2023 | Formal work order for Construction of 300 Cum OHR, Laying Distribution System (PART-A), Rising Main, FHTC, for Uncovered of UDAY CHANDPUR PWSS in Kandi Block , Kandi Sub-Division under Murshidabad Division ,PHE.Dte. | 42.49 | 511-MSD/2024-25 | 04/10/2024 | VCH/000692/2024-2025 |
164 | Murshidabad Division | BILL/01441/2024-2025 | 22/10/2024 | KAMIRUL SK AND CO. (PART: KAMIRUL SK. & OTHERS) | ORD/000095/2023-2024 | 1692/MURD | 28/06/2023 | BADDA PWSS under Jal Jivan Mission of BURWAN Block, Kandi Subdivision , Murshidabad District under Murshidabad Division, PHE.Dte. (Part B) | 21.15 | 548-MSD/2024-25 | 28/10/2024 | VCH/000730/2024-2025 |
165 | Murshidabad Division | BILL/01461/2024-2025 | 25/10/2024 | M/S SUBHAJIT BISWAS | ORD/000653/2022-2023 | 3403/MURD | 22/12/2022 | Sinking of 02(Two) Nos 250mm x 150 mm dia tube well 100.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at BUNDAI PWSS at Head Work Site & 2nd Tube Well Site in Kandi Block under Kandi Sub-Division, Mursh | 7.86 | 557-MSD/2024-25 | 30/10/2024 | VCH/000854/2024-2025 |
166 | Murshidabad Division | BILL/01470/2024-2025 | 28/10/2024 | M/S B.M. INDUSTRIES | ORD/000355/2023-2024 | 2669/MURD | 24/08/2023 | Augmentation of Ground Water Based Islampur PWSS of accommodate Providing Functional Household Tap Connection (1394 Nos) in Raninagar - I Block within Murshidabad District under Murshidabad Division, PHE Dte.PART_C | 36.65 | 564-MSD/2024-25 | 27/11/2024 | VCH/001086/2024-2025 |
167 | Murshidabad Division | BILL/01473/2024-2025 | 29/10/2024 | M/S AFSHAN CONSTRUCTION | ORD/000391/2023-2024 | 2771/MURD | 01/09/2023 | Laying of Rising main , Distribution System, FHTC, construction of OHR (Capacity 100 cum), Repairing of existing OHR, Sinking of Tube Well , Repairing of pump house and Boundary wall and approach road for Augmentation of Jotsundar PWSS in Raghuna | 35.37 | 563-MSD/2024-25 | 27/11/2024 | VCH/001085/2024-2025 |
168 | Murshidabad Division | BILL/01475/2024-2025 | 29/10/2024 | HARIPUR DR. AMBEDKAR JANASEBA MISSION | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for bonus of Lab personnel for the period 01/09/2024 to 30/09/2024 and festival bonus for the period 2024-2025. | 0.63 | 560-MSD/2024-25 | 30/10/2024 | VCH/000726/2024-2025 |
169 | Murshidabad Division | BILL/00267/2024-2025 | 20/06/2024 | DEBIPROSAD DE (PROP:- SOMNATH DEY) | ORD/002045/2021-2022 | 64/BSD | 24/02/2022 | Construction of Boundary wall (North Side) at SUNAI Water Supply Scheme under Berhampore Sub-Division, P.H.E. Dte. in the District Murshidabad. | 4.36 | 231-MSD/2024-25 | 18/07/2024 | VCH/000322/2024-2025 |
170 | Murshidabad Division | BILL/00295/2024-2025 | 24/06/2024 | FARAKKA BEEDI SHRAMIK KALYAN SAMITY | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the period 01/05/2024 to 31/05/2024 | 0.45 | 208-MSD/2024-25 | 02/07/2024 | VCH/000253/2024-2025 |
171 | Murshidabad Division | BILL/00355/2024-2025 | 02/07/2024 | PRATICHI ENTERPRISE | ORD/000882/2022-2023 | 906/MURD | 22/03/2023 | Providing FHTC Connection to 176 nos household ,Construction of 200 Cum OHR, Rising Main , for Augmentation work of GHORAMARA PWSS in NAWDA Block under Murshidabad Division , PHE.Dte. (part_A) | 46.12 | 241-MSD/2024-25 | 18/07/2024 | VCH/000334/2024-2025 |
172 | Murshidabad Division | BILL/00362/2024-2025 | 02/07/2024 | CHAKRABORTY CONSTRUCTION | ORD/000206/2023-2024 | 2290/MURD | 01/08/2023 | UMARPUR PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jeevan Mission, Block- Suti-II of Jangipur Sub-Division, Murshidabad District under Murshidabad Di | 94.82 | 222-MSD/2024-25 | 18/07/2024 | VCH/000314/2024-2025 |
173 | Murshidabad Division | BILL/00369/2024-2025 | 05/07/2024 | DHIRENDRANATH MONDAL | ORD/000855/2022-2023 | 794/MURD | 21/03/2023 | Formal work order for GHORSALA PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room , Laying Distribution System, Rising Main, boundary wall and service road , under Jal Jivan Mission of raghunathganj-I Block, Murshidabad District under Jangipur | 55.73 | 230-MSD/2024-25 | 18/07/2024 | VCH/000321/2024-2025 |
174 | Murshidabad Division | BILL/00817/2024-2025 | 22/08/2024 | MAMATA USHA ENTERPRISE | ORD/000813/2022-2023 | 671/MURD | 09/03/2023 | Formal work order for Augmentation of JALANGI ZONE-III Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Jalangi Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 228.55 | 309-MSD/2024-25 | 05/09/2024 | VCH/000504/2024-2025 |
175 | Murshidabad Division | BILL/00827/2024-2025 | 23/08/2024 | J.S. CONSTRUCTION | ORD/000607/2022-2023 | 3151/MURD | 28/11/2022 | Formal work order for construction of 1000 M3 Capacity, 20mtr. staging height RCC Elevated Service Reservoir as per Departmental type design (Ref :- DRG.No. PC/-I/OHR/17/2012) including delivery, Inlet, Washout & Overflow pipe connection etc. all complete | 45.54 | 338-MSD/2024-25 | 03/09/2024 | VCH/000373/2024-2025 |
176 | Murshidabad Division | BILL/00861/2024-2025 | 27/08/2024 | M/S SAJAHAN CHOWDHURY | ORD/000231/2023-2024 | 2342/MURD | 03/08/2023 | Ground Water based piped water supply scheme for Kharsa Part- C village, Block:- Khargram, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 12.67 | 348-MSD/2024-25 | 06/09/2024 | VCH/000516/2024-2025 |
177 | Murshidabad Division | BILL/00862/2024-2025 | 27/08/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000692/2022-2023 | 164/MURD | 17/01/2023 | Formal work order for the work of PUNIA & adjoining moujas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jevan Mission of Murshid | 122.71 | 328-MSD/2024-25 | 30/08/2024 | VCH/000477/2024-2025 |
178 | Murshidabad Division | BILL/00869/2024-2025 | 28/08/2024 | RURAL NATIONAL CLUB | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the month of July 2024 | 0.45 | 330-MSD/2024-25 | 30/08/2024 | VCH/000412/2024-2025 |
179 | Murshidabad Division | BILL/00871/2024-2025 | 28/08/2024 | HARIPUR DR. AMBEDKAR JANASEBA MISSION | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the period | 0.80 | 332-MSD/2024-25 | 30/08/2024 | VCH/000414/2024-2025 |
180 | Murshidabad Division | BILL/00872/2024-2025 | 28/08/2024 | COMMUNITY POLITECHNIC SCHEME, MIT | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the month of April 2024 to July 2024. | 2.20 | 333-MSD/2024-25 | 30/08/2024 | VCH/000415/2024-2025 |
181 | Murshidabad Division | BILL/00969/2024-2025 | 03/09/2024 | SOUMYADIP MISRA | ORD/000900/2022-2023 | 330/MURD | 07/02/2023 | Hiring of Maxicab (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel / LPG / CNG Engine) in perfect good running condition of performing a very long journey and should be covered anywhere without any trouble on Daily hire basis for of | 0.21 | 342-MSD/2024-25 | 06/09/2024 | VCH/000495/2024-2025 |
182 | Murshidabad Division | BILL/01160/2024-2025 | 26/09/2024 | DIPAYAN DEY | ORD/000804/2022-2023 | 623/MURD | 03/03/2023 | Formal work order for DAKSHIN RAYPUR & adjoining mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jeevan Mission of BURWAN Bl | 73.77 | 453-MSD/2024-25 | 02/10/2024 | VCH/000639/2024-2025 |
183 | Murshidabad Division | BILL/01035/2023-2024 | 09/01/2024 | BHARATI CHEMICAL & SCIENTIFIC WORKS | ORD/000103/2020-2021 | 2625/MURD | 08/10/2020 | Continuation work order for Engagement of Resource Person & Sampling Assistant at the Laboratory Site to Operate AAS Spectrophotometer System for a Period of One Year under Murshidabad Division, PHE Dte. in the district of Murshidabad. (Period from 15/10/ | 4.54 | 281-MSD/2024-25 | 12/08/2024 | VCH/001278/2023-2024 |
184 | Murshidabad Division | BILL/01048/2024-2025 | 09/09/2024 | BISWAS ENGINEERING & WATER TESTING. | ORD/000856/2023-2024 | 610/MURD | 27/02/2024 | Continuation work order for Engagement of 02(Two) nos. Chemist (01 no. Mahyampur WTP Laboratory and 01no. Jangipur WTP Sub-District Laboratory) , 02(Two)nos.Bacteriologist(01 no. Mahyampur WTP Laboratory and 01no. Jangipur WTP Sub-District Laboratory) a | 3.38 | 378-MSD/2024-25 | 11/09/2024 | VCH/000459/2024-2025 |
185 | Murshidabad Division | BILL/01089/2024-2025 | 18/09/2024 | RURAL NATIONAL CLUB | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of lab personnel for the month of August 2024. | 0.45 | 397-MSD/2024-25 | 20/09/2024 | VCH/000537/2024-2025 |
186 | Murshidabad Division | BILL/01146/2024-2025 | 24/09/2024 | M/S. SARKAR CONSTRUCTION | ORD/000758/2023-2024 | 140/MURD | 16/01/2024 | Construction of Ground Water Based Paschim Char Majhardiar PWSS of accommodate FHTC(2246 Nos), Laying Distribution System, Laying Rising Main,Over Head Reservoir ( 500 CUM Capacity), Switch Room, Boundary Wall in Raninagar - II Block within Murshidabad | 41.51 | 434-MSD/2024-25 | 02/10/2024 | VCH/000613/2024-2025 |
187 | Murshidabad Division | BILL/01300/2024-2025 | 04/10/2024 | RURAL NATIONAL CLUB | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the month of September 2024 and festival bonus for the period 2024-2025. | 0.63 | 538-MSD/2024-25 | 06/10/2024 | VCH/000600/2024-2025 |
188 | Murshidabad Division | BILL/01203/2024-2025 | 28/09/2024 | KHOKAN BISWAS | ORD/000719/2023-2024 | 3863/MURD | 15/12/2023 | Sinking of 03 (Three) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Lokenathpur Zone -I Water Supply Scheme at Head Work Site, 2nd Site si | 13.77 | 477-MSD/2024-25 | 02/10/2024 | VCH/000665/2024-2025 |
189 | Murshidabad Division | BILL/01222/2024-2025 | 30/09/2024 | HARUN ALL RASHID & BROTHERS | ORD/000701/2023-2024 | 3769/MURD | 08/12/2023 | Sinking of 03 (Three) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at BEWA -II Water Supply Scheme at Head Work Site, 2nd Site,3 r d site | 17.77 | 526-MSD/2024-25 | 06/10/2024 | VCH/000707/2024-2025 |
190 | Murshidabad Division | BILL/01531/2024-2025 | 12/11/2024 | FARAKKA BEEDI SHRAMIK KALYAN SAMITY | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab personnel for the period 01/10/2024 to 31/10/2024. | 0.80 | 572-MSD/2024-25 | 25/11/2024 | VCH/001014/2024-2025 |
191 | Murshidabad Division | BILL/01580/2024-2025 | 03/12/2024 | RURAL NATIONAL CLUB | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the month of November 2024 | 0.45 | 581-MSD/2024-25 | 06/12/2024 | VCH/001087/2024-2025 |
192 | Murshidabad Division | BILL/00313/2024-2025 | 24/06/2024 | PRIYANKA CONSTRUCTION | ORD/000836/2022-2023 | 833/MURD | 23/03/2023 | Formal work order for RAMNA BARAKHARI & adjoining moujas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jivan Mission, Block- BHARA | 91.76 | 192-MSD/2024-25 | 01/07/2024 | VCH/000260/2024-2025 |
193 | Murshidabad Division | BILL/00318/2024-2025 | 25/06/2024 | KAMRULA CONSTRUCTION CO. | ORD/000661/2020-2021 | 3114/MURD | 09/12/2020 | Formal Work Order for Construction of 400 CUM capacity 20.00 mtr staging height RCC elevated Over Head Reservoir on raft foundation as per drawing & design reference-PC-I/OHR/11/2012) including supply, delivery and errecting inlet and overflow pipe conne | 63.36 | 248-MSD/2024-25 | 25/07/2024 | VCH/000341/2024-2025 |
194 | Murshidabad Division | BILL/00332/2024-2025 | 27/06/2024 | M/S. S. DAS AND ENTERPRISE | ORD/000268/2023-2024 | 2573/MURD | 18/08/2023 | Laying Distribution System PART-B and FHTC at Vill-KHARGRAM (Village Code-315195) & Vill-DURGAPUR (Village Code-315167) for Augmentation of KHARGRAM PWSS in Khargram Block, under Murshidabad Division ,PHE. Dte Part-B | 34.82 | 184-MSD/2024-25 | 01/07/2024 | VCH/000257/2024-2025 |
195 | Murshidabad Division | BILL/00527/2024-2025 | 30/07/2024 | S. ENTERPRISE (PROP: SAIRUL ISLAM) | ORD/000880/2022-2023 | 904/MURD | 29/03/2023 | Providing FHTC Connection to 800 nos household, Laying of Rising Main, Laying of Distribution System, Overhauling of RCC 180 Cum OHR, Construction Pump House with sanitary and Water Supply Arrangement (T/W-I), Special repair and renovation of existing 1 | 35.35 | 251-MSD/2024-25 | 06/08/2024 | VCH/000418/2024-2025 |
196 | Murshidabad Division | BILL/00530/2024-2025 | 30/07/2024 | M/S. UNI TRADERS | ORD/000350/2023-2024 | 2672/MURD | 24/08/2023 | Construction of 250 Cum OHR, Pump House, Boundary wall & Repairing of Pump House for Augmentation of Herampur Zone-I PWSS in Raninagar-I Block , Islampur Sub-Division under Murshidabad Division ,PHE.Dte. | 26.43 | 259-MSD/2024-25 | 06/08/2024 | VCH/000424/2024-2025 |
197 | Murshidabad Division | BILL/00532/2024-2025 | 30/07/2024 | SUGATA CHOWDHURY | ORD/000660/2023-2024 | 3545/MURD | 17/11/2023 | Allied work for laying of 110 mm dia upvc pipeline at Minister para-area in connection with " Retrofitting providing FHTC in connection with JJM under command area of village of Lalgola (village code-314224) under Lalgola Ground Water Based Water Supply S | 1.83 | 261-MSD/2024-25 | 20/08/2024 | VCH/000426/2024-2025 |
198 | Murshidabad Division | BILL/00540/2024-2025 | 30/07/2024 | HARIPUR DR. AMBEDKAR JANASEBA MISSION | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the Period 01/06/2024 to 30/06/2024 | 0.45 | 279-MSD/2024-25 | 12/08/2024 | VCH/000349/2024-2025 |
199 | Murshidabad Division | BILL/00607/2024-2025 | 01/08/2024 | SARKAR WATER SUPPLY AGENCY | ORD/000033/2023-2024 | 1108/MURD | 24/04/2023 | Sinking of 01 (One) No. of 300 mm x 200 mm dia tube well i.e. TW-III of 90.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Bhalkundi Zone-III & adjoining mouzas Water Supply Scheme at 3rd work site at K h | 9.69 | 277-MSD/2024-25 | 20/08/2024 | VCH/000442/2024-2025 |
200 | Murshidabad Division | BILL/00609/2024-2025 | 01/08/2024 | NADIA TUBEWELLS | ORD/000628/2023-2024 | 3424/MURD | 02/11/2023 | Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at GAYESPUR AND ADJOINING MOUJAS Water Supply Scheme at Head Work Site, 2nd Site s | 15.04 | 275-MSD/2024-25 | 20/08/2024 | VCH/000440/2024-2025 |
201 | Murshidabad Division | BILL/00937/2024-2025 | 02/09/2024 | SOFIQUL ISLAM | ORD/000850/2022-2023 | 780/MURD | 20/03/2023 | Formal work order for KALGRAM & adjoining moujas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jevan Mission of KHARGRAM Block of | 44.37 | 355-MSD/2024-25 | 06/09/2024 | VCH/000522/2024-2025 |
202 | Murshidabad Division | BILL/01018/2024-2025 | 06/09/2024 | DHIRENDRANATH MONDAL | ORD/000202/2023-2024 | 2059/MURD | 27/07/2023 | GAYSABAD (Part-A) & adjoining mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Rising Main, FHTC work, boundary wall and service road, under Jal Jeevan Mission of Murshidabad District under Murshidabad Division, | 66.69 | 367-MSD/2024-20 | 12/09/2024 | VCH/000484/2024-2025 |
203 | Murshidabad Division | BILL/01111/2024-2025 | 23/09/2024 | M/S NIRAPADA BHATTACHARJEE | ORD/000282/2023-2024 | 2643/MURD | 23/08/2023 | Augmentation of Ground Water Based JOT KAMAL (ZONE-I), JOTKAMAL (Zone-II) & JOTKAMAL (Zone-III) PWSS, Block- RAGHUNATHGANJ-II, District-Murshidabad, Under Murshidabad Division, P.H.Engineering Dte. | 107.41 | 425-MSD/2024-25 | 27/09/2024 | VCH/000534/2024-2025 |
204 | Murshidabad Division | BILL/01112/2024-2025 | 23/09/2024 | R.K. DRILLING SERVICES | ORD/000133/2023-2024 | 1769/MURD | 06/07/2023 | Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II, of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Jaykrishnapur Zone- I & Hilora Zone-II Water Supply Scheme under Murshidabad | 18.18 | 428-MSD/2024-25 | 02/10/2024 | VCH/000591/2024-2025 |
205 | Murshidabad Division | BILL/01117/2024-2025 | 23/09/2024 | SANJAY BISWAS | ORD/000891/2021-2022 | 3321/MURD | 07/10/2021 | Formal work order for Water Supply arrangement for arsenic affected habitation with SOLAR Power connection by Construction/ installation of Community Purification Plant (CPP) unit including Tubewell (125 x 50 mm dia ) with Submersible pump (for Population | 16.09 | 426-MSD/2024-25 | 02/10/2024 | VCH/000589/2024-2025 |
206 | Murshidabad Division | BILL/01131/2024-2025 | 24/09/2024 | MANDAL CONSTRUCTION AND CO. | ORD/000735/2022-2023 | 376/MURD | 10/02/2023 | Formal work order for the work of NAPARA PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jevan Mission, Samserganj Block of Murshidabad District under Jangip | 69.51 | 437-MSD/2024-25 | 02/10/2024 | VCH/000616/2024-2025 |
207 | Murshidabad Division | BILL/01228/2024-2025 | 30/09/2024 | SK CONSTRUCTION (NAJIR SK.) | ORD/000742/2023-2024 | 50/MURD | 05/01/2024 | Allied works for Laying of U.P.V.C Pipeline of 160 mm,125 mm & 90 mm dia at Head work site of Arjunpur Water Supply Scheme of Jangipur Sub Division under Murshidabad Division, P.H.E.Dte. in the district of Murshidabad. | 5.70 | 507-MSD/2024-25 | 04/10/2024 | VCH/000688/2024-2025 |
208 | Murshidabad Division | BILL/01253/2024-2025 | 01/10/2024 | HASSAN CONSTRUCTION | ORD/000090/2024-2025 | 52/JSD | 16/07/2024 | Hiring of Maxicab (Non-Air Condition, Bharat stage-III on or after 01/05/2008 with Diesel/L.P.G/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on monthly hire basis for official us | 0.40 | 535-MSD/2024-25 | 06/10/2024 | VCH/000717/2024-2025 |
209 | Murshidabad Division | BILL/01465/2024-2025 | 24/10/2024 | M/S RUBIET HOSSAIN | ORD/000306/2018-2019 | 2346/MURD | 15/11/2018 | Planning, Design, Investigation, Construction, Erection, Installation, Completion, testing and Commissioning in all respect of entire units of Arsenic cum Iron Removal Plant(AIRP) of different capacities capable of removing arsenic & Iron Present in Groun | 47.50 | 568-MSD/2024-25 | 28/11/2024 | VCH/001094/2024-2025 |
210 | Murshidabad Division | BILL/00270/2024-2025 | 20/06/2024 | DEBIPROSAD DE (PROP:- SOMNATH DEY) | ORD/001213/2021-2022 | 63/BSD | 24/02/2022 | Construction of Boundary wall (Fornt Side) at SUNAI Water Supply Scheme under Berhampore Sub-Division, P.H.E. Dte. in the District Murshidabad. | 4.23 | 231-MSD/2024-25 | 18/07/2024 | VCH/000323/2024-2025 |
211 | Murshidabad Division | BILL/00347/2024-2025 | 01/07/2024 | S.S. ENTERPRISE | ORD/000077/2023-2024 | 1380/MURD | 22/05/2023 | Augmentation of KUPILA PWSS under Jal Jivan Mission of DOMKAL Block, ISLAMPUR Subdivision , Murshidabad District under Murshidabad Division, PHE.Dte. | 53.01 | 245-MSD/2024-25 | 18/07/2024 | VCH/000338/2024-2025 |
212 | Murshidabad Division | BILL/00370/2024-2025 | 05/07/2024 | BISWAS CONSTRUCTION (GOLAM MURTAJA, BABLABONA AAIFB7956Q) | ORD/000800/2022-2023 | 608/MURD | 02/03/2023 | Formal work order for Augmentation of P T Rasulpur (Part - B) Piped Water Supply Scheme under Jal Jevan Mission of DOMKAL Block in the District Murshidabad District under Murshidabad Division, PHE.Dte. | 24.44 | 225-MSD/2024-25 | 18/07/2024 | VCH/000317/2024-2025 |
213 | Murshidabad Division | BILL/00371/2024-2025 | 05/07/2024 | MAMATA USHA ENTERPRISE | ORD/000761/2023-2024 | 183/MURD | 18/01/2024 | Allied work of OHR & HDPE Pipeline for Augmentation of Jalangi Zone-II Part-A ground water based PWSS to accommodate FHTC in Jalangi Block in the district of Murshidabad under Murshidabad Division P.H.E. Dte. | 74.93 | 234-MSD/2024-25 | 18/07/2024 | VCH/000327/2024-2025 |
214 | Murshidabad Division | BILL/00811/2024-2025 | 21/08/2024 | APURBA SAHA CHOWDHURY | ORD/000197/2023-2024 | 1998/MURD | 21/07/2023 | Prooviding FHTC Connection to 835 nos household, Laying of Rising Main, Laying of Distribution System, Overhauling of RCC 100 Cum OHR, , construction Pump House with sanitary and Water Supply Arrangement (T/W-I) , Special repair and renovation of existi | 45.51 | 313-MSD/2024-25 | 05/09/2024 | VCH/000505/2024-2025 |
215 | Murshidabad Division | BILL/00812/2024-2025 | 21/08/2024 | M/S ROY & BOSE ENTERPRISE | ORD/000529/2023-2024 | 3135/MURD | 06/10/2023 | Ground Water based mini piped water supply scheme for Kalidaspur village, Block:- Khargram, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 13.37 | 315-MSD/2024-25 | 30/08/2024 | VCH/000469/2024-2025 |
216 | Murshidabad Division | BILL/00816/2024-2025 | 22/08/2024 | PRIYANKA CONSTRUCTION | ORD/000481/2023-2024 | 3052/MURD | 29/09/2023 | Laying of Distribution System (Part-B) and FHTC work at Mahalandi Village (Village Code-315231) & Durlabhpur Village (Village Code-315218) for Augmentation of MAHALANDI (ZONE-I) Water Supply Scheme in Kandi Block under Murshidabad Division, P.H.E.Dte. | 36.37 | 312-MSD/2024-25 | 30/08/2024 | VCH/000467/2024-2025 |
217 | Murshidabad Division | BILL/00966/2024-2025 | 03/09/2024 | SOUMYADIP MISRA | ORD/000900/2022-2023 | 330/MURD | 07/02/2023 | Hiring of Maxicab (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel / LPG / CNG Engine) in perfect good running condition of performing a very long journey and should be covered anywhere without any trouble on Daily hire basis for of | 0.16 | 342-MSD/2024-25 | 06/09/2024 | VCH/000493/2024-2025 |
218 | Murshidabad Division | BILL/01481/2024-2025 | 29/10/2024 | M/S BAPPA ENTERPRISE | ORD/000662/2023-2024 | 3560/MURD | 21/11/2023 | Renovation of Existing IEP (Capacity 58 Cu.M/hr) for changing of 01 No Iron Removal Filter media unit of (3.30 m dia x 1.50 M HOS) & 01 No Oxidation Chember of (1.00 M dia x 1.00 M HOS) and painting all vessel, pipes etc. all complete for Augumentation of | 3.94 | 567-MSD/2024-25 | 25/11/2024 | VCH/001093/2024-2025 |
219 | Murshidabad Division | BILL/01163/2024-2025 | 26/09/2024 | NADIA TUBEWELLS | ORD/000109/2023-2024 | 1751/MURD | 06/07/2023 | Sinking of 03 (Three) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Tenya Zone - II Water Supply Scheme and Kurulia Water Supply Scheme und | 13.59 | 472-MSD/2024-25 | 02/10/2024 | VCH/000660/2024-2025 |
220 | Murshidabad Division | BILL/01169/2024-2025 | 26/09/2024 | DHIRENDRANATH MONDAL | ORD/000537/2023-2024 | 3146/MURD | 09/10/2023 | Augmentation of DAKSHIN KHANDA (ZONE - IA) PWSS under Jal Jeevan Mission of Bharatpur-II Block, Kandi Sub division , Murshidabad District under Murshidabad Division, PHE.Dte. | 46.87 | 471-MSD/2024-25 | 02/10/2024 | VCH/000659/2024-2025 |
221 | Murshidabad Division | BILL/01181/2024-2025 | 27/09/2024 | MAHMOOD ASSOCIATES PRIVATE LIMITED | ORD/000055/2023-2024 | 1311/MURD | 11/05/2023 | Augmentation of Domkal Zone-II (Part-A) Ground Water Based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Domkal Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 179.91 | 468-MSD/2024-25 | 02/10/2024 | VCH/000656/2024-2025 |
222 | Murshidabad Division | BILL/01064/2024-2025 | 12/09/2024 | ACQUA CONSTRACTION CONSORTIAM | ORD/000713/2022-2023 | 92/MURD | 11/01/2023 | Formal work order for the work of KUMAR SANDA & Adjoining Mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room , Laying Distribution System, Rising Main, boundary wall and service road , under Jal Swapna of Murshi | 22.02 | 382-MSD/2024-25 | 19/09/2024 | VCH/000549/2024-2025 |
223 | Murshidabad Division | BILL/01071/2024-2025 | 12/09/2024 | PARTHA PRATIM DAS | ORD/000892/2022-2023 | 929/MURD | 31/03/2023 | Laying Distribution System , Rising Main Connection FHTC, Construction of Pump House & Boundary Wall for Basantapur water supply scheme of Khargram Block under Murshidabad Division, PHE Dte. | 13.92 | 389-MSD/2024-25 | 19/09/2024 | VCH/000560/2024-2025 |
224 | Murshidabad Division | BILL/01140/2024-2025 | 24/09/2024 | MAMATA USHA ENTERPRISE | ORD/000104/2023-2024 | 1746/MURD | 06/07/2023 | Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Dhulauri Water Supply Scheme and Tejsinghapur Water Supply Schem under Murshid | 20.97 | 443-MSD/2024-25 | 02/10/2024 | VCH/000622/2024-2025 |
225 | Murshidabad Division | BILL/01142/2024-2025 | 24/09/2024 | JD ENGINEERING | null | GO2223013663PH | 09/02/2023 | PURCHASE OF 7 NOS CONMPUTER SET FOR LABORATORY UNDER MSD DIVISION. INVOICE NO- JDE/24-25/46 | 4.79 | 450-MSD/2024-25 | 02/10/2024 | VCH/000860/2024-2025 |
226 | Murshidabad Division | BILL/01147/2024-2025 | 24/09/2024 | M/S. BIMALENDU BOSE | ORD/000247/2023-2024 | 2468/MURD | 09/08/2023 | Providing FHTC Connection to 818 nos. household , Construction of 300 Cum OHR, Laying of Distribution System, Rising Main , repairing & Overhauling of R.C.C. elevated reservoir 200 Cum capacity of staging height 20 mtr. Repairing & Vertical Extention | 78.80 | 432-MSD/2024-25 | 02/10/2024 | VCH/000611/2024-2025 |
227 | Murshidabad Division | BILL/01283/2024-2025 | 03/10/2024 | M/S. TAPAS KUMAR CHAKRABORTY | ORD/000542/2022-2023 | 2716/MURD | 26/09/2022 | Formal work order for Laying of Distribution system,Rising Main, Sub-soil Investigation and construction of OHR (300 cum) and construction of Boundary wall and repairing of Pump-House in connection wih Augmentation of Godhanpara Zone-I water supply scheme | 43.39 | 530-MSD/2024-25 | 06/10/2024 | VCH/000711/2024-2025 |
228 | Murshidabad Division | BILL/01200/2024-2025 | 28/09/2024 | INDRAJIT MAZUMDAR | ORD/000392/2023-2024 | 2794/MURD | 04/09/2023 | Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at BADDA AND IT'S ADJOINING MOUJAS Water Supply Scheme at Head Work Site, 2nd Sit | 15.55 | 486-MSD/2024-25 | 02/10/2024 | VCH/000587/2024-2025 |
229 | Murshidabad Division | BILL/01218/2024-2025 | 30/09/2024 | M/S. GOUTAM CHAKRABORTY | ORD/000658/2023-2024 | 3516/MURD | 09/11/2023 | Laying of Rising main , Distribution System, FHTC, construction of OHR (Capacity 400 cum), Repairing of existing OHR, Sinking of Tube Well , Repairing of pump house and boundary wall, and Construction of Pump house cum chlorine Room , Boundary wall and ap | 89.85 | 501-MSD/2024-25 | 04/10/2024 | VCH/000683/2024-2025 |
230 | Murshidabad Division | BILL/00306/2024-2025 | 24/06/2024 | MUKTI ENTERPRISE | ORD/000259/2023-2024 | 2495/MURD | 11/08/2023 | Ground Water based piped water supply scheme for Hazipur Part- A village, Block:- Suti-II, Jangipur Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 16.92 | 198-MSD/2024-25 | 02/07/2024 | VCH/000264/2024-2025 |
231 | Murshidabad Division | BILL/00308/2024-2025 | 24/06/2024 | TAPAN DAS | ORD/000615/2023-2024 | 3387/MURD | 01/11/2023 | Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at NEZAMPUR Water Supply Scheme at Head Work Site, 2nd Site site at Suti - II Bloc | 14.94 | 195-MSD/2024-25 | 02/07/2024 | VCH/000261/2024-2025 |
232 | Murshidabad Division | BILL/00541/2024-2025 | 30/07/2024 | RURAL NATIONAL CLUB | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the month of June 2024 & 2nd installment of lab management expenses in advance for the year 2024. | 0.80 | 280-MSD/2024-25 | 12/08/2024 | VCH/000347/2024-2025 |
233 | Murshidabad Division | BILL/00685/2024-2025 | 07/08/2024 | CHAKRABORTY CONSTRUCTION | ORD/000764/2020-2021 | 45/MURD | 06/01/2021 | Formal work order for Retrofitting Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission and Jal Swapna under command area of village Saktipur ( Village Code -315633) under Saktipur Ground Water Based Water Supply Scheme for | 56.60 | 296-MSD/2024-25 | 20/08/2024 | VCH/000453/2024-2025 |
234 | Murshidabad Division | BILL/00799/2024-2025 | 21/08/2024 | ABDUL JABBAR DEWAN | ORD/000798/2022-2023 | 607/MURD | 02/03/2023 | Formal work order for GOURI NAGAR & adjoining mouzas PWSS to accommodate FHTC under Jal Jiban Mission, Block- BURWAN of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE. Dte. | 33.98 | 323-MSD/2024-25 | 05/09/2024 | VCH/000507/2024-2025 |
235 | Murshidabad Division | BILL/00888/2024-2025 | 28/08/2024 | DHIRENDRANATH MONDAL | ORD/000733/2023-2024 | 54/MURD | 05/01/2024 | Additional & Balance Work Laying of Distribution System , Land Devolapement of SALINDA PWSS in Bharatpur-II Block , Kandi Sub-Division under Murshidabad Division ,PHE.Dte. | 13.15 | 351-MSD/2024-25 | 06/09/2024 | VCH/000458/2024-2025 |
236 | Murshidabad Division | BILL/00984/2024-2025 | 04/09/2024 | PRANAB KUMAR GHOSH | ORD/000622/2023-2024 | 3398/MURD | 01/11/2023 | Providing Functional Household Tap Connections (FHTC) (1676 Nos) in connection with (Jal Jeevan Mission ) and under command area of village of Godhanpara ( Village Code -314581) under Godhanpara Ground Water Based Water Supply Scheme for Arsenic Af | 51.39 | 356-MSD/2024-25 | 11/09/2024 | VCH/000523/2024-2025 |
237 | Murshidabad Division | BILL/00986/2024-2025 | 04/09/2024 | BISWAS CONSTRUCTION (GOLAM MURTAJA, BABLABONA AAIFB7956Q) | ORD/000800/2022-2023 | 608/MURD | 02/03/2023 | Formal work order for Augmentation of P T Rasulpur (Part - B) Piped Water Supply Scheme under Jal Jevan Mission of DOMKAL Block in the District Murshidabad District under Murshidabad Division, PHE.Dte. | 19.51 | 357-MSD/2024-25 | 11/09/2024 | VCH/000524/2024-2025 |
238 | Murshidabad Division | BILL/00989/2024-2025 | 04/09/2024 | M/S. S. DAS AND ENTERPRISE | ORD/000223/2023-2024 | 2367/MURD | 04/08/2023 | KURULIA PWSS under Jal Jeevan Mission of BURWAN Block, Kandi Sub division , Murshidabad District under Murshidabad Division, PHE. Dte. (Part-A) | 415.30 | 539-MSD/2024-25 | 06/10/2024 | VCH/000718/2024-2025 |
239 | Murshidabad Division | BILL/01019/2024-2025 | 06/09/2024 | MURSHIDABAD HIGHWAY DIVISION-1 | null | 9-398/545 | 02/07/2024 | COST OF RESTORATION OF ROAD CONNECTTED TO NH-34 DHULIAN PAKUR ROAD AT CH. 4.275 TO 4.600. | 13.30 | 369-MSD/2024-20 | 12/09/2024 | VCH/000487/2024-2025 |
240 | Murshidabad Division | BILL/01027/2024-2025 | 09/09/2024 | HASSAN CONSTRUCTION | ORD/000090/2024-2025 | 52/JSD | 16/07/2024 | Hiring of Maxicab (Non-Air Condition, Bharat stage-III on or after 01/05/2008 with Diesel/L.P.G/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on monthly hire basis for official us | 0.40 | 394-MSD/2024-25 | 20/09/2024 | VCH/000533/2024-2025 |
241 | Murshidabad Division | BILL/01029/2024-2025 | 09/09/2024 | M/S JATIN | ORD/000597/2023-2024 | 3344/MURD | 28/10/2023 | Construction of 600 Cum OHR, Boundary Wall (H.W, 2nd & 3rd Site), Pump House (H.W, 2nd & 3rd Site), Land Development (H.W, 2nd & 3rd Site) and office cum godown of HIZOLE (Zone- II) & its adjoining mouzas water supply scheme of Kandi Block under Murshid | 32.18 | 375-MSD/2024-25 | 12/09/2024 | VCH/000543/2024-2025 |
242 | Murshidabad Division | BILL/01091/2024-2025 | 18/09/2024 | HARIPUR DR. AMBEDKAR JANASEBA MISSION | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the period 01/08/2024 to 31/08/2024. | 0.45 | 399-MSD/2024-25 | 20/09/2024 | VCH/000539/2024-2025 |
243 | Murshidabad Division | BILL/01110/2024-2025 | 23/09/2024 | GOUTAM MANDAL | ORD/000594/2023-2024 | 3333/MURD | 23/10/2023 | Construction of 300 Cum OHR, Pump House at Head Work Site & 2nd Tube well site , Boundary wall for Augmentation of NARASINGHAPUR Zone-II PWSS in Jalangi Block , Islampur Sub-Division under Murshidabad Division ,PHE.Dte.PART_B | 24.18 | 427-MSD/2024-25 | 02/10/2024 | VCH/000590/2024-2025 |
244 | Murshidabad Division | BILL/01124/2024-2025 | 23/09/2024 | R.R. CONSTRUCTION | ORD/000244/2023-2024 | 2432/MURD | 08/08/2023 | Providing FHTC Connection to 510 nos household , Laying of Distribution System, Rising Main ,Construction of Boundary Wall and Pump House with sanitary and Water Supply Arrangement & Construction Pump House cum Blower room cum Chlorine room with out | 29.34 | 416-MSD/2024-25 | 27/09/2024 | VCH/000604/2024-2025 |
245 | Murshidabad Division | BILL/01125/2024-2025 | 23/09/2024 | AYUSH ENTERPRISE | ORD/000890/2022-2023 | 913/MURD | 30/03/2023 | Providing FHTC Connection to 573 nos household , Laying of Distribution System (Part_B), Repairing & Vertical Extention of Boundary Wall for Augmentation work of BACHHARA ZONE-I PWSS in Beldanga-II Block under Murshidabad Division , PHE.Dte. (part_B) | 24.82 | 415-MSD/2024-25 | 27/09/2024 | VCH/000603/2024-2025 |
246 | Murshidabad Division | BILL/01130/2024-2025 | 24/09/2024 | TIPU CONSTRUCTION (PROP. SUJAUDDIN ) | ORD/000794/2022-2023 | 594/MURD | 01/03/2023 | Formal work order for SERPUR PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jivan Mission, Block- SAMSERGANJ of Jangipur Sub-Division, Murshidabad Distric | 49.63 | 440-MSD/2024-25 | 03/10/2024 | VCH/000618/2024-2025 |
247 | Murshidabad Division | BILL/01227/2024-2025 | 30/09/2024 | NILKAMAL BASAK | ORD/000753/2023-2024 | 130/MURD | 15/01/2024 | Augmentation of Ground Water Based Sarbangapur Zone-IA PWSS of accommodate FHTC, Laying Distribution System, Laying Rising Main, Repairing of Switch Room, Repairing of Boundary Wall, Repairing of 450 CUM OHR in Nawda Block within Murshidabad District unde | 35.42 | 496-MSD/2024-25 | 04/10/2024 | VCH/000679/2024-2025 |
248 | Murshidabad Division | BILL/01230/2024-2025 | 30/09/2024 | EXECUTIVE ENGINEER , MURSHIDABAD HIGHWAY DIVISION -I, PWD (ROADS) DIRECT. GOV OF W.B | null | 488/ISD | 26/09/2024 | Restoration of Road which were damaged during laying of Pipeline under Islampore Sub Division PHE DTE. under Murshidabad Division PHE DTE. Ref Memo No: 488/ISD Dt. 26.09.2024 of the AE/ISD PHE DTE. | 9.19 | 493-MSD/2024-25 | 04/10/2024 | VCH/000865/2024-2025 |
249 | Murshidabad Division | BILL/01238/2024-2025 | 01/10/2024 | MOTI RAHAMAN | ORD/000227/2023-2024 | 2403/MURD | 07/08/2023 | DAFAHAT CT PWSS to accommodate FHTC, Laying Distribution System, Rising Main, under Jal Jeevan Mission of Suti-II Block, Murshidabad District under Jangipur Sub Division, Murshidabad Division ,PHE. Dte | 108.78 | 509-MSD/2024-25 | 04/10/2024 | VCH/000690/2024-2025 |
250 | Murshidabad Division | BILL/01242/2024-2025 | 01/10/2024 | B.B.R.C. INFRASTRUCTURE PVT. LTD. | ORD/000224/2023-2024 | 2368/MURD | 04/08/2023 | BHABKI PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jeevan Mission, Block- SUTI-II of Jangipur Sub-Division, Murshidabad District under Murshidabad Div | 46.14 | 519-MSD/2024-25 | 06/10/2024 | VCH/000699/2024-2025 |
251 | Murshidabad Division | BILL/01252/2024-2025 | 01/10/2024 | M/S SUBHAJIT BISWAS | ORD/000653/2022-2023 | 3403/MURD | 22/12/2022 | Sinking of 02(Two) Nos 250mm x 150 mm dia tube well 100.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at BUNDAI PWSS at Head Work Site & 2nd Tube Well Site in Kandi Block under Kandi Sub-Division, Mursh | 7.34 | 502-MSD/2024-25 | 04/10/2024 | VCH/000594/2024-2025 |
252 | Murshidabad Division | BILL/01447/2024-2025 | 23/10/2024 | MUKTI ENTERPRISE | ORD/000259/2023-2024 | 2495/MURD | 11/08/2023 | Ground Water based piped water supply scheme for Hazipur Part- A village, Block:- Suti-II, Jangipur Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 12.13 | 550-MSD/2024-25 | 28/10/2024 | VCH/000732/2024-2025 |
253 | Murshidabad Division | BILL/00348/2024-2025 | 01/07/2024 | SAMAR MUKHERJEE | ORD/000866/2022-2023 | 829/MURD | 23/03/2023 | Providing FHTC Connection to 923 no household and Overhauling of RCC 450 Cum OHR for Augmentation of KADOA (ZONE-I) Part B Piped Water Supply Scheme in SUTI-I Block under Murshidabad Division, PHE.Dte. | 21.58 | 224-MSD/2024-25 | 18/07/2024 | VCH/000316/2024-2025 |
254 | Murshidabad Division | BILL/00363/2024-2025 | 03/07/2024 | KISMAT ARA BEGAM | ORD/000851/2022-2023 | 788/MURD | 21/03/2023 | Formal work order for BAURIPUNI PWSS to accommodate FHTC, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jivan Mission, Block- Suti-II of Jangipur Sub-Division, Murshidabad Distri | 23.69 | 243-MSD/2024-25 | 18/07/2024 | VCH/000336/2024-2025 |
255 | Murshidabad Division | BILL/00367/2024-2025 | 03/07/2024 | BURIMA CONSTRUCTION | ORD/000439/2023-2024 | 2887/MURD | 12/09/2023 | Laying of Rising Main , Distribution System, FHTC, OHR Repairing (Capacity 450 cum), , Sinking of Tube Well , Repairing of pump house & Boundary wall and approach road for Augmentation of Tenya Zone-I PWSS in Bharatpur-II Block, Murshidabad District under | 85.13 | 244-MSD/2024-25 | 18/07/2024 | VCH/000337/2024-2025 |
256 | Murshidabad Division | BILL/00645/2024-2025 | 02/08/2024 | M/S. GOUTAM CHAKRABORTY | ORD/000658/2023-2024 | 3516/MURD | 09/11/2023 | Laying of Rising main , Distribution System, FHTC, construction of OHR (Capacity 400 cum), Repairing of existing OHR, Sinking of Tube Well , Repairing of pump house and boundary wall, and Construction of Pump house cum chlorine Room , Boundary wall and ap | 192.23 | 272-MSD/2024-25 | 20/08/2024 | VCH/000438/2024-2025 |
257 | Murshidabad Division | BILL/00658/2024-2025 | 06/08/2024 | MERCURY ENGINEERING COMPANY | ORD/000502/2022-2023 | 2459/MURD | 26/08/2022 | Formal work order for Water Supply arrangement for arsenic affected habitation with SOLAR Power connection by Construction/ installation of Community Purification Plant (CPP) unit including Tubewell (125 x 50 mm dia ) with Submersible pump (for Populati | 3.58 | 295-MSD/2024-25 | 20/08/2024 | VCH/000355/2024-2025 |
258 | Murshidabad Division | BILL/00701/2024-2025 | 09/08/2024 | KAMIRUL SK AND CO. (PART: KAMIRUL SK. & OTHERS) | ORD/000761/2022-2023 | 475/MURD | 20/02/2023 | Formal work order for Construction of 300 Cum OHR, Pump House at Head Work Site & 2nd Tube well site , Laying Distribution System, Rising Main, FHTC, Boundary wall of SADPUR PWSS in Kandi Block , Kandi Sub-Division under Murshidabad Division ,PHE.Dte | 40.04 | 298-MSD/2024-25 | 20/08/2024 | VCH/000455/2024-2025 |
259 | Murshidabad Division | BILL/00703/2024-2025 | 09/08/2024 | SUGATA CHOWDHURY | ORD/000233/2023-2024 | 2343/MURD | 03/08/2023 | Ground Water based piped water supply scheme for Kharsa Part- E village, Block:- Khargram, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 9.36 | 299-MSD/2024-25 | 20/08/2024 | VCH/000357/2024-2025 |
260 | Murshidabad Division | BILL/00704/2024-2025 | 09/08/2024 | S.N. ENTERPRISE | ORD/000478/2023-2024 | 3035/MURD | 27/09/2023 | Ground Water based piped water supply scheme for Kharsa Part- D village, Block:- Khargram, Kandi Sub-Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 10.16 | 302-MSD/2024-25 | 20/08/2024 | VCH/000356/2024-2025 |
261 | Murshidabad Division | BILL/00821/2024-2025 | 22/08/2024 | M/S BHUBAN DAS | ORD/000335/2022-2023 | 1722/MURD | 04/07/2022 | Formal Work Order for Augmentation of BHAGIRATHPUR Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Domkal Block of Murshidabad District under Murshidabad Division, PHE Dte. | 34.35 | 306-MSD/2024-25 | 05/09/2024 | VCH/000502/2024-2025 |
262 | Murshidabad Division | BILL/00868/2024-2025 | 27/08/2024 | CLIFFORD FACILITY SERVICES PVT. LTD. | ORD/000855/2023-2024 | 609/MURD | 27/02/2024 | Continuation work order for Engagement of 07(Seven) nos. Chemist (01 no. District Laboratory and 06nos. Sub-District Laboratory) , 06(Six)nos. Bacteriologist(01 no. District Laboratory and 05nos. Sub-District Laboratory), 11(Eleven)nos. Lab Assitant(01 no | 11.55 | 334-MSD/2024-25 | 30/08/2024 | VCH/000416/2024-2025 |
263 | Murshidabad Division | BILL/00949/2024-2025 | 02/09/2024 | DHIRENDRANATH MONDAL | ORD/000044/2023-2024 | 1138/MURD | 26/04/2023 | Laying Distribution System of NABADURGA PWSS in Burwan Block , under Murshidabad Division ,PHE.Dte. .(PART-C) | 119.33 | 351-MSD/2024-25 | 06/09/2024 | VCH/000517/2024-2025 |
264 | Murshidabad Division | BILL/00968/2024-2025 | 03/09/2024 | SOUMYADIP MISRA | ORD/000900/2022-2023 | 330/MURD | 07/02/2023 | Hiring of Maxicab (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel / LPG / CNG Engine) in perfect good running condition of performing a very long journey and should be covered anywhere without any trouble on Daily hire basis for of | 0.19 | 342-MSD/2024-25 | 06/09/2024 | VCH/000494/2024-2025 |
265 | Murshidabad Division | BILL/00976/2024-2025 | 04/09/2024 | DALIM BISWAS ENTERPRISE | ORD/000019/2023-2024 | 992/MURD | 11/04/2023 | Construction of 300 Cum OHR, Pump House, Boundwary Wall, Rising Main Connection & Repairing work of Existing OHR, Boundwary Wall , Pump House for Augmentation of Kagram water supply scheme of Bharatpur-II Block under Murshidabad Division, PHE Dte. PART_A | 30.06 | 359-MSD/2024-25 | 11/09/2024 | VCH/000526/2024-2025 |
266 | Murshidabad Division | BILL/01480/2024-2025 | 29/10/2024 | MURARI JHA | ORD/000806/2023-2024 | 359/MURD | 01/02/2024 | Broad band Net recharge and Sweeping & Cleaning of 11 nos water testing laboratories for one year and arrear for Sweeping & Cleaning of 11 nos water testing laboratories for 12 months under Murshidabad Division. P.H. Engineering Dte. 4,C.R.Das Road Be | 3.34 | 561-MSD/2024-25 | 30/10/2024 | VCH/000727/2024-2025 |
267 | Murshidabad Division | BILL/01526/2024-2025 | 11/11/2024 | CFS MANAGEMENT PRIVATE LIMITED | ORD/000003/2024-2025 | 1585/MURD | 21/05/2024 | Payment of month salaries of Chemist , Bacteriologist, Laboratory assistant, Sampling assistant & Data entry operator/CSM for District laboratory and 12 nos sub-district water testing laboratories under Murshidabad Division. P.H. Engineering Dte. For a pe | 27.56 | 573-MSD/2024-25 | 25/11/2024 | VCH/001015/2024-2025 |
268 | Murshidabad Division | BILL/01066/2024-2025 | 12/09/2024 | M/S. S. DAS AND ENTERPRISE | ORD/000098/2023-2024 | 1721/MURD | 04/07/2023 | SIDDHESWARI PWSS under Jal Jeevan Mission of BURWAN Block, Kandi Sub division , Murshidabad District under Murshidabad Division, PHE.Dte. | 279.38 | 383-MSD/2024-25 | 16/09/2024 | VCH/000550/2024-2025 |
269 | Murshidabad Division | BILL/01067/2024-2025 | 12/09/2024 | JIT CONSTRUCTION | ORD/000844/2022-2023 | 756/MURD | 16/03/2023 | Formal Work Order for Construction of 300 Cum OHR, Pump House at Head Work Site & 2nd Tube well site , Laying Distribution System (PART-A), Rising Main, Boundwary Wall for PUNRAPARA PWSS in Khargram Block , under Murshidabad Division ,PHE.Dte. | 40.81 | 388-MSD/2024-25 | 19/09/2024 | VCH/000561/2024-2025 |
270 | Murshidabad Division | BILL/01083/2024-2025 | 13/09/2024 | DIPAYAN DEY | ORD/000192/2023-2024 | 2023/MURD | 25/07/2023 | Laying Distribution System (PART-B), FHTC (PART-A) , Boundary wall for Uncovered of KUNDAL PWSS at JHIKARHATI (PART) (Village Code- 315835) , KUNDAL (Village Code- 315846), PADMALABHBATI (Village Code315845) and JHIKARHATI (PART)in Burwan Block , Kandi S | 14.65 | 405-MSD/2024-25 | 24/09/2024 | VCH/000481/2024-2025 |
271 | Murshidabad Division | BILL/01138/2024-2025 | 24/09/2024 | INDRAJIT MAZUMDAR | ORD/000786/2022-2023 | 542/MURD | 24/02/2023 | Sinking of 02(Two) Nos 250mm x 150 mm dia tube well 100.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at SADPUR PWSS at Head Work Site & 2nd Tube Well Site in Kandi Block under Kandi Sub-Division, Mu | 14.61 | 444-MSD/2024-25 | 02/10/2024 | VCH/000623/2024-2025 |
272 | Murshidabad Division | BILL/01141/2024-2025 | 24/09/2024 | CLASSIC CONSTRUCTION (ANJAN CHATTERJEE) | ORD/000779/2022-2023 | 507/MURD | 22/02/2023 | Repairing of 550Cum OHR and FHTC for Augmentation of PUTIA (ZONE-I) ground water based piped water supply scheme within Raghunathganj-II Block under Murshidabad Division P.H.E. Dte. | 40.52 | 435-MSD/2024-25 | 02/10/2024 | VCH/000614/2024-2025 |
273 | Murshidabad Division | BILL/01319/2024-2025 | 04/10/2024 | H.MONDAL CONSTRUCTION | ORD/000022/2024-2025 | 77/KSD | 25/04/2024 | Hiring of Maxi cab (Non- Air Condition, Bharat Stage ¿ III on or after 01/05/2008 with Diesel / LPG/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on daily hire basis for official | 0.40 | 540-MSD/2024-25 | 06/10/2024 | VCH/000719/2024-2025 |
274 | Murshidabad Division | BILL/01320/2024-2025 | 04/10/2024 | MUNNA AGROTECH ENTERPRISE ( PRO: MIRAJUL ISLAM) | ORD/000873/2023-2024 | 165/ISD | 28/03/2024 | Continuation order for Hiring of Maxicab (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/ LPG/ CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on monthly hi | 0.40 | 542-MSD/2024-25 | 06/10/2024 | VCH/000721/2024-2025 |
275 | Murshidabad Division | BILL/01220/2024-2025 | 30/09/2024 | HARUN ALL RASHID & BROTHERS | ORD/000749/2023-2024 | 114/MURD | 11/01/2024 | Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at ANDHUA ZONE -III Water Supply Scheme at Head Work Site, 2nd Site,3 r d | 8.49 | 527-MSD/2024-25 | 06/10/2024 | VCH/000708/2024-2025 |
276 | Murshidabad Division | BILL/01583/2024-2025 | 03/12/2024 | HARIPUR DR. AMBEDKAR JANASEBA MISSION | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab- Personnel for the period 01/10/2024 to 31/10/2024. | 0.45 | 583-MSD/2024-25 | 06/12/2024 | VCH/001089/2024-2025 |
277 | Murshidabad Division | BILL/01585/2024-2025 | 04/12/2024 | EXECUTIVE ENGINEER , MURSHIDABAD HIGHWAY DIVISION -I, PWD (ROADS) DIRECT. GOV OF W.B | null | 805/9-430 | 11/09/2024 | RESTORATION OF SAGARDIGHI-MONIGRAM-GANKAR-RAGHUNATHGANJ ROAD FROM 1.00 KMP TO 3.50 KMP, 4.00 KMPTO 10.50 KMP ROAD FLANK & CARRIAGE WAY DAMAGED. | 10.91 | 584-MSD/2024-25 | 09/12/2024 | VCH/001090/2024-2025 |
278 | Murshidabad Division | BILL/00333/2024-2025 | 27/06/2024 | M/S. S. DAS AND ENTERPRISE | ORD/000266/2023-2024 | 2572/MURD | 18/08/2023 | Construction of 700 Cum OHR, Boundary Wall, Rising Main Connection, Laying Distribution System PART-A,FHTC at Village- KHARGRAM (Vill. code- 315195) & Village- KANDURI (Vill. code- 315166) for Augmentation of KHARGRAM PWSS in Khargram Block , under Murs | 38.22 | 183-MSD/2024-25 | 01/07/2024 | VCH/000256/2024-2025 |
279 | Murshidabad Division | BILL/00373/2024-2025 | 05/07/2024 | M/S JATIN | ORD/000597/2023-2024 | 3344/MURD | 28/10/2023 | Construction of 600 Cum OHR, Boundary Wall (H.W, 2nd & 3rd Site), Pump House (H.W, 2nd & 3rd Site), Land Development (H.W, 2nd & 3rd Site) and office cum godown of HIZOLE (Zone- II) & its adjoining mouzas water supply scheme of Kandi Block under Murshid | 20.93 | 233-MSD/2024-25 | 18/07/2024 | VCH/000325/2024-2025 |
280 | Murshidabad Division | BILL/00375/2024-2025 | 05/07/2024 | DHIRENDRANATH MONDAL | ORD/000735/2023-2024 | 55/MURD | 05/01/2024 | Allied & Balance Work for Laying of Distribution System, Approach Service Road, Construction of Box Culvert and Land Development of AMLAI PWSS to accommodate FHTC under Jal Jeevan Mission of Murshidabad District under Bharatpur-I Block, Kandi Sub-Division | 28.72 | 229-MSD/2024-25 | 18/07/2024 | VCH/000320/2024-2025 |
281 | Murshidabad Division | BILL/00391/2024-2025 | 08/07/2024 | M/S. SARKAR CONSTRUCTION | ORD/000758/2023-2024 | 140/MURD | 16/01/2024 | Construction of Ground Water Based Paschim Char Majhardiar PWSS of accommodate FHTC(2246 Nos), Laying Distribution System, Laying Rising Main,Over Head Reservoir ( 500 CUM Capacity), Switch Room, Boundary Wall in Raninagar - II Block within Murshidabad | 57.52 | 242-MSD/2024-25 | 18/07/2024 | VCH/000335/2024-2025 |
282 | Murshidabad Division | BILL/00403/2024-2025 | 16/07/2024 | MOTI RAHAMAN | ORD/000518/2023-2024 | 3116/MURD | 05/10/2023 | SIDDHESWARI PWSS under Jal Jeevan Mission of BURWAN Block, Kandi Sub division , Murshidabad District under Murshidabad Division, PHE. Dte. (Part-B) | 85.98 | 250-MSD/2024-25 | 01/08/2024 | VCH/000417/2024-2025 |
283 | Murshidabad Division | BILL/00533/2024-2025 | 30/07/2024 | PRADIP KUMAR DAS | ORD/000535/2022-2023 | 2642/MURD | 19/09/2022 | Formal work order for Augmentation of Faridpur Zone-II Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Jalangi Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 47.22 | 253-MSD/2024-25 | 06/08/2024 | VCH/000420/2024-2025 |
284 | Murshidabad Division | BILL/00589/2024-2025 | 01/08/2024 | PAL CONSTRUCTION | ORD/000819/2023-2024 | 740/MURD | 12/03/2024 | Providing FHTC Connection to 268 nos household, Laying of Rising Main, Laying of Distribution System, overhauling of RCC 45 Cum OHR, Construction of Boundary Wall (For T/W-I) =100mtr, Special repair and renovation of existing 1 (One) Nos Pump House and A | 6.49 | 269-MSD/2024-25 | 09/08/2024 | VCH/000460/2024-2025 |
285 | Murshidabad Division | BILL/00611/2024-2025 | 01/08/2024 | MAMATA USHA ENTERPRISE | ORD/000107/2023-2024 | 1749/MURD | 06/07/2023 | Sinking of 03 (Three) Nos of 300mm x 200 mm dia tubewell i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at P.T RASULPUR (PART - A), Kupila and Baniakhali Water Supply Scheme at DOM | 20.38 | 292-MSD/2024-25 | 20/08/2024 | VCH/000451/2024-2025 |
286 | Murshidabad Division | BILL/00617/2024-2025 | 02/08/2024 | M/S BHUBAN DAS | ORD/000174/2023-2024 | 1992/MURD | 21/07/2023 | GAYSABAD (Part-B) & adjoining mouzas PWSS to accommodate Of T/W,LDS, Pump House Cum Chlorine Room, boundary wall and service road, under Jal Jeevan Mission of Murshidabad District under Murshidabad Division, PHE. Dte. | 76.05 | 293-MSD/24-25 | 20/08/2024 | VCH/000407/2024-2025 |
287 | Murshidabad Division | BILL/00800/2024-2025 | 21/08/2024 | AMAL KUMAR DAS | ORD/000849/2022-2023 | 782/MURD | 20/03/2023 | Formal Work Order for Construction of 350 Cum OHR, Pump House at Head Work Site & 2nd Tube well site , Boundwary Wall Rising Main Connection, of NABADURGA PWSS in Burwan Block , Kandi Sub-Division under Murshidabad Division ,PHE.Dte. (PART-A) | 68.56 | 324-MSD/2024-25 | 30/08/2024 | VCH/000354/2024-2025 |
288 | Murshidabad Division | BILL/00802/2024-2025 | 21/08/2024 | NAMITA ENTERPRISE | ORD/000506/2023-2024 | 3089/MURD | 03/10/2023 | Construction of 600 Cum OHR, Rising Main, Pump House cum Chlorine Room with Sanitary and Water Supply Arrangement & Boundary Wall with R.C.C. column at Head Work Site & 2nd Tube Well Site for Augmentation of BHANDARA Zone-I Ground Based Water Supply Schem | 11.40 | 322-MSD/2024-25 | 05/09/2024 | VCH/000483/2024-2025 |
289 | Murshidabad Division | BILL/00983/2024-2025 | 04/09/2024 | SARTHAK SK. | ORD/000219/2023-2024 | 2328/MURD | 02/08/2023 | Ground Water based piped water supply scheme for Jaulia Part- B village, Block:- Bharatpur-II, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte | 6.29 | 368-MSD/2024-25 | 11/09/2024 | VCH/000474/2024-2025 |
290 | Murshidabad Division | BILL/00988/2024-2025 | 04/09/2024 | HOQUEDAR ALI | ORD/000143/2023-2024 | 1885/MURD | 17/07/2023 | Sahapur (Part-A) & adjoining mouzas PWSS to accommodate Construction Tube Well, OHR, Pump House Cum Chlorine Room, Rising Main, FHTC work, boundary wall and service road, under Jal Jeevan Mission of Murshidabad District under Murshidabad Division, PHE. D | 35.46 | 366-MSD/2024-25 | 11/09/2024 | VCH/000482/2024-2025 |
291 | Murshidabad Division | BILL/01095/2024-2025 | 19/09/2024 | SARKAR WATER SUPPLY AGENCY | ORD/000700/2023-2024 | 3785/MURD | 11/12/2023 | Sinking of 03 (Three) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at LALGOLA ZONE-III, BHANDARA ZONE - I and SURANGAPUR ZONE -I Water Supply | 10.46 | 411-MSD/2024-20 | 25/09/2024 | VCH/000498/2024-2025 |
292 | Murshidabad Division | BILL/01098/2024-2025 | 20/09/2024 | SUMAN ENTERPRISE AND SUMAN AQUA | ORD/000805/2022-2023 | 619/MURD | 03/03/2023 | Formal work order for BHAGULIA & adjoining mouzas PWSS to accommodate FHTC under Jal Jeevan Mission, Block- BURWAN of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE.Dte. | 24.30 | 413-MSD/2024-20 | 24/09/2024 | VCH/000585/2024-2025 |
293 | Murshidabad Division | BILL/01114/2024-2025 | 23/09/2024 | SAMIMA ENTERPRISE | ORD/000575/2023-2024 | 3298/MURD | 20/10/2023 | Laying of Rising Main , Distribution System, FHTC, construction of OHR (Capacity 450 cum), , Sinking of Tube Well , Repairing of pump house and Construction of Pump house cum chlorine Room , Boundary wall and approach road for Augmentation of Nagar Zone-I | 58.92 | 424-MSD/2024-25 | 27/09/2024 | VCH/000609/2024-2025 |
294 | Murshidabad Division | BILL/01116/2024-2025 | 23/09/2024 | PRASANTA SANA | ORD/000973/2022-2023 | 130./MURD | 16/01/2023 | Formal work order for the work of Laying Distribution System (PART-A) for Augmentation of BUNDAI PWSS in Kandi Block , Kandi Sub-Division under Murshidabad Division ,PHE.Dte. ( Scheme ID -PH222362420S000) | 32.59 | 421-MSD/2024-20 | 27/09/2024 | VCH/000500/2024-2025 |
295 | Murshidabad Division | BILL/01223/2024-2025 | 30/09/2024 | ABIDA CONSTRUCTION | ORD/000141/2023-2024 | 1867/MURD | 14/07/2023 | FATEPUR PWSS under Jal Jeevan Mission of BURWAN Block, Kandi Sub division , Murshidabad District under Murshidabad Division, PHE. Dte. | 50.47 | 495-MSD/2024-25 | 04/10/2024 | VCH/000678/2024-2025 |
296 | Murshidabad Division | BILL/01232/2024-2025 | 01/10/2024 | SOUNAK ENTERPRISE | ORD/000708/2022-2023 | 122/MURD | 13/01/2023 | Formal work order for the work of TENTULIA & adjoining moujas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall, IEP and service road, under Jal Jevan Mission of | 89.51 | 500-MSD/2024-25 | 04/10/2024 | VCH/000682/2024-2025 |
297 | Murshidabad Division | BILL/01235/2024-2025 | 01/10/2024 | NOVELTY CONSTRUCTION | ORD/000038/2024-2025 | 1929/MURD | 03/07/2024 | Allied work for Construction of Pump House at Head Works Site &2nd T.W. Site,FHTC, Boundary Wall,Rising Main Connection, Laying Distribution System for Bathur PWSS in Khargram Block under Murshidabad Division, PHE Dte. | 10.32 | 520-MSD/2024-25 | 06/10/2024 | VCH/000700/2024-2025 |
298 | Murshidabad Division | BILL/01443/2024-2025 | 22/10/2024 | M/S GUHA AND ROY | ORD/000532/2022-2023 | 2540/MURD | 02/09/2022 | Formal Work Order for Augmentation of Sagarpara Part-B Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Jalangi Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 53.36 | 546-MSD/2024-25 | 28/10/2024 | VCH/000728/2024-2025 |
299 | Murshidabad Division | BILL/00296/2024-2025 | 24/06/2024 | HARIPUR DR. AMBEDKAR JANASEBA MISSION | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the period 01/05/2024 to 31/05/2024. | 0.45 | 209-MSD/2024-25 | 02/07/2024 | VCH/000254/2024-2025 |
300 | Murshidabad Division | BILL/00297/2024-2025 | 24/06/2024 | SARKAR WATER SUPPLY AGENCY | ORD/000285/2023-2024 | 2633/MURD | 23/08/2023 | Sinking of 03 (Three) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at AOCHA AND ADJOINING MOUJJAS Water Supply Scheme at Head Work Site, 2nd Site s | 15.66 | 189-MSD/2024-25 | 01/07/2024 | VCH/000258/2024-2025 |
301 | Murshidabad Division | BILL/00414/2024-2025 | 16/07/2024 | M/S JOY MA BANAMALI | ORD/000657/2023-2024 | 3381/MURD | 31/10/2023 | Hiring of maxi cab (Non Air conditioned ,Bharat stage III) on or after 31.10.2023 with diesel/LPG/CNG Engine) in perfect good condition of performing very long journey and should cover anywere within any trouble on daily wage basis for official used und | 0.40 | 260-MSD/2024-25 | 06/08/2024 | VCH/000425/2024-2025 |
302 | Murshidabad Division | BILL/00706/2024-2025 | 12/08/2024 | BHARATI CHEMICAL & SCIENTIFIC WORKS | ORD/000792/2023-2024 | 440/MURD | 08/02/2024 | Supply & delivery of water quality parameter testing Chemicals, Reagents, Consumables & Glassware for 19 (Nineteen) laboratories for the period of 6 months under Murshidabad Division, PHE Dte. in the District of Murshidabad. | 46.07 | 301-MSD/2024-25 | 16/08/2024 | VCH/000464/2024-2025 |
303 | Murshidabad Division | BILL/00847/2024-2025 | 27/08/2024 | NEW INDIA CONSTRUCTION | ORD/000589/2023-2024 | 3331/MURD | 23/10/2023 | Augmentation of Ground Water Based Rejinagar Zone III PWSS of accommodate with Boundary Wall, 400 CUM OHR in Beldanga II Block within Murshidabad District under Murshidabad Division, PHE Dte. [ Part B ] | 29.86 | 340-MSD/2024-25 | 05/09/2024 | VCH/000508/2024-2025 |
304 | Murshidabad Division | BILL/00866/2024-2025 | 27/08/2024 | MARUTI CONSTRUCTION AND CO. | ORD/000734/2022-2023 | 385/MURD | 10/02/2023 | Formal work order for Construction of Boundwary Wall, Pump House & Laying Distribution System(PART-B) Uncovered of UDAY CHANDPUR PWSS in Kandi Block , Kandi Sub-Division under Murshidabad Division ,PHE. Dte. | 44.09 | 327-MSD/2024-25 | 30/08/2024 | VCH/000476/2024-2025 |
305 | Murshidabad Division | BILL/00870/2024-2025 | 28/08/2024 | FARAKKA BEEDI SHRAMIK KALYAN SAMITY | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the period 01/06/2024 to 31/07/2024. | 0.90 | 331-MSD/2024-25 | 30/08/2024 | VCH/000413/2024-2025 |
306 | Murshidabad Division | BILL/00938/2024-2025 | 02/09/2024 | ORKID CONSTRUCTION | ORD/000590/2023-2024 | 3332/MURD | 23/10/2023 | Augmentation of Barabil Raghunathpur Zone-II PWSS to accommodate Construction of Pump House cum Chlorine Room (5.90m x 4.1m with sanitary and Water Supply Arrangement) 1 no& Pump House (4.10m x 3.5m without sanitary and Water Supply Arrangement) 1no, Cons | 63.12 | 354-MSD/2024-25 | 06/09/2024 | VCH/000518/2024-2025 |
307 | Murshidabad Division | BILL/00951/2024-2025 | 02/09/2024 | KAMIRUL SK AND CO. (PART: KAMIRUL SK. & OTHERS) | ORD/000082/2023-2024 | 1384/MURD | 22/05/2023 | Augmentation of JURANPUR (PART-A) PWSS under Jal Jivan Mission of DOMKAL Block, ISLAMPUR Sub Division , Murshidabad District under Murshidabad Division, PHE. Dte. | 229.00 | 349-MSD/2024-25 | 05/09/2024 | VCH/000408/2024-2025 |
308 | Murshidabad Division | BILL/01164/2024-2025 | 26/09/2024 | SARKAR WATER SUPPLY AGENCY | ORD/000105/2024-2025 | 2195/MURD | 31/07/2024 | Sinking of 2NOS. 300mm x 200 mm dia tube well 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Raturi Zone-II Water Supply Scheme and Bahutuli Water Supply Scheme under Murshidabad Division, P.H.Eng | 7.32 | 475-MSD/2024-25 | 02/10/2024 | VCH/000663/2024-2025 |
309 | Murshidabad Division | BILL/01165/2024-2025 | 26/09/2024 | MARUTI CONSTRUCTION AND CO | ORD/001281/2021-2022 | 419./LSD | 31/12/2021 | Laying of UPVC pipeline at village Laxmijola (East Side) in connection with FHTC work under Kasiadanga (Zone-II) Water Supply Scheme under Jangipur Sub-Division,P.H.E. Dte. in the District of Murshidabad. | 3.79 | 457-MSD/2024-25 | 02/10/2024 | VCH/000644/2024-2025 |
310 | Murshidabad Division | BILL/01178/2024-2025 | 27/09/2024 | MAA CONSTRUCTION (MUJIBOR, MAJDIYA SEKHPARA) | ORD/000865/2022-2023 | 830/MURD | 23/03/2023 | Laying of Distribution System with FHTC to 752 nos household, Rising Main & OHR Repair of 90 cum capacity for Augmentation of Birendranagar (Zone-I) Pipe water supply scheme in Raghunathganj-II Block under Murshidabad Division ,PHE.Dte | 24.97 | 452-MSD/2024-25 | 02/10/2024 | VCH/000637/2024-2025 |
311 | Murshidabad Division | BILL/01179/2024-2025 | 27/09/2024 | M/S.TAPAS KUMAR CHAKRABORTY | ORD/000043/2023-2024 | 1141/MURD | 26/04/2023 | Laying Distribution System & Functional Household Tap Connection (FHTC) for Augmentation of GOKARNA Water Supply Scheme under Murshidabad Division, P.H.E.Dte. | 23.80 | 466-MSD/2024-25 | 02/10/2024 | VCH/000654/2024-2025 |
312 | Murshidabad Division | BILL/01185/2024-2025 | 27/09/2024 | M/S. S.S. ENTERPRISE( PROP: SANDIP SAHA) | ORD/000886/2022-2023 | 905/MURD | 29/03/2023 | Providing FHTC to 1034 no household, Laying Distribution System, Vertical extension of Boundary wall and repairing Pump House and Overhauling of R.C.C. elevated reservoir 350 Cum capacity of staging height 20 mtr. (Shaft wall) for Augmentation work of Pro | 41.07 | 460-MSD/2024-25 | 02/10/2024 | VCH/000648/2024-2025 |
313 | Murshidabad Division | BILL/01046/2024-2025 | 09/09/2024 | M/S. BHABESH HALDER | ORD/000528/2023-2024 | 3119/MURD | 05/10/2023 | Augmentation of CHARMAHULA PWSS under Jal Jeevan Mission of BERHAMPORE Block, BERHAMPORE Subdivision , Murshidabad District under Murshidabad Division, PHE.Dte. | 50.88 | 379-MSD/2024-25 | 12/09/2024 | VCH/000547/2024-2025 |
314 | Murshidabad Division | BILL/01052/2024-2025 | 09/09/2024 | SWARUP KUMAR BHATTA | ORD/000020/2024-2025 | 95/KSD | 19/06/2024 | Restoration work of concrete road between node point 77A to 78 of Pachhipara Water Supply Scheme under Kandi Sub Division, P.H.E.Dte. in the district of Murshidabad. | 0.96 | 373-MSD/2024-25 | 12/09/2024 | VCH/000488/2024-2025 |
315 | Murshidabad Division | BILL/01070/2024-2025 | 12/09/2024 | DILIP KUMAR MONDAL | ORD/000863/2022-2023 | 823/MURD | 23/03/2023 | BIPRA SEKHAR PWSS to accommodate FHTC under Jal Jeevan Mission of Murshidabad District under Burwan Block , Kandi Sub-Division, of Murshidabad Division ,PHE.Dte. | 134.20 | 392-MSD/2024-25 | 19/09/2024 | VCH/000564/2024-2025 |
316 | Murshidabad Division | BILL/01079/2024-2025 | 13/09/2024 | HARUN ALL RASHID & BROTHERS | ORD/000658/2022-2023 | 3415/MURD | 22/12/2022 | Sinking of 02(Two) Nos 250mm x 150 mm dia Replacement tube well 100.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at SANTOSHPUR PWSS at Head Work Site & 2nd Tube Well Site in Kandi Block under Kandi Sub | 13.69 | 402-MSD/2024-25 | 24/09/2024 | VCH/000579/2024-2025 |
317 | Murshidabad Division | BILL/01085/2024-2025 | 13/09/2024 | AJOY GHOSH (PROP. SUBHASH GHOSH) | ORD/000419/2023-2024 | 2833/MURD | 07/09/2023 | Ground Water based mini piped water supply scheme for Bamandasbati village, Block:- Kandi, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 15.98 | 431-MSD/2024-25 | 02/10/2024 | VCH/000520/2024-2025 |
318 | Murshidabad Division | BILL/01145/2024-2025 | 24/09/2024 | SHIVAM ENTERRPISE | null | GO2223013663PH | 09/02/2023 | PURCHASE OF UPS FOR MSD DIVN, 6 NOS, GEMC-511687752876039 | 0.15 | 451-MSD/2023-24 | 02/10/2024 | VCH/000858/2024-2025 |
319 | Murshidabad Division | BILL/01284/2024-2025 | 03/10/2024 | M/S UNIVERSAL TRADING | ORD/000190/2023-2024 | 1993/MURD | 21/07/2023 | Construction of 450 Cum OHR, Pump House at Head Work Site & 2nd Tube well site , Laying Distribution System (PART-A), Rising Main, for Uncovered of KUNDAL PWSS at KUNDAL (Village Code- 315846), PADMALABHBATI (Village Code- 315845) in Burwan Block , Kandi | 40.90 | 531-MSD/2024-25 | 06/10/2024 | VCH/000712/2024-2025 |
320 | Murshidabad Division | BILL/01285/2024-2025 | 03/10/2024 | SUMAN ENTERPRISE AND SUMAN AQUA | ORD/000002/2024-2025 | 158/MSD | 29/04/2024 | Continuation order for Hiring of Maxi cab (Non- Air Condition, Bharat Stage VI on or after 01/05/2008 with Diesel / LPG/CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on daily hire | 0.40 | 532-MSD/2024-25 | 06/10/2024 | VCH/000713/2024-2025 |
321 | Murshidabad Division | BILL/01288/2024-2025 | 03/10/2024 | M/S JOY MA BANAMALI | ORD/000657/2023-2024 | 3381/MURD | 31/10/2023 | Hiring of maxi cab (Non Air conditioned ,Bharat stage III) on or after 31.10.2023 with diesel/LPG/CNG Engine) in perfect good condition of performing very long journey and should cover anywere within any trouble on daily wage basis for official used und | 0.40 | 534-MSD/2024-25 | 06/10/2024 | VCH/000716/2024-2025 |
322 | Murshidabad Division | BILL/01321/2024-2025 | 04/10/2024 | MUNNA AGROTECH ENTERPRISE ( PRO: MIRAJUL ISLAM) | ORD/000873/2023-2024 | 165/ISD | 28/03/2024 | Continuation order for Hiring of Maxicab (Non-Air Condition, Bharat Stage-III on or after 01/05/2008 with Diesel/ LPG/ CNG Engine) in perfect good running condition of performing a very long journey and should be covered without any trouble on monthly hi | 0.40 | 542-MSD/2024-25 | 06/10/2024 | VCH/000722/2024-2025 |
323 | Murshidabad Division | BILL/01190/2024-2025 | 28/09/2024 | S. ENTERPRISE (PROP: SAIRUL ISLAM) | ORD/000745/2022-2023 | 412/MURD | 15/02/2023 | Formal work order for Construction of 300 Cum OHR, Pump House at Head Work Site & 2nd Tube well site , Laying Distribution System, Rising Main, FHTC, Boundary wall of SIJGRAM PWSS in Kandi Block , Kandi Sub-Division under Murshidabad Division ,PHE.Dte. | 24.20 | 482-MSD/2024-25 | 02/10/2024 | VCH/000669/2024-2025 |
324 | Murshidabad Division | BILL/01192/2024-2025 | 28/09/2024 | SAMBHU NATH ROY | ORD/000267/2023-2024 | 2575/MURD | 18/08/2023 | Laying Distribution System for Augmentation of Loknathpur Zone-I (Part-A) PWSS of Beldanga-II Block under Murshidabad Division, PHE Dte. | 20.51 | 476-MSD/2024-25 | 02/10/2024 | VCH/000664/2024-2025 |
325 | Murshidabad Division | BILL/01195/2024-2025 | 28/09/2024 | M/S NIRAPADA BHATTACHARJEE | ORD/000003/2023-2024 | 952/MURD | 05/04/2023 | Augmentation of SURANGAPUR Zone-I (Part -A) Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Nawda Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 111.17 | 478-MSD/2024-25 | 02/10/2024 | VCH/000666/2024-2025 |
326 | Murshidabad Division | BILL/01196/2024-2025 | 28/09/2024 | M/S. CHAKRABORTY & COMPANY | ORD/000547/2023-2024 | 3177/MURD | 11/10/2023 | Laying of Rising main , Distribution System, FHTC, construction of OHR (Capacity 300 & 900 cum), Sinking of Tube Well and Construction of Pump house cum chlorine Room , Boundary wall and approach road for Augmentation of Arjunpur Zone- I,II & II | 91.73 | 488-MSD/2024-25 | 02/10/2024 | VCH/000674/2024-2025 |
327 | Murshidabad Division | BILL/01202/2024-2025 | 28/09/2024 | BIJAY CHOWDHURY | ORD/000568/2023-2024 | 3288/MURD | 19/10/2023 | Augmentation of Ground Water Based KAKRAMARI (ZONE-I) &KAKRAMARI (ZONE-II) PWSS, Block- SUTI-II, District-Murshidabad, Under Murshidabad Division, P.H.Engineering Dte. | 93.88 | 489-MSD/2024-25 | 02/10/2024 | VCH/000675/2024-2025 |
328 | Murshidabad Division | BILL/01204/2024-2025 | 28/09/2024 | TRIYA CONSTRUCTION | ORD/000711/2023-2024 | 3812/MURD | 12/12/2023 | Sinking of 03 (Three) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at LOKENATHPUR ZONE-II Water Supply Scheme at Head Work Site, 2nd Site site | 13.24 | 491-MSD/2024-25 | 02/10/2024 | VCH/000677/2024-2025 |
329 | Murshidabad Division | BILL/01213/2024-2025 | 30/09/2024 | INDRAJIT MAZUMDAR | ORD/000400/2023-2024 | 2807/MURD | 05/09/2023 | Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at BIPRA SEKHAR AND ADJOINING MOUJAS Water Supply Scheme & ALAMPUR Water Supply Sc | 16.79 | 524-MSD/2024-25 | 06/10/2024 | VCH/000705/2024-2025 |
330 | Murshidabad Division | BILL/01217/2024-2025 | 30/09/2024 | PARUL ELECTRICAL INSTALLER | ORD/000154/2022-2023 | 152/BSD | 12/04/2022 | Providing Functional Household Tap Connections (FHTC) in connection with Jal Swapna (Jal Jeevan Mission) and Laying of Distribution system of Arazi Madhupur(VILLAGE CODE-315333) Ground Based piped water supply scheme of Arazi Madhupur (south portion) | 2.29 | 505-MSD/2024-25 | 04/10/2024 | VCH/000686/2024-2025 |
331 | Murshidabad Division | BILL/00307/2024-2025 | 24/06/2024 | MAMATA USHA ENTERPRISE | ORD/000718/2023-2024 | 3835/MURD | 14/12/2023 | Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Salar Zone- I A Water Supply Scheme at Head Work Site, 2nd Site,3 r d s | 20.59 | 207-MSD/2024-25 | 02/07/2024 | VCH/000273/2024-2025 |
332 | Murshidabad Division | BILL/00310/2024-2025 | 24/06/2024 | NAYLA CONSTRUCTION | ORD/000758/2022-2023 | 445/MURD | 17/02/2023 | Formal work order for Laying Distribution System ,FHTC, Construction of 1 (one) no Pump House (4.25m x 3.60m with sanitary and Water Supply Arrangement), Construction of 1 (one) no Toilet Block with sanitary and Water Supply Arrangement and 2(two) nos Pu | 102.02 | 199-MSD/2024-25 | 02/07/2024 | VCH/000265/2024-2025 |
333 | Murshidabad Division | BILL/00317/2024-2025 | 25/06/2024 | KAMIRUL SK AND CO. (PART: KAMIRUL SK. & OTHERS) | ORD/000245/2023-2024 | 2433/MURD | 08/08/2023 | Construction of 500 Cum OHR, Pump House Boundary Wall, Land Development, Rising Main Connection, Laying Distribution System of AOCHA water supply scheme of BHARATPUR-II Block under Murshidabad Division, P.H.E. Dte. in the District of Murshidabad Part-A | 163.90 | 201-MSD/2024-25 | 02/07/2024 | VCH/000267/2024-2025 |
334 | Murshidabad Division | BILL/00319/2024-2025 | 25/06/2024 | NILAVA GHOSHAL (BUMBA) | ORD/000706/2023-2024 | 3808/MURD | 12/12/2023 | Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Jot Sundar Water Supply Scheme at Head Work Site, 2nd Site,3 r d site a | 21.23 | 191-MSD/2024-25 | 01/07/2024 | VCH/000259/2024-2025 |
335 | Murshidabad Division | BILL/00327/2024-2025 | 26/06/2024 | A.S. CONSTRUCTION | ORD/000226/2023-2024 | 2369/MURD | 04/08/2023 | Construction of 200 Cum OHR, Rising Main for Augmentation of SARBANGAPUR ZONE-IB PWSS in NAWDA Block, Berhampore Sub-Division under Murshidabad Division ,PHE.Dte.(Part_A) | 33.32 | 204-MSD/2024-25 | 02/07/2024 | VCH/000270/2024-2025 |
336 | Murshidabad Division | BILL/00377/2024-2025 | 05/07/2024 | ARIZ ENTERPRISE | ORD/000848/2022-2023 | 781/MURD | 20/03/2023 | Formal work order for KIRTTIPUR & adjoining moujas PWSS to accommodate FHTC under Jal Jivan Mission, Block- KHARGRAM of Kandi Sub Division of Murshidabad District under Murshidabad Division, PHE.Dte. | 65.37 | 232-MSD/2024-25 | 18/07/2024 | VCH/000324/2024-2025 |
337 | Murshidabad Division | BILL/00389/2024-2025 | 05/07/2024 | SUMAN CHOWDHURY | ORD/000627/2023-2024 | 3423/MURD | 02/11/2023 | Providing Functional Household Tap Connections (FHTC) (1676 Nos) in connection with (Jal Jeevan Mission ) and under command area of village of Babaltali ( Village Code -314583) under Godhanpara Ground Water Based Water Supply Scheme for Arsenic Aff | 14.03 | 240-MSD/2024-25 | 18/07/2024 | VCH/000333/2024-2025 |
338 | Murshidabad Division | BILL/00390/2024-2025 | 05/07/2024 | M/S SOBHA & CO. | ORD/000345/2022-2023 | 1924/MURD | 19/07/2022 | Preparation of D.P.R Consultancy work Augmentation/Augmentation with Retrofitting in connection with the Functional House Hold Tap Connection of 03(Three) nos existing commisioned PWSS Domkol Block of ISLAMPUR SUB-DIVISION under Murshidabad Division P. | 9.06 | 220-MSD/2024-25 | 18/07/2024 | VCH/000255/2024-2025 |
339 | Murshidabad Division | BILL/00400/2024-2025 | 08/07/2024 | PRADIP KUMAR DAS | ORD/000679/2022-2023 | 38/MURD | 04/01/2023 | Formal work order for the work of KHESAR & adjoining mouzas PWSS to accommodate FHTC, Construction Tube Well, OHR, Pump House Cum Chlorine Room, Laying Distribution System, Rising Main, boundary wall and service road, under Jal Jeevan Mission of Murshid | 32.18 | 223-MSD/2024-25 | 18/07/2024 | VCH/000315/2024-2025 |
340 | Murshidabad Division | BILL/00528/2024-2025 | 30/07/2024 | JAMIRUL CONSTRUCTION | ORD/000870/2022-2023 | 849/MURD | 24/03/2023 | Providing FHTC Connection to 1424 nos household, Special repair and renovation of existing 2 (Two) Nos Pump House & Alied Works and Repair of Boundary Wall (140m + 50m) =190 m at T/W-I site & T/W-II site for Augmentation of HILORA ZONE II Piped Water Supp | 5.10 | 254-MSD/2024-25 | 06/08/2024 | VCH/000421/2024-2025 |
341 | Murshidabad Division | BILL/00538/2024-2025 | 30/07/2024 | DAS TRADING CO. | ORD/000449/2023-2024 | 2969/MURD | 20/09/2023 | Balance work for Laying of Distribution Pipeline, Repair and Renovation of OHR of 200 cum Capacity and Providing Functional Household Connection of 590 nos household of Gangadhari (village code-314589) of Berhampore Sub-Division under Murshidabad Division | 20.49 | 252-MSD/2024-25 | 06/08/2024 | VCH/000419/2024-2025 |
342 | Murshidabad Division | BILL/00600/2024-2025 | 01/08/2024 | TAPAN DAS | ORD/000619/2023-2024 | 3394/MURD | 01/11/2023 | Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at GHORAMARA Water Supply Scheme at Head Work Site, 2nd Site site at Samserganj Bl | 8.01 | 284-MSD/2024-25 | 20/08/2024 | VCH/000445/2024-2025 |
343 | Murshidabad Division | BILL/00602/2024-2025 | 01/08/2024 | TAPAN DAS | ORD/000614/2023-2024 | 3386/MURD | 01/11/2023 | Sinking of 02 (Two) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at SERPUR (CT) Water Supply Scheme at Head Work Site, 2nd Site site at Samserganj | 9.19 | 283-MSD/2024-25 | 20/08/2024 | VCH/000444/2024-2025 |
344 | Murshidabad Division | BILL/00605/2024-2025 | 01/08/2024 | NATIONAL CONSTRUCTION (MD ASRAFUL SK) | ORD/000632/2023-2024 | 3437/MURD | 03/11/2023 | Providing Functional Household Tap Connections (FHTC) (241 Nos) in connection with (Jal Jeevan Mission ) and under command area of village of Pashupatibati & Bolpara ( Village Code -315948, 315966, 315952) under Panchhipara Ground Water Based Wate | 2.50 | 268-MSD/2024-25 | 20/08/2024 | VCH/000436/2024-2025 |
345 | Murshidabad Division | BILL/00807/2024-2025 | 21/08/2024 | H.MONDAL CONSTRUCTION | ORD/000581/2023-2024 | 3316/MURD | 22/10/2023 | Construction of Ground Water Based ALAMPUR AND ADJOINING MOUZAS PWSS of accommodate FHTC( 960 Nos), Laying Distribution System, Laying Rising Main,, Switch Room, Boundary Wall, 150 CUM OHR in Kandi Block within Murshidabad District under Murshidabad Di | 23.90 | 320-MSD/2024-25 | 05/09/2024 | VCH/000506/2024-2025 |
346 | Murshidabad Division | BILL/00887/2024-2025 | 28/08/2024 | SUMAN ENTERPRISE AND SUMAN AQUA | ORD/001620/2021-2022 | 466/MURD | 21/02/2022 | Installation of dual power based(Solar & electric) stand alone community purification plant(CWPP) FOR BALANCE 18 UNCOVERED habitations WHERE ARSENIC CONCENTRATION IS .01 TO .015 in the left out Arsenic affected habitations in the different block under | 0.27 | 344-MSD/2024-25 | 06/09/2024 | VCH/000480/2024-2025 |
347 | Murshidabad Division | BILL/00987/2024-2025 | 04/09/2024 | TAPAN DAS | ORD/000555/2023-2024 | 3194/MURD | 12/10/2023 | Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, III of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at BHASIPAIKAR ZONE-IIB Water Supply Scheme at Head Work Site, 2nd Site,3 r d | 7.27 | 358-MSD/2024-25 | 11/09/2024 | VCH/000525/2024-2025 |
348 | Murshidabad Division | BILL/01093/2024-2025 | 18/09/2024 | MAHATO ENTERPRISE | ORD/000220/2023-2024 | 2339/MURD | 03/08/2023 | Ground Water based piped water supply scheme for Jaulia Part- C village, Block:- Bharatpur-II, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 8.07 | 406-MSD/2024-25 | 24/09/2024 | VCH/000584/2024-2025 |
349 | Murshidabad Division | BILL/01096/2024-2025 | 19/09/2024 | SARKAR WATER SUPPLY AGENCY | ORD/000388/2023-2024 | 2778/MURD | 01/09/2023 | Sinking of 01 (One) Nos of 250mm x 150 mm dia tube well i.e. TW-I, II of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at CHAK RAMPRASAD and Dakshin Khanda Zone - IA Water Supply Scheme under Murshida | 7.86 | 410-MSD/2024-25 | 24/09/2024 | VCH/000490/2024-2025 |
350 | Murshidabad Division | BILL/01126/2024-2025 | 23/09/2024 | NADIA TUBEWELLS | ORD/000868/2023-2024 | 832/MURD | 15/03/2024 | Sinking of 01 (One) Nos of 300mm x 200 mm dia tube well i.e. TW-I of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at KATAKOBRA ZONE-I&II Water Supply Scheme and Gokul Chak Water Supply Scheme under Mu | 10.93 | 414-MSD/2024-25 | 27/09/2024 | VCH/000602/2024-2025 |
351 | Murshidabad Division | BILL/01225/2024-2025 | 30/09/2024 | K. B. CONSTRUCTION (PROP.KUNTAL BHATTACHARYA) | ORD/000416/2023-2024 | 2836/MURD | 07/09/2023 | Ground Water based mini piped water supply scheme for Ramdova village, Block:- Suti- I, Jangipur Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 9.15 | 499-MSD/2024-25 | 04/10/2024 | VCH/000597/2024-2025 |
352 | Murshidabad Division | BILL/01234/2024-2025 | 01/10/2024 | ARJIMA CONSTRUCTION | ORD/000040/2024-2025 | 1926/MURD | 03/07/2024 | Allied work of Laying rising main and distribution system with FHTC including Construction Pump House Cum Chlorine Room , Boundary wall at 2nd Tube Well Site and Earth filling at both site of Padamkandi Water Supply Scheme , under Jal Jeevan Mission of | 18.55 | 518-MSD/2024-25 | 06/10/2024 | VCH/000698/2024-2025 |
353 | Murshidabad Division | BILL/01248/2024-2025 | 01/10/2024 | AJAY MONDAL | ORD/000584/2023-2024 | 3334/MURD | 23/10/2023 | Providing FHTC Connection to 279 nos household , Laying of Distribution System, Rising Main for Augmentation work of Rejinagar Zone-I PWSS within Beldanga-II Block under Murshidabad Division , PHE.Dte. ( PART - A) | 77.65 | 512-MSD/2024-25 | 06/10/2024 | VCH/000693/2024-2025 |
354 | Murshidabad Division | BILL/01469/2024-2025 | 28/10/2024 | S.K. CONSTRUCTION (SUDIP KUMAR SANYAL) | ORD/000436/2023-2024 | 2870/MURD | 11/09/2023 | Ground Water based mini piped water supply scheme for Balichuna village, Block:- Bharatpur-I, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 5.21 | 562-MSD/2024-25 | 27/11/2024 | VCH/001084/2024-2025 |
355 | Murshidabad Division | BILL/00337/2024-2025 | 27/06/2024 | M/S. BOJLUR RAHAMAN | ORD/000604/2023-2024 | 3365/MURD | 31/10/2023 | Ground Water based mini piped water supply scheme for Katigram village, Block:- Khargram, Kandi Sub- Division in Murshidabad district under Murshidabad Division, P.H.E Dte. | 12.11 | 215-MSD/2024-25 | 08/07/2024 | VCH/000309/2024-2025 |
356 | Murshidabad Division | BILL/00655/2024-2025 | 05/08/2024 | EXECUTIVE ENGINER WBSRDA MURSHIDABAD DIVISION | null | 735/MD/SRDA/13-407/PHE | 26/07/2024 | SUBMISSION OF ONE NO REPAIRING ESTIMATE OF ROAD WHICH IS DAMAGED DURING PHE PIPE LINE LAYING IE. | 20.84 | 282-MSD/2024-25 | 13/08/2024 | VCH/000443/2024-2025 |
357 | Murshidabad Division | BILL/00810/2024-2025 | 21/08/2024 | NADIA TUBEWELLS | ORD/000742/2022-2023 | 381/MURD | 10/02/2023 | Sinking of 02(Two) Nos 250mm x 150 mm dia tube well 100.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at MOLLA PWSS at Head Work Site & 2nd Tube Well Site in Kandi Block under Kandi Sub-Division, Mursh | 7.94 | 314-MSD/2024-25 | 30/08/2024 | VCH/000468/2024-2025 |
358 | Murshidabad Division | BILL/00865/2024-2025 | 27/08/2024 | M/S. SINHA & SONS | ORD/000666/2022-2023 | 3492/MURD | 30/12/2022 | Formal work order for construction of 1250 M3 Capacity, 20mtr. Staging height RCC Elevated Service Reservoir as per Departmental type design (Ref :- DRG.No. PC/-I/OHR/18/2012) including delivery, Inlet, Washout & Overflow pipe connection etc. all complete | 81.56 | 339-MSD/2024-25 | 04/09/2024 | VCH/000374/2024-2025 |
359 | Murshidabad Division | BILL/00964/2024-2025 | 03/09/2024 | SAMRIDDHI ASSOCIATED | ORD/000026/2023-2024 | 1066/MURD | 18/04/2023 | Laying Distribution System, Rising Main, FHTC, Repairing of Boundary Wall, Pump House & Existing OHR for Augmentation of Bhalkundi Zone-II Water at Supply Scheme in Khargram Block , under Murshidabad Division , PHE.Dte. | 89.35 | 347-MSD/2024-25 | 11/09/2024 | VCH/000515/2024-2025 |
360 | Murshidabad Division | BILL/00975/2024-2025 | 04/09/2024 | AQUEDUCT PLASTICS PVT LTD | ORD/000292/2018-2019 | 582/MURD | 07/03/2019 | Formal Work Order for 'Surveying, Planning, Design, Delievery, erection, construction, commissioning and completion in all respect of all CIVIL,ELECTRICAL and MECHANICAL works including all allied related and enabling works but excluding construction of O | 108.79 | 350-MSD/2024-25 | 05/09/2024 | VCH/000410/2024-2025 |
361 | Murshidabad Division | BILL/01162/2024-2025 | 26/09/2024 | PRADIP MAHATO | ORD/000260/2023-2024 | 2502/MURD | 11/08/2023 | Erection of Iron Elimination Plant (IEP), Construction of pathway and Repairing of Pump House & Boundary wall at Head Work Site of Pachhipara Water Supply Scheme under Kandi Sub Division, P.H.E. Dte. in the district of Murshidabad. | 20.85 | 459-MSD/2024-25 | 02/10/2024 | VCH/000646/2024-2025 |
362 | Murshidabad Division | BILL/01186/2024-2025 | 27/09/2024 | M/S D. PALIT & CO. | ORD/000659/2022-2023 | 3404/MURD | 22/12/2022 | Sinking of 02(Two) Nos 250mm x 150 mm dia tube well 100.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at GUNANANDABATI PWSS at Head Work Site & 2nd Tube Well Site in Bharatpur-I Block under Kandi SubDivis | 13.80 | 461-MSD/2024-25 | 02/10/2024 | VCH/000649/2024-2025 |
363 | Murshidabad Division | BILL/01187/2024-2025 | 27/09/2024 | BIJAY CHOWDHURY | ORD/000556/2023-2024 | 3218/MURD | 13/10/2023 | Laying of Distribution System, Rising Main Connection,FHTC Work , Repair & Renovation of RCC OHR, Construction of OHR, Bounwary Wall, Pump House & Sinking of 300 x 200 mm diaTubewell for Augmentation Work of Hilora Zone-I,Prosadpur Zone-III, Bazegazip | 56.38 | 462-MSD/2024-25 | 02/10/2024 | VCH/000650/2024-2025 |
364 | Murshidabad Division | BILL/01188/2024-2025 | 27/09/2024 | GOURANGA MONDAL | ORD/000835/2023-2024 | 768/MURD | 13/03/2024 | Allied work for Laying Distribution System, Construction of Boundary Wall, Approach Road & Land Development of Jajan PWSS in Bhratpur-I Block , KANDI Sub-Division under Murshidabad Division ,PHE. Dte. | 33.32 | 464-MSD/2024-25 | 02/10/2024 | VCH/000652/2024-2025 |
365 | Murshidabad Division | BILL/01069/2024-2025 | 12/09/2024 | BISWAS CONSTRUCTION (GOLAM MURTAJA, BABLABONA AAIFB7956Q) | ORD/000611/2022-2023 | 3244/MURD | 06/12/2022 | Formal work order for Laying of Distribution System (part-II) and Providing Functional Household Tap Connection to 550 nos household & Sub-soil Investigation and Construction of OHR (500 cum) of Katlamari Zone -II of Islampur Sub-Division under Murshidab | 37.01 | 386-MSD/2024-25 | 19/09/2024 | VCH/000558/2024-2025 |
366 | Murshidabad Division | BILL/01075/2024-2025 | 12/09/2024 | SYAMA PRASAD MOOKERJEE PORT, KOLKATA | null | Hyd/716/ Beldanga/ PHED Murshidabad/11 | 23/02/2024 | Feasibility study to select a suitable location for proposed intake jetty for drawal of 23.00 MLD raw water from River Bhagirathi at Kumarpur, Beldanga-I Block. For surface water supply Scheme under Murshidabad Division in Murshidabad District. | 60.66 | 380-MSD/2024-25 | 18/09/2024 | VCH/000548/2024-2025 |
367 | Murshidabad Division | BILL/01088/2024-2025 | 18/09/2024 | FARAKKA BEEDI SHRAMIK KALYAN SAMITY | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the month of August 2024. | 0.45 | 396-MSD/2024-25 | 20/09/2024 | VCH/000536/2024-2025 |
368 | Murshidabad Division | BILL/01299/2024-2025 | 04/10/2024 | FARAKKA BEEDI SHRAMIK KALYAN SAMITY | null | 27552-27581/MC/LABS/000007/2021 | 14/12/2022 | Claim for remuneration of Lab Personnel for the period of 01/09/2024 to 30/09/2024 and festive bonus for the year 2024-2025. | 0.63 | 537-MSD/2024-25 | 06/10/2024 | VCH/000599/2024-2025 |
369 | Murshidabad Division | BILL/01198/2024-2025 | 28/09/2024 | DEBIPROSAD DE (PROP:- SOMNATH DEY) | ORD/000582/2023-2024 | 3317/MURD | 22/10/2023 | Providing FHTC Connection to 870 nos household , Laying of Distribution System, Rising Main for Augmentation work of Rejinagar Zone-II PWSS within Beldanga-II Block under Murshidabad Division , PHE.Dte. ( PART - A) | 36.80 | 480-MSD/2024-25 | 02/10/2024 | VCH/000668/2024-2025 |
370 | Murshidabad Division | BILL/01199/2024-2025 | 28/09/2024 | INDRAJIT MAZUMDAR | ORD/000667/2022-2023 | 3406/MURD | 22/12/2022 | Sinking of 02(Two) Nos 250 mm x 150 mm dia tube well 100.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at SALINDA PWSS at Head Work Site & 2nd Tube Well Site in Bharatpur-II Block under Kandi Sub-Divis | 14.32 | 485-MSD/2024-25 | 02/10/2024 | VCH/000672/2024-2025 |
371 | Murshidabad Division | BILL/01201/2024-2025 | 28/09/2024 | SUJIT KUMAR SAHA | ORD/000527/2022-2023 | 2493/MURD | 30/08/2022 | Formal work order for Augmentation of SURANGAPUR Zone-II / Part-B Ground water based Piped water supply scheme to accommodate FHTC (Functional Household Tap Connection) within Nawda Block of Murshidabad District under Murshidabad Division, PHE.Dte. | 13.29 | 484-MSD/2024-25 | 02/10/2024 | VCH/000671/2024-2025 |
372 | Murshidabad Division | BILL/01215/2024-2025 | 30/09/2024 | R.K. DRILLING SERVICES | ORD/000120/2023-2024 | 1761/MURD | 06/07/2023 | Sinking of 02 (Two) Nos of 300mm x 200 mm dia tube well i.e. TW-I, II, of 120.00 mtr. deep by direct rotary rig method using UPVC Pipe and UPVC Deep Well Screen (RDS) filter at Shibnagar Laskarpur (Zone - I ) Part - A Water Supply Scheme at Head Work | 10.90 | 503-MSD/2024-25 | 04/10/2024 | VCH/000684/2024-2025 |
Total | 15,112.55 |