Sl No. | District
As per Census (2011)
|
Scheme Name
Scheme for which the Work Execution has been initiated
|
Scheme Catgory
Category of Scheme as per PHED-MIS
|
Sanctioned Date
Scheme Sanctioning Date as per PHED-MIS
|
Sanctioned Cost
Implementation Cost Sanctioned for this Scheme as per PHED-MIS
|
Allotment
Allotment Sanctioned for this Scheme as per PHED-MIS
|
Expenditure
Expenditure incurred under this Scheme as per PHED-MIS
|
% Expenditure
Percentage of Expenditure incurred under this Scheme as per PHED-MIS
|
% Physical Progress
Achievement of Physical Progress for this Scheme as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|
78 | 1,18,635.33 | 70,733.57 | 69,952.54 | 58.96 | # | ||||
1 | PASCHIM BARDHAMAN | Augmentation of Amritnagar Zone-II Piped Water Supply Scheme within RCFA Part-II Area under RCFA Division-I PHE Dte. to accommodate FHTC in Raniganj Block Dist-Paschim Bardhaman ,TSM/012742 ,SM/11986 | Augmentation | 01/09/2022 | 997.15 | 829.62 | 829.62 | 83.2 | 90 |
2 | PASCHIM BARDHAMAN | Augmentation of Gopalpur (JJM Revision) Piped Water Supply Scheme within Kanksa Block of Paschim Bardhaman District under Durgapur W/S Division PHe Dte ,TSM/008345 ,SM/09875 | Augmentation | 07/12/2021 | 1,310.24 | 1,097.22 | 1,055.52 | 80.56 | 90 |
3 | PASCHIM BARDHAMAN | Augmentation of ground water based piped W/s scheme for Kanksa (Zone-I) to accommodate FHTC ,Block-Kanksa,Dist-Paschim Bardhaman(WB) ,TSM/009656 ,SM/10208 | Augmentation | 24/02/2022 | 700.46 | 657.75 | 648.15 | 92.53 | 72 |
4 | PASCHIM BARDHAMAN | Augmentation of ground water based piped W/s scheme for Kanksa (Zone-II/Part-A) to accommodate FHTC ,Block-Kanksa,Dist-Paschim Barddhaman(WB) ,TSM/009659 ,SM/10211 | Augmentation | 24/02/2022 | 811.61 | 753.87 | 744.29 | 91.71 | 68 |
5 | PASCHIM BARDHAMAN | Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-B) to accommodate FHTC ,Block-Kanksa,Dist-Paschim Bardhaman (WB) ,TSM/009820 ,SM/10212 | Augmentation | 24/02/2022 | 663.97 | 607.98 | 605.90 | 91.25 | 68 |
6 | PASCHIM BARDHAMAN | Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-C) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) ,TSM/009821 ,SM/10209 | Augmentation | 24/02/2022 | 489.84 | 471.01 | 471.01 | 96.16 | 66 |
7 | PASCHIM BARDHAMAN | Augmentation of ground water based piped W/s Scheme for Kanksa (Zone-II/Part-D) to accommodate FHTC ,Block-Kanksa, Dist-Paschim Bardhaman (WB) ,TSM/009822 ,SM/10210 | Augmentation | 24/02/2022 | 780.77 | 754.57 | 754.48 | 96.63 | 72 |
8 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR AMLAJORA PART - II, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/017220 ,SM/15639 | Augmentation | 17/02/2023 | 989.75 | 572.31 | 572.31 | 57.82 | 40 |
9 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR BAMUNARA, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA,DISTRICT : PASCHIM BARDDHAMAN ,TSM/017310 ,SM/18467 | Augmentation | 20/07/2023 | 1,401.03 | 642.95 | 635.29 | 45.34 | 57 |
10 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR BANAGRAM PART, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/017275 ,SM/16903 | Augmentation | 13/03/2023 | 64.90 | 11.32 | 11.32 | 17.44 | 33 |
11 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR BASUDHA, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/020573 ,SM/18877 | Augmentation | 05/10/2023 | 313.27 | 167.20 | 167.20 | 53.37 | 9 |
12 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR BIRUDIHA, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/017278 ,SM/18824 | Augmentation | 12/09/2023 | 860.00 | 496.95 | 490.77 | 57.07 | 33 |
13 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR BISTUPUR, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/018199 ,SM/18469 | Augmentation | 20/07/2023 | 2,403.30 | 513.73 | 513.73 | 21.38 | 50 |
14 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR DANDESHWAR, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/017279 ,SM/16901 | Augmentation | 13/03/2023 | 340.79 | 173.29 | 173.29 | 50.85 | 45 |
15 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR DHOBARU, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/017277 ,SM/16902 | Augmentation | 13/03/2023 | 94.57 | 82.66 | 74.16 | 78.41 | 34 |
16 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR GARADAHA, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/017283 ,SM/16900 | Augmentation | 13/03/2023 | 98.83 | 53.64 | 53.64 | 54.27 | 49 |
17 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR GARKILLA KHEROBARI, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/017285 ,SM/15659 | Augmentation | 17/02/2023 | 157.71 | 116.77 | 116.77 | 74.04 | 52 |
18 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JATGARIA, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/017244 ,SM/18825 | Augmentation | 12/09/2023 | 306.19 | 75.50 | 66.05 | 21.57 | 34 |
19 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JEMUA, UNDER DURGAPUR W/S DIVISION , BLOCK : DURGAPUR FARIDPUR, DISTRICT : PASCHIM BARDDHAMAN ,TSM/020574 ,SM/18890 | Augmentation | 05/10/2023 | 219.38 | 152.12 | 152.12 | 69.34 | 26 |
20 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR KANCHANPUR, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/020575 ,SM/18888 | Augmentation | 05/10/2023 | 175.30 | 2.23 | 2.23 | 1.27 | 9 |
21 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR KOTALPUKUR, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/017286 ,SM/15663 | Augmentation | 17/02/2023 | 227.43 | 125.73 | 112.60 | 49.51 | 48 |
22 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR NAPARA, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMA ,TSM/017221 ,SM/15657 | Augmentation | 17/02/2023 | 929.97 | 491.84 | 487.35 | 52.41 | 44 |
23 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR SHYAMBAZAR, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/017280 ,SM/18826 | Augmentation | 12/09/2023 | 460.11 | 270.56 | 270.56 | 58.8 | 45 |
24 | PASCHIM BARDHAMAN | AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR TILAKCHANDRAPUR, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/020579 ,SM/18886 | Augmentation | 05/10/2023 | 350.95 | 240.36 | 239.40 | 68.22 | 13 |
25 | PASCHIM BARDHAMAN | AUGMENTATION OF ITAPARA PIPED WATER SUPPLY SCHEME ,TSM/009728 ,SM/10844 | Augmentation | 30/05/2022 | 945.42 | 921.50 | 859.43 | 90.9 | 53 |
26 | PASCHIM BARDHAMAN | Augmentation of Jamgram Piped Water Supply Scheme. ,TSM/010051 ,SM/10643 | Augmentation | 22/04/2022 | 774.12 | 591.90 | 590.93 | 76.34 | 85 |
27 | PASCHIM BARDHAMAN | Augmentation of Jamuria (Rural) (Zone-I) PWSS Block- Jamuria District- Paschim Bardhaman under RCFA Division I PHE Dte. ,TSM/018723 ,SM/15654 | Augmentation | 17/02/2023 | 988.24 | 490.74 | 490.74 | 49.66 | 37 |
28 | PASCHIM BARDHAMAN | Augmentation of Jamuria (Rural) (Zone-II) PWSS. ,TSM/009730 ,SM/10640 | Augmentation | 22/04/2022 | 866.51 | 155.69 | 155.69 | 17.97 | 51 |
29 | PASCHIM BARDHAMAN | Augmentation of Madantor Water Supply Scheme ,TSM/010054 ,SM/10845 | Augmentation | 30/05/2022 | 587.44 | 337.55 | 337.55 | 57.46 | 83 |
30 | PASCHIM BARDHAMAN | Augmentation of Ondal (Phase-I) Water Supply Scheme ,TSM/010055 ,SM/10641 | Augmentation | 22/04/2022 | 887.89 | 711.60 | 711.60 | 80.14 | 46 |
31 | PASCHIM BARDHAMAN | AUGMENTATION OF PANURIA PIPED WATER SUPPLY SCHEME ,TSM/009727 ,SM/10165 | Augmentation | 11/02/2022 | 971.48 | 841.72 | 841.72 | 86.64 | 84 |
32 | PASCHIM BARDHAMAN | AUGMENTATION OF PWSS OF RCFA PART-II (ZONE-3) UNDER RCFA DIVISION-I PHE DTE ,TSM/014885 ,SM/12215 | Augmentation | 07/09/2022 | 898.82 | 742.24 | 742.23 | 82.58 | 50 |
33 | PASCHIM BARDHAMAN | AUGMENTATION OF RCFA (PART III) ZONE II PIPED WATER SUPPLY SCHEME (Complying JJM) . ,TSM/009489 ,SM/12726 | Augmentation | 21/09/2022 | 2,832.34 | 2,049.57 | 2,049.57 | 72.36 | 83 |
34 | PASCHIM BARDHAMAN | Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) ,TSM/009488 ,SM/11454 | Augmentation | 12/07/2022 | 2,799.63 | 2,078.42 | 2,078.33 | 74.24 | 64 |
35 | PASCHIM BARDHAMAN | Augmentation of RCFA Part II Piped Water Supply Scheme Volume -I (Intake, RWRM, WTP, CWRMs & GLRs) under RCFA Division-I PHE Dte. ,TSM/017799 ,SM/18769 | Augmentation | 24/08/2023 | 46,405.37 | 21,051.32 | 20,620.02 | 44.43 | 4 |
36 | PASCHIM BARDHAMAN | Augmentation of RCFA Part II Piped Water Supply Scheme Volume-II (Booster Stations & Allied Works) Under RCFA Division-I PHE Dte. ,TSM/018764 ,SM/18468 | Augmentation | 20/07/2023 | 5,020.98 | 3,360.20 | 3,332.78 | 66.38 | 6 |
37 | PASCHIM BARDHAMAN | Augmentation of Roopganj piped Water Supply Scheme of Kanksa Block under Durgapur W/s Division PHE Dte ,TSM/009032 ,SM/10203 | Augmentation | 24/02/2022 | 943.11 | 748.33 | 726.37 | 77.02 | 97 |
38 | PASCHIM BARDHAMAN | Augmentation of Roshna Piped Water Supply Scheme . ,TSM/010052 ,SM/10642 | Augmentation | 22/04/2022 | 844.67 | 651.43 | 645.15 | 76.38 | 87 |
39 | PASCHIM BARDHAMAN | AUGMENTATION OF SARSHATALI PIPED WATER SUPPLY SCHEME ,TSM/010518 ,SM/10605 | Augmentation | 19/04/2022 | 608.44 | 316.43 | 312.35 | 51.34 | 80 |
40 | PASCHIM BARDHAMAN | AUGMENTATION OF SUB SURFACE WATER BASED PIPED WATER SUPPLY SCHEME FOR ONDAL PHASE II/A TO ACCOMMODATE FHTC ,TSM/011412 ,SM/11575 | Augmentation | 22/07/2022 | 661.28 | 512.62 | 512.62 | 77.52 | 31 |
41 | PASCHIM BARDHAMAN | AUGMENTATION OF SUB SURFACE WATER BASED PIPED WATER SUPPLY SCHEME FOR ONDAL PHASE II/B TO ACCOMMODATE FHTC ,TSM/011404 ,SM/11576 | Augmentation | 22/07/2022 | 808.08 | 678.49 | 678.49 | 83.96 | 30 |
42 | PASCHIM BARDHAMAN | AUGMENTATION OF SUB SURFACE WATER BASED WATER SUPPLY SCHEME FOR KRISHNAPUR, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/020576 ,SM/18887 | Augmentation | 05/10/2023 | 220.53 | 5.54 | 5.54 | 2.51 | 4 |
43 | PASCHIM BARDHAMAN | AUGMENTATION OF SUB SURFACE WATER SUPPLY SCHEME FOR AMRITNAGAR ZONE I WITHIN RCFA PART II AREA UNDER RCFA DIVISION I TO ACCOMMODATE FHTC ,TSM/011402 ,SM/13418 | Augmentation | 02/11/2022 | 904.57 | 591.91 | 591.91 | 65.44 | 61 |
44 | PASCHIM BARDHAMAN | Augmentation of Sub-Surface water based Churulia PWSS. ,TSM/009729 ,SM/11205 | Augmentation | 06/06/2022 | 996.67 | 872.60 | 840.96 | 84.38 | 70 |
45 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014376 ,SM/12219 | Augmentation | 07/09/2022 | 681.87 | 475.66 | 475.66 | 69.76 | 35 |
46 | PASCHIM BARDHAMAN | Augmentation PWSS of RCFA Part-II (Zone - 9 A) ,TSM/013220 ,SM/12221 | Augmentation | 07/09/2022 | 462.00 | 173.37 | 173.37 | 37.53 | 40 |
47 | PASCHIM BARDHAMAN | Augmentation PWSS of RCFA Part-II (Zone - 9 B) ,TSM/013221 ,SM/12225 | Augmentation | 07/09/2022 | 424.86 | 160.31 | 160.31 | 37.73 | 15 |
48 | PASCHIM BARDHAMAN | Augmentation PWSS of RCFA Part-II (Zone - 9) ,TSM/013219 ,SM/12222 | Augmentation | 07/09/2022 | 579.22 | 360.98 | 360.94 | 62.31 | 20 |
49 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-10) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014349 ,SM/12029 | Augmentation | 01/09/2022 | 771.55 | 446.45 | 446.45 | 57.86 | 25 |
50 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-11) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014889 ,SM/12210 | Augmentation | 07/09/2022 | 610.16 | 556.42 | 556.42 | 91.19 | 20 |
51 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-12A) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014350 ,SM/12030 | Augmentation | 01/09/2022 | 991.93 | 571.77 | 571.77 | 57.64 | 20 |
52 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-12B) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014351 ,SM/12031 | Augmentation | 01/09/2022 | 481.52 | 318.45 | 318.45 | 66.13 | 21 |
53 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-13) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014352 ,SM/12032 | Augmentation | 01/09/2022 | 731.25 | 503.94 | 503.94 | 68.91 | 30 |
54 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-14A) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014353 ,SM/12033 | Augmentation | 01/09/2022 | 809.92 | 490.67 | 490.67 | 60.58 | 40 |
55 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-14B) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014354 ,SM/12039 | Augmentation | 01/09/2022 | 587.31 | 177.31 | 177.31 | 30.19 | 40 |
56 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-14C) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014355 ,SM/12040 | Augmentation | 01/09/2022 | 568.70 | 448.13 | 448.13 | 78.8 | 70 |
57 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-15) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014356 ,SM/12041 | Augmentation | 01/09/2022 | 896.96 | 397.71 | 397.71 | 44.34 | 20 |
58 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-16) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014357 ,SM/12042 | Augmentation | 01/09/2022 | 831.03 | 656.71 | 656.71 | 79.02 | 50 |
59 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-17) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014890 ,SM/12218 | Augmentation | 07/09/2022 | 878.95 | 648.61 | 648.61 | 73.79 | 60 |
60 | PASCHIM BARDHAMAN | Augmentation PWSS Of RCFA Part-II (Zone-18) Under RCFA Division-I Phe Dte. ,TSM/014878 ,SM/12220 | Augmentation | 07/09/2022 | 754.70 | 603.82 | 603.82 | 80.01 | 55 |
61 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-19) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014880 ,SM/12216 | Augmentation | 07/09/2022 | 868.69 | 543.33 | 543.33 | 62.55 | 20 |
62 | PASCHIM BARDHAMAN | Augmentation PWSS of RCFA Part-II (Zone-1A) Block - Andal, Dist - Paschim Bardhaman ,TSM/012782 ,SM/12227 | Augmentation | 07/09/2022 | 543.54 | 324.26 | 324.26 | 59.66 | 20 |
63 | PASCHIM BARDHAMAN | Augmentation PWSS of RCFA Part-II (Zone-2) Block - Andal, Dist - Paschim Bardhaman ,TSM/012791 ,SM/12223 | Augmentation | 07/09/2022 | 833.27 | 665.07 | 665.07 | 79.81 | 16 |
64 | PASCHIM BARDHAMAN | Augmentation PWSS of RCFA Part-II (Zone-2A) Block - Andal, Dist - Paschim Bardhaman ,TSM/012792 ,SM/12226 | Augmentation | 07/09/2022 | 440.82 | 229.41 | 229.41 | 52.04 | 25 |
65 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-5) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014345 ,SM/12025 | Augmentation | 01/09/2022 | 901.05 | 512.54 | 512.54 | 56.88 | 20 |
66 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-6) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014346 ,SM/12026 | Augmentation | 01/09/2022 | 910.23 | 429.47 | 429.47 | 47.18 | 20 |
67 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-7) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014347 ,SM/12027 | Augmentation | 01/09/2022 | 818.76 | 392.97 | 392.97 | 48 | 35 |
68 | PASCHIM BARDHAMAN | AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. ,TSM/014348 ,SM/12028 | Augmentation | 01/09/2022 | 530.12 | 307.32 | 307.32 | 57.97 | 20 |
69 | PASCHIM BARDHAMAN | Augmentation PWSS of RCFA Part-II (Zone-I) Block-Andal, Dist-Paschim Bardhaman ,TSM/012768 ,SM/12224 | Augmentation | 07/09/2022 | 689.44 | 407.93 | 407.93 | 59.17 | 18 |
70 | PASCHIM BARDHAMAN | Augmentation work for providing House to House Connection from existing distribution system for Nuni and Adjoining Mouzas and Panchgachi Zone Piped Water Supply Scheme . ,TSM/009668 ,SM/10144 | Augmentation | 09/02/2022 | 25.60 | 25.02 | 25.02 | 97.75 | 0 |
71 | PASCHIM BARDHAMAN | AUGUMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR TELIPARA, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN ,TSM/017281 ,SM/16250 | Augmentation | 24/02/2023 | 638.71 | 308.01 | 308.01 | 48.22 | 51 |
72 | PASCHIM BARDHAMAN | Improvement of RCFA (Part-I) Piped Water Supply Scheme. ,TSM/004718 ,SM/09916 | Augmentation | 10/12/2021 | 11,874.12 | 11,105.30 | 11,055.03 | 93.1 | 84 |
73 | PASCHIM BARDHAMAN | Providing and Installation of Pumping Machineries, PDB CUM MCC Panel, Substation Equipments and other Accessories at Head Works Site under RCFA-III (Zone-I) Water Supply Scheme, Block:- Faridpur-Durgapur, Dist:- Paschim Bardhaman. ,TSM/020338 ,SM/16775 | Augmentation | 13/03/2023 | 198.21 | 136.29 | 136.29 | 68.76 | 20 |
74 | PASCHIM BARDHAMAN | Providing and Installation of Sub-Station equipments and other accessories ar Amritnagar Zone-II Water Supply Scheme within RCFA Part-II area, Block: Raniganj, Dist: Paschim Bardhaman. ,TSM/020344 ,SM/16777 | Augmentation | 13/03/2023 | 204.12 | 145.59 | 145.59 | 71.33 | 30 |
75 | PASCHIM BARDHAMAN | Providing and Installation of Substation Equipments and other Accessories at Ramnagar Head WOrks site under RCFA Part-III (Zone-II) Water Supply Scheme, Block:- Pandabeshwar, Dist:- Paschim Bardhaman. ,TSM/020567 ,SM/18889 | Augmentation | 05/10/2023 | 250.38 | 0.05 | 0.05 | 0.02 | 5 |
76 | PASCHIM BARDHAMAN | SOURCE AUGMENTATION OF OCP WATER BASED WATER SUPPLY SCHEME FOR KAJORA AND ITS ADJOINING AREAS TO ACCOMMODATE FHTC IN ONDAL BLOCK, DISTRICT - PASCHIM BARDHAMAN ,TSM/015956 ,SM/14888 | Augmentation | 03/02/2023 | 882.66 | 497.41 | 497.41 | 56.35 | 45 |
77 | PASCHIM BARDHAMAN | Source Augmentation of RCFA Part-II Water Supply Scheme by installing Riverbed Tube-well under RCFA Division-I PHE Dte. ,TSM/020833 ,SM/18891 | Augmentation | 05/10/2023 | 941.12 | 200.79 | 169.31 | 17.99 | 40 |
78 | PASCHIM BARDHAMAN | Sub-surface Water Based Water Supply Scheme for Bagdiha and its adjoining areas to Accommodate FHTC in Jamuria Block, District - Paschim Bardhaman ,TSM/013416 ,SM/13416 | Augmentation | 02/11/2022 | 909.45 | 441.53 | 441.53 | 48.55 | 27 |
Total | 1,18,635.33 | 70,733.57 | 69,952.54 | 58.96 | # |