Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Showing 1 to 186 of 186 entries
Sl No.District
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrustedName of JE entrustedWO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
186 2,536.811,041.07 
Sl No.
District
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted
Name of JE entrusted
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
186
2,536.81
1,041.07
 
Total
2,536.83
1,041.10
 
1 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system at Chamrail Gram panchyet under Bally Jagachha Block under Howrah Division, PHE Dte. (Part-G) No. of House Hold= 110 nos. AE HQ 2286/HD 10/12/2021 30 GHOSH ENTERPRISE. 4.78 4.63 0
2 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system at Chamrail Gram panchyet under Bally Jagachha Block under Howrah Division, PHE Dte. (Part-D) No. of House Hold= 110 nos. AE HQ 2283/HD 10/12/2021 30 APEX ENGINEERING 4.74 4.67 0
3 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system at Chamrail Gram panchyet under Bally Jagachha Block under Howrah Division, PHE Dte. (Part-F) No. of House Hold= 110 nos. AE HQ 2285/HD 10/12/2021 30 SUNIL ENTERPRISE 4.74 4.54 0
4 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system at Chamrail Gram panchyet under Bally Jagachha Block under Howrah Division, PHE Dte.(Part-A) No. of House Hold= 110 nos. AE HQ 2280/HD 10/12/2021 30 N. G ENGINEERING 4.76 4.64 0
5 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system at Chamrail Gram panchyet under Bally Jagachha Block under Howrah Division, PHE Dte. (Part-C) No. of House Hold= 110 nos. AE HQ 2282/HD 10/12/2021 30 S.B. ENTERPRISE 4.74 4.63 0
6 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system at Chamrail Gram panchyet under Bally Jagachha Block under Howrah Division, PHE Dte. (Part-E) No. of House Hold= 110 nos. AE HQ 2284/HD 10/12/2021 30 DEBABRATA CHAKRABORTY 4.74 4.53 0
7 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system at Chamrail Gram panchyet under Bally Jagachha Block under Howrah Division, PHE Dte. (Part-B) No. of House Hold= 110 nos. AE HQ 2281/HD 10/12/2021 30 M/S ASHIRBAD (INDIA) 4.76 4.65 0
8 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Jagadispur Gram panchyet under Bally Jagachha Block under Howrah Division, PHE Dte. (Part-G) No. of House Hold(Approx)= 3500 nos. AE HQ 1315/HD 24/06/2021 45 VISHAL CONSTRUCTION CO. 159.44 266.72 0
9 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS Uncovered Bally Jagacha W/143 09/08/2021 0 PRADIP KUMAR JATI 29.38 0.00 0
10 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Uncovered Bally Jagach W/159-160 19/08/2021 0 MAA TARA CONSTRUCTION 16.77 0.00 0
11 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project Bally Jagacha Block W/362 07/10/2021 0 GHOSH ENTERPRISE. 4.80 0.00 0
12 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project Bally Jagacha Block BP-2021-22-182 07/10/2021 0 GHOSH ENTERPRISE. 4.14 0.00 0
13 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block W/104 19/07/2021 0 SAIKAT ENTERPRISE 3.49 0.00 0
14 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block W/118, 119 19/07/2021 0 N. G ENGINEERING 5.52 0.00 0
15 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block W/112 20/07/2021 0 UNIVERSAL CONSTRUCTION 3.89 0.00 0
16 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Uncoverd Bally jagacha W/250 19/08/2021 0 ABONTICA ENTERPRISE 3.22 0.00 0
17 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Uncoverd Bally Jagcha W/229-233 19/08/2021 0 SUSHANTA MONDAL 7.82 0.00 0
18 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project Bally Jagacha Block W/368 07/10/2021 0 MA TARA CONSTRUCTION 4.81 0.00 0
19 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Retrofitting Bally Jagacha 28/06/2021 0 S.B. ENTERPRISE 12.29 0.00 0
20 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered araes of Surface Water Based Water Supply Project for Bally Jagacha Block W/106 19/07/2021 0 SAIKAT ENTERPRISE 3.84 0.00 0
21 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block W/105 19/07/2021 0 S.M. CONSTRUCTION 3.39 0.00 0
22 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS Uncovered Bally Jagacha Surface Water Based Water Supply Project Bally Jagacha block W/149-153 09/08/2021 0 S.B. ENTERPRISE 12.29 0.00 0
23 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Based Water Supply Project Bally Jagach Block W/400 11/10/2021 0 M/S. SREE HARI CONSTRUCTION 3.33 0.00 0
24 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project Bally Jagacha Block BP-2021-22-187 07/10/2021 0 SAIKAT ENTERPRISE 4.48 0.00 0
25 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS uncovered Bally Jagacha W/137-142 09/08/2021 0 USHA CONCERN 20.51 0.00 0
26 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS Uncovered area Surface Water Based Water supply Project Bally Jagacha Block W/164 09/08/2021 0 PRAGATI CONSTRUCTION & CO 18.44 0.00 0
27 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS Uncovered Bally Jagacha 03/06/2021 0 MAA TARA CONSTRUCTION 16.77 0.00 0
28 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project Bally Jagacha Block BP-2021-22-217 11/10/2021 0 N.N. CONSTRUCTION 3.54 0.00 0
29 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project Bally Jagacha Block BP-2021-22-186 07/10/2021 0 SK ENTERPRISE 4.84 0.00 0
30 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Uncovered bally jagcha W/249 19/08/2021 0 ABONTICA ENTERPRISE 1.94 0.00 0
31 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project Bally Jagacha Block W/365 07/10/2021 0 GHOSH ENTERPRISE. 4.78 0.00 0
32 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project Bally Jagacha Block W/370 07/10/2021 0 MA TARA CONSTRUCTION 4.66 0.00 0
33 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project Bally Jagacha Block W/364 07/10/2021 0 GHOSH ENTERPRISE. 4.83 0.00 0
34 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Scheme Bally Jagacha Block 107-111 113-117 20/07/2021 0 ADITYA HAZRA 25.50 0.00 0
35 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Uncovered bally jagcha W/251 19/08/2021 0 ABONTICA ENTERPRISE 1.59 0.00 0
36 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Uncoverd Bally Jagcha W/228 19/08/2021 0 ASHOKE ENGINEERING WORKS 4.47 0.00 0
37 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project Bally Jagacha Block W/366 07/10/2021 0 GHOSH ENTERPRISE. 4.81 0.00 0
38 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project Bally Jagacha Block BP-2021-22-184 07/10/2021 0 SK ENTERPRISE 2.21 0.00 0
39 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS of uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block W/99-103 19/07/2021 0 MITHU BUILDERS 16.75 0.00 0
40 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered area of Surface Water Based Water supply project for Bally Jagacha Block W/133-136 09/08/2021 0 NIRMAL UDYOG 13.94 0.00 0
41 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Uncovered bally jagcha W/252 19/08/2021 0 SUSHANTA MONDAL 1.03 0.00 0
42 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting LDS in the uncovered areas of Surface Water Based Water Supply Project Bally Jagacha Block W/363 07/10/2021 0 GHOSH ENTERPRISE. 4.37 0.00 0
43 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Supply of different types of Specials for conveyance of Treated Water from Off Take Point (Phase-I) to GLR (Phase-II) and LDS at Zone-1&2 under Bally-Jagacha (Phase-II) Surface based water supply Project under Howrah Division PHE Dte. (Part-B) AE HQ 416/HD 11/02/2021 15 GHOSH ENTERPRISE. 4.50 6.34 0
44 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Supply of different types of Specials for conveyance of Treated Water from Off Take Point (Phase-I) to GLR (Phase-II) and LDS at Zone-1&2 under Bally-Jagacha (Phase-II) Surface based water supply Project under Howrah Division PHE Dte. 418/HD 11/02/2021 15 GHOSH ENTERPRISE. 1.16 0.83 0
45 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Cutting of concrete road with restoration of concrete road for laying of UPVC Pipe (90 mm dia) Zone-I of surface water based water supply Project (Phase-II) for Bally Jagacha Block under Howrah Division PHE Dte. (Length of Road = 1300 m) (Part-6) 334/HD 05/02/2021 10 SK ENTERPRISE 4.26 2.41 0
46 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Cutting of concrete road with restoration of concrete road for laying of UPVC Pipe (90 mm dia) Zone-II of surface water based water supply Project (Phase-II) for Bally Jagacha Block under Howrah Division PHE Dte. (Length of Road = 1300 Mtr) (Part-3) 341/HD 05/02/2021 10 SK ENTERPRISE 4.21 3.05 0
47 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Cutting of concrete road with restoration of concrete road for laying of UPVC Pipe (90 mm dia) Zone-II of surface water based water supply Project (Phase-II) for Bally Jagacha Block under Howrah Division PHE Dte. (Length of Road = 1250Mtr) (Part-4) 342/HD 05/02/2021 10 SK ENTERPRISE 4.05 3.30 0
48 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Chakpara. G.P Area) Zone-10 Length= 539.00mtr.(PART-C) 1104/HD 25/09/2020 30 PRADIP KUMAR JATI 4.04 0.00 0
49 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Supply of different types of Specials for conveyance of Treated Water from Off Take Point (Phase-I) to GLR (Phase-II) and LDS at Zone-1&2 under Bally-Jagacha (Phase-II) Surface based water supply Project under Howrah Division PHE Dte. (Part-A) AE HQ 415/HD 11/02/2021 15 MA TARA CONSTRUCTION 4.68 4.83 0
50 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Barbed wire fencing with angle for Boundary wall & 450mm dia Sluice valve chamber at Lakhanpur CWR site & Raghabpur site of Bally jagacha (phase-II) Surface based water supply scheme under Howrah Division P.H.E. Dte. AE HQ 541/HD 25/02/2021 30 SK ENTERPRISE 3.56 0.76 0
51 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Chamrail G.P Area) Zone-12 &13 Length= 660.00mtr.(PART-4) 513/HD 25/02/2021 30 MENOKA ENGINEERING WORKS 3.65 2.41 0
52 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Chamrail G.P Area) Zone-12 &13 Length= 649.00mtr.(PART-5) 514/HD 25/02/2021 30 MENOKA ENGINEERING WORKS 3.51 2.37 0
53 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Restoration of road in uncovered areas in Zone-1 & 2. under Bally Jagacha (Phase-II) Surface based water supply Project under Howrah Division PHE Dte. Howrah Length- 750m. (Part-I) 1368/HD 29/06/2021 30 SK ENTERPRISE 4.33 3.42 0
54 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Chamrail G.P Area) Zone-12 &13 Length= 732.00mtr.(PART-6) 515/HD 25/02/2021 30 MENOKA ENGINEERING WORKS 4.22 2.62 0
55 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Survey & collection of household details through mobile app and geo tagging (JJM entry) of the same of water tap connection in each household from existing distribution system at Chakpara Anandanagar Gram Panchayet under Bally Jagacha Block under Howrah Division PHE Dte (Part-F) No of Household (Approx)= 5000 nos AE HQ 2388/HD 27/12/2021 30 MAHAVIR PUMPS MFG.PVT.LTD 2.48 2.48 0
56 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Survey & collection of household details through mobile app and geo tagging (JJM entry) of the same of water tap connection in each household from existing distribution system at Jagadishpur Gram Panchayet under Bally Jagacha Block under Howrah Division PHE Dte (Part-G) No of Household (Approx)= 3500 nos AE HQ 2389/HD 27/12/2021 30 VISHAL CONSTRUCTION CO. 1.74 1.74 0
57 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Survey & collection of household details through mobile app and geo tagging (JJM entry) of the same of water tap connection in each household from existing distribution system at Nischinda Gram Panchayet under Bally Jagacha Block under Howrah Division PHE Dte (Part-A) No of Household (Approx)= 4500 nos AE HQ 2384/HD 27/12/2021 30 JDJ ENTERPRISE (A UNIT OF JDJ TRADERS PRIVATE LIMITED) 2.24 2.06 0
58 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system at Bally Gram Panchyet under Bally Jagachha Block under Howrah Division, PHE Dte. No. of House Hold= 5000 nos. AE HQ 57/HD 10/01/2022 150 N. G ENGINEERING 167.83 62.04 0
59 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Survey & collection of household details through mobile app and geo tagging (JJM entry) of the same of water tap connection in each household from existing distribution system at Duegapur-Abhoynagar-II Gram Panchayet under Bally Jagacha Block under Howrah Division PHE Dte (Part-D) No of Household (Approx)= 4500 nos AE HQ 2387/HD 27/12/2021 30 ALOK ENTERPRISE 2.24 1.40 0
60 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Survey & collection of household details through mobile app and geo tagging (JJM entry) of the same of water tap connection in each household from existing distribution system at Sapuipara Basukati Gram Panchayet under Bally Jagacha Block under Howrah Division PHE Dte (Part-B) No of Household (Approx)= 5500 nos AE HQ 2385/HD 27/12/2021 30 JAYANTA KUMAR MONDAL 2.73 0.00 0
61 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Survey & collection of household details through mobile app and geo tagging (JJM entry) of the same of water tap connection in each household from existing distribution system at Chamrail Gram Panchayet under Bally Jagacha Block under Howrah Division PHE Dte (Part-1) No of Household (Approx)= 850 nos AE HQ 2390/HD 27/12/2021 30 M/S ASHIRBAD (INDIA) 0.42 0.42 0
62 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Survey & collection of household details through mobile app and geo tagging (JJM entry) of the same of water tap connection in each household from existing distribution system at Chamrail Gram Panchayet under Bally Jagacha Block under Howrah Division PHE Dte (Part-2) No of Household (Approx)= 850 nos AE HQ 2391/HD 27/12/2021 30 S.B. ENTERPRISE 0.42 0.42 0
63 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Survey & collection of household details through mobile app and geo tagging (JJM entry) of the same of water tap connection in each household from existing distribution system at Chamrail Gram Panchayet under Bally Jagacha Block under Howrah Division PHE Dte (Part-3) No of Household (Approx)= 850 nos AE HQ 2392/HD 27/12/2021 30 N. G ENGINEERING 0.42 0.42 0
64 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Survey & collection of household details through mobile app and geo tagging (JJM entry) of the same of water tap connection in each household from existing distribution system at Chamrail Gram Panchayet under Bally Jagacha Block under Howrah Division PHE Dte (Part-4) No of Household (Approx)= 950 nos AE HQ 2393/HD 27/12/2021 30 GHOSH ENTERPRISE. 0.47 0.47 0
65 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Construction of MS Pipe Line at Lakshmanpur Boosting Station Site under Bally Jagacha Surface Based Water Supply Project (Phase-II) under Howrah Division, PHE Dte. AE HQ 306/HD 15/02/2022 20 GHOSH ENTERPRISE. 3.05 0.00 0
66 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Chakpara Anandanagar G.P Area) Zone-9/10 Length= 809.00mtr.(PART-1)(Near Burma colony) AE HQ 653/HD 23/03/2022 30 PRADIP KUMAR JATI 3.05 3.03 0
67 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Chakpara Anandanagar G.P Area) Zone-9/10 Length= 913.00mtr. (PART-4) AE HQ 656/HD 23/03/2022 30 MAA TARA CONSTRUCTION 2.94 2.92 0
68 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Bally G.P Area) Zone-6A & 7 Length= 715.00mtr.(PART-3)(Location Bally near 7no pole) AE HQ 657/HD 23/03/2022 30 SAIKAT ENTERPRISE 3.32 3.22 0
69 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Bally G.P Area) Zone-6A & 7 Length= 385.00mtr.(PART-4)(Location Bally Ghosh para) AE HQ 658/HD 23/03/2022 30 SAIKAT ENTERPRISE 2.08 2.03 0
70 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Chakpara Anandanagar G.P Area) Zone-9/10 Length= 792.00mtr.(PART-2)(Near Chakpara Milony club) AE HQ 654/HD 23/03/2022 30 PRADIP KUMAR JATI 3.18 2.63 0
71 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Withdrawing & relaying in the damaged part of pipeline for extension of Saorapotakhal(From Anandanagar sitala tala to Jhautala more) at Chakpara Anandanagar G.P. areas of Surface water based water supply project for Bally-Jagacha block,(Phase-1) under Howrah Division PHE Dte. Zone-9( N.P-197 to 15) Length= 1600.00mtr. AE/SADAR 476/HD 04/03/2022 45 S.B. ENTERPRISE 15.39 5.57 0
72 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Supply of Materials at Lakshmanpur Boosting Station Site under Bally Jagacha Surface based water supply project (Phase-II) under Howrah Division, PHE Dte. AE HQ 698/HD 24/03/2022 15 SK ENTERPRISE 1.69 1.59 0
73 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Chakpara Anandanagar G.P Area) Zone-9/10 Length= 440.00mtr.(PART-5)(Near Chakpara Market & Khal par) AE HQ 652/HD 23/03/2022 30 BISWAJIT SAMANTA 2.49 2.11 0
74 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Chakpara Anandanagar G.P Area) Zone-9/10 Length= 796.00mtr.(PART-3)(Near Anandanagar khal par) AE HQ 655/HD 23/03/2022 30 MAA TARA CONSTRUCTION 3.15 3.14 0
75 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Sapuipara Basukati G.P Area) Zone-7,8 Length= 736.00mtr.(PART-J) AE HQ 1179/HD 30/09/2020 30 NIRMAL UDYOG 4.50 1.76 0
76 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Material Requisition To Resource Division 2113/HD 09/11/2022 0 Resource Division 61.60 0.00 0
77 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Durgapur Abhoy Nagar-2. Grampanchyet under bally jagachha Block under Howrah Division, PHE Dte. (Part-D) No. of House Hold(Approx)= 4500 nos BP-2021-22-350 28/02/2022 0 ALOK ENTERPRISE 76.01 0.00 0
78 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Chamrail G.P Area) Zone-12 &13 Length= 743.00mtr.(PART-8) BP-2021-22-342 28/02/2022 0 M/S ASHIRBAD (INDIA) 3.21 0.00 0
79 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system at Bally Gram Panchyet under Bally Jagachha Block under Howrah Division, PHE Dte. No. of House Hold= 5000 nos. BP-2021-22-478 27/03/2022 0 N. G ENGINEERING 68.32 0.00 0
80 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Indent of materials BP-2021-22-309 02/02/2022 0 EXECUTIVE ENGINNER RESOURCES DIVISION 36.59 0.00 0
81 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Chamrail G.P Area) Zone-12 &13 Length= 732.00mtr. (PART-1) BP-2021-22-346 03/03/2022 0 N. G ENGINEERING 3.43 0.00 0
82 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Sapuipara G.P Area) Zone-7/8 Length= 1100.00mtr.(PART-2) BP-2021-22-456 26/03/2022 0 CHOWDHUARY & CO 3.48 0.00 0
83 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Chamrail G.P Area) Zone-12 &13 Length= 737.00mtr.(PART-2) BP-2021-22-345 28/02/2022 0 N. G ENGINEERING 3.26 0.00 0
84 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Chamrail Gram panchyet under ballyjagachha Block under Howrah Division, PHE Dte. (Part-4) No. of House Hold= 950 nos. BP-2021-22-351 28/02/2022 0 GHOSH ENTERPRISE. 13.09 0.00 0
85 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Sapuipara Basukati Gram panchyetunder Bally Jagachha Block under Howrah Division, PHE Dte. (Part-B) No. of House Hold(Approx)= 5500 nos. W/796 03/03/2022 0 JAYANTA KUMAR MONDAL 24.79 0.00 0
86 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Chamrail Gram panchyet under ballyjagachha Block under Howrah Division, PHE Dte. (Part-1) No. of House Hold= 850 nos. BP-2021-22-348 28/02/2022 0 MENOKA ENGINEERING WORKS 34.94 0.00 0
87 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Sapuipara Basukati Gram panchyetunder Bally Jagachha Block under Howrah Division, PHE Dte. (Part-B) No. of House Hold(Approx)= 5500 nos. BP-2022-23-28 11/05/2022 0 JAYANTA KUMAR MONDAL 2.73 0.00 0
88 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Chamrail Gram panchyet under ballyjagachha Block under Howrah Division, PHE Dte. (Part-2) No. of House Hold= 850 nos. BP-2021-22-347 28/02/2022 0 M/S ASHIRBAD (INDIA) 34.95 0.00 0
89 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Durgapur Abhoy Nagar-1. Gram panchyet under bally jagachha Block under Howrah Division, PHE Dte. (Part-C) No. of House Hold(Approx)= 4000 nos. BP-2021-22-419 21/03/2022 0 GHOSH CONCERN 39.01 0.00 0
90 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Sapuipara G.P Area) Zone-7/8 Length= 1100.00mtr.(PART-1) BP-2021-22-455 26/03/2022 0 CHOWDHUARY & CO 3.51 0.00 0
91 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Chakpara Gram panchyet under BallyJagachha Block under Howrah Division, PHE Dte. (Part-F) No. of House Hold(Approx)=5000 nos. BP-2021-22-485 30/03/2022 0 MAHAVIR PUMPS MFG.PVT.LTD 10.99 0.00 0
92 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Chamrail G.P Area) Zone-12 &13 Length= 738.00mtr.(PART-9) BP-2021-22-341 28/02/2022 0 M/S ASHIRBAD (INDIA) 0.23 0.00 0
93 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Railway permission BP-2022-23-84 23/06/2022 0 EASTERN RAILWAY, HOWRAH DIVISION 9.05 0.00 0
94 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Chamrail G.P Area) Zone-12 &13 Length= 743.00mtr.(PART-3) BP-2021-22-344 28/02/2022 0 N. G ENGINEERING 3.23 0.00 0
95 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Special repairing works in different location( at Lock down period) in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Bally G.P Area) Zone-6A, 6B.Length=66m. BP-2022-23-31 11/05/2022 0 CONSCORP 0.48 0.00 0
96 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Durgapur Abhoy Nagar-1. Gram panchyet under bally jagachha Block under Howrah Division, PHE Dte. (Part-C) No. of House Hold(Approx)= 4000 nos. BP-2021-22-323 18/02/2022 0 GHOSH CONCERN 116.13 0.00 0
97 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Nischinda Gram panchyet under BallyJagachha Block under Howrah Division, PHE Dte. (Part-A) No. of House Hold(Approx)=4500 nos. BP-2021-22-360 28/02/2022 0 JDJ ENTERPRISE (A UNIT OF JDJ TRADERS PRIVATE LIMITED) 104.97 0.00 0
98 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Chamrail Gram panchyet under ballyjagachha Block under Howrah Division, PHE Dte. (Part-3) No. of House Hold= 850 nos BP-2021-22-349 28/02/2022 0 N. G ENGINEERING 34.98 0.00 0
99 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Working area Development for Administrative Building (At Salap Zone-VII) for Surface Water Based Water Supply Scheme Bally Jagacha (Phase-II) under Howrah Division, PHE Dte. AE HQ 2276/HD 10/12/2021 21 KRISHNA CONSTRUCTION 3.13 3.13 0
100 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying distribution system in the uncovered areas of Surface Water Based Project for Bally-Jagacha block under Howrah Division, PHE Dte (Chakpara, G.P. Area) Zone-10 Length=900.00mtr. AE HQ 2272/HD 10/12/2021 30 USHA CONCERN 2.94 0.91 0
101 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Dismantling of concrete road for laying of pipe line in Zone-4 under Bally Jagacha (Phase-II) Surface based water supply Project under Howrah Division, PHE Dte. (Part-A) AE HQ 1139/HD 27/05/2022 20 A.G.S ENTERPRISE 1.64 0.00 0
102 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Dismantling of concrete road for laying of pipe line in Zone-4 under Bally Jagacha (Phase-II) Surface based water supply Project under Howrah Division, PHE Dte. (Part-B) AE HQ 1140/HD 27/05/2022 20 A.G.S ENTERPRISE 1.57 0.00 0
103 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Detail study of existing Bally Jagacha Surface Based Water Supply Scheme (Phase-1) to develop Innovative Sustainable Solutions which are field relevant and address the challenges faced by the consumer, under Howrah Division, PHE Dte. AE HQ 2211/HD 02/11/2022 90 AJIVAM WATER PRIVATE 34.09 34.09 100
104 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Measuring water flow of pipe under the ground level by portable flow meter (Endress & Hauser make) after thorough cleaning the outer surface of the pipe line and installing the measuring device as per manufacturer¿s procedure including mobilization of portable flow meter by hired vehicle at point to point engaging skilled technician and labours for pipe line size up to 450mm to 900mm diameter. AE HQ 2054/HD 28/09/2022 15 EASTERN INDIA SALES & SERVICE 0.28 0.28 0
105 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Measuring water flow of pipe under the ground level by portable flow meter (Endress & Hauser make) after thorough cleaning the outer surface of the pipe line and installing the measuring device as per manufacturer¿s procedure including mobilization of portable flow meter by hired vehicle at point to point engaging skilled technician and labours for pipe line size up to 400mm diameter. AE HQ 2009/HD 27/09/2022 15 EASTERN INDIA SALES & SERVICE 1.26 1.26 0
106 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Construction of Boundary Wall at Tube Well Site of Chakpara Anandanagar Football Ground under Bally Jagacha surface based Water Supply scheme(Phase-1) under Howrah Division, P.H.E. Dte.(12M X12M) AE HQ je2_pdd1 569/HD 13/02/2023 30 FUTURE CONSTRUCTION 3.98 0.00 0
107 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Restoration of road damaged for providing FHTC Works in Nischinda G.P in Bally Jagacha Block under Howrah Division, PHE Dte. (Part-C) AE HQ 1891/HD 15/09/2022 10 M/S HOWRAH CONSTRUCTION 4.53 4.33 0
108 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Interconnection from Tube well to Distribution line at Chakpara site in Bally Jagacha surface based Water Supply scheme(Phase-1) under Howrah Division, P.H.E. Dte. AE HQ je2_pdd1 573/HD 13/02/2023 30 S.B. ENTERPRISE 1.68 0.00 0
109 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Land Development for Approach to OHR Site at Narna Zone-V of Surface water supply scheme Bally Jagacha (Phase-II) under Howrah Division, PHE Dte. AE HQ 2819/HD 03/08/2023 15 GUPTA ENTERPRISE 0.79 0.00 0
110 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Special repairing works in different location( at Lock down period) in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(Nischinda G.P Area) Zone-6A, 6B. AE HQ 1172/HD 30/09/2020 30 MENOKA ENGINEERING WORKS 1.27 1.27 0
111 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Nischinda Gram panchyet under Bally Jagachha Block under Howrah Division, PHE Dte. (Part-A) No. of House Hold(Approx)=4500 nos. AE HQ 1310/HD 24/06/2021 45 JDJ ENTERPRISE A UNIT OF JDJ TRADERS PRIVATE LIMITED 68.97 68.97 0
112 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Sapuipara Basukati Gram panchyet under Bally Jagachha Block under Howrah Division, PHE Dte. (Part-B) No. of House Hold(Approx)= 5500 nos. AE HQ 1311/HD 24/06/2021 45 JAYANTA KUMAR MONDAL 204.66 204.66 0
113 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Durgapur Abhoy Nagar-2. Gram panchyet under bally jagachha Block under Howrah Division, PHE Dte. (Part-D) No. of House Hold(Approx)= 4500 nos AE HQ 1313/HD 24/06/2021 45 ALOK ENTERPRISE 37.12 37.12 0
114 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Jagadispur Gram panchyet under Bally Jagachha Block under Howrah Division, PHE Dte. No of House hold-1600 Nos AE HQ 2429/HD 29/12/2021 45 N. G ENGINEERING 51.86 51.86 0
115 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Remaining part of laying distribution system of Pipe water supply at Zone-III/IV.(pal para,mondal para, kote para, Rupnagar)for Surface water based water supply project for Bally-Jagacha(PH-II), under Howrah Division, PHE Dte.(Part-B). JE Sadar 817/HD 08/04/2022 30 M/S MOINAK POREL 1.11 0.00 100
116 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Withdrawing & relaying distribution system pipe line from Makaltala to Bally station (N.P.- 155 to 4) in the uncovered areas of Surface water based water supply project for Bally Jagacha block, under Howrah Division PHE Dte.(D.A-1 G.P Area) Zone-5 Length= 1.05km.nos. AE HQ 818/HD 08/04/2022 30 BISWAJIT SAMANTA 7.25 4.63 100
117 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Sinking of 2 (two) nos PVC big dia Tube well 300 mm x 200 mm dia of 240 mtr deep near i)Chamrail OHR Site Zone-13 & ii) Bally Jagacha Block Office OHR Site Zone-12 under Bally-Jagacha Surface Based W/S scheme(Phase-I) under Howrah Division P.H.E Dte. AE HQ 1597/HD 01/08/2022 30 MUNSHI ENTERPRISE 25.21 25.21 0
118 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Laying distribution system in the uncovered areas of Surface water based water supply project for Bally-Jagacha block, under Howrah Division PHE Dte.(D.A -2. G.P Area) Zone-1. Length= 55.00 mtr. AE HQ 1867/H.D 12/09/2022 10 SKYLINE CONSTRUCTION 0.40 0.40 0
119 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Interconnection from Existing Tube well to Distribution line at Baigachi (Zone-14) in Bally Jagacha surface based Water Supply scheme(Phase-1) under Howrah Division, P.H.E. Dte. AE HQ 516/HD 09/02/2023 30 SUNIL ENTERPRISE 1.24 1.24 100
120 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Interconnection from Tube well to Jagadispur OHR in Bally Jagacha surface based Water Supply scheme(Phase-1) under Howrah Division, P.H.E. Dte. AE HQ 574/HD 13/02/2023 30 S.B. ENTERPRISE 1.27 1.27 100
121 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Construction of Clorination Room ( 5.40m x 3.60 m) at Bhaskur Zone-III OHR Site under Bally jagacha(phase-2) surface Based water supply project under Howrah Division, P.H.E. Dte. at Lakhanpur CWR Site under Bally jagacha(phase-2) surface Based water supply project under Howrah Division, P.H.E. Dte. AE HQ 515/HD 09/02/2023 60 KUNDU CONSTRUCTION 5.82 0.00 100
122 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Interconnection from Tube well to Bally jagacha OHR in Bally Jagacha surface based Water Supply scheme(Phase-1) under Howrah Division, P.H.E. Dte. AE HQ 572/HD 13/02/2023 30 MA-DURGA ENTERPRISE 0.74 0.74 100
123 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1 (One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer for Bally-Jagacha Surface Based Piped Water Supply Scheme. Government of West Bengal (for two months from 01/09/2023 to 31/10/2023) under Howrah Division, PHE Dte.. Assistant Engineer/IU III 3134/HD 29/08/2023 61 INDRAJIT GHOSAL 0.54 0.54 30
124 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Durgapur Abhoy Nagar-1. Gram panchyet under bally jagachha Block under Howrah Division, PHE Dte. (Part-C) No. of House Hold(Approx)= 4000 nos. AE HQ 1312/HD 24/06/2021 45 GHOSH CONCERN 12.56 12.56 0
125 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Excavation of Pipe Trenches in different location for Testing of Rising main pipe line under Bally Jagacha (PH-I) Water supply Project in Bally Jagacha Block under Howrah Sadar Sub- Division, P.H.E. Dte. AE HQ 1869/HD 12/09/2022 10 S.B. ENTERPRISE 2.01 2.01 0
126 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Material Requisition To Resource Division 2375/HD 24/12/2021 0 Resource Division 16.50 0.00 0
127 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Material Requisition To Resource Division 435/HD 28/02/2022 0 Resource Division 21.45 0.00 0
128 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Bally Jagacha Phase -I 20/01/2023 0 EASTERN RAILWAY, HOWRAH DIVISION 15.58 0.00 0
129 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Railway Permission BP-2022-23-624 30/03/2023 0 EASTERN RAILWAY, HOWRAH DIVISION 11.93 0.00 0
130 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting National Test House BP-2022-23-691 16/03/2023 0 NATIONAL TEST HOUSE 0.09 0.00 0
131 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Sample Test 24/03/2023 0 NATIONAL TEST HOUSE 0.09 0.00 0
132 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Eastern Railway, Howrah Division BP-2021-22-623 30/03/2023 0 EASTERN RAILWAY, HOWRAH DIVISION 1.11 0.00 0
133 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting 1. Clear water rising main from GLR to different Zonal OHR, 2. Laying distribution system of piped water supply at (Zone-VI) and 3. Construction of Administrative Building, Store & Stack Yard at Domjur Boosting Station for surface water based water supply scheme for Bally-Jagacha (Phase-II) under Howrah Division, P.H.E. Dte. JE Sadar 1597/HD 09/11/2020 540 SUBHASH BOSE 59.58 0.00 50
134 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for providing Functional Household Tap Connection(FHTC) from existing distribution system at uncovered areas of Durgapur Abhoynagar-1 & 2 Gram Panchyet under bally Jagachha Block under Howrah Division, PHE Dte.(Part-2) AE HQ,Assistant Engineer/IU III je1_iu 1051/HD 15/03/2023 60 SONAR BANGLA ENTERPRISE 6.71 0.00 70
135 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying of Distribution system at Narna mouza under Bally Jagacha (Ph-II) Surface based Water Supply Scheme at Domjur Block under Howrah Division, P.H.E. Dte. AE HQ JE Sadar 4468/HD 12/12/2023 30 PBA INFRASTRUCTURE 11.44 0.00 100
136 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying of Distribution system for uncovered areas at Boluhati mouza(Booth no-7,8,9), under Bally Jagacha (Ph-II) Surface based Water Supply Scheme at Domjur Block under Howrah Division, P.H.E. Dte. AE HQ Junior Engineer 4577/HD 18/12/2023 30 CONSTRUCTION CORNER 10.25 0.00 0
137 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Hiring of 1 (One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer (HQ), Howrah Division, PHE Dte. Government of West Bengal (for the period from 01/10/2023 to 30/11/2023) AE HQ 3482/HD 29/09/2023 61 SUMANTA DEY 0.79 0.00 100
138 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Hiring of 1 (One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer for Bally-Jagacha Surface Based Piped Water Supply Scheme. Government of West Bengal (from 01/01/2024 to 31/03/2024) under Howrah Division, PHE Dte. Assistant Engineer/IU III 4765/HD 29/12/2023 91 INDRAJIT GHOSAL 0.98 0.00 50
139 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1 (One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer (HQ), Howrah Division, PHE Dte. Government of West Bengal (for the period from 01/12/2023 to 31/01/2024) AE HQ 4303/HD 30/11/2023 62 SUMANTA DEY 0.79 0.00 100
140 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Hiring of 1(One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer (HQ), Howrah Division, PHE Dte. Government of West Bengal (for three months from 01/02/2024 to 30/04/2024).¿ under Howrah Division, PHE Dte. AE HQ 421/HD 31/01/2024 90 SUMANTA DEY 1.00 0.00 20
141 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Construction of Retaining Wall at Narna Zone-V OHR Site under Bally Jagacha(phase-II) surface Based water supply project under Howrah Division, P.H.E. Dte. AE HQ 3463/HD 02/08/2024 30 GUPTA ENTERPRISE 4.76 0.00 0
142 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Construction of Chlorination Room (5.5m x 4.5m) at Narna Zone-V OHR Site under Bally Jagacha(Phase-2) Surface Based water supply project under Howrah Division, P.H.E. Dte. AE HQ 4833/HD 20/11/2024 45 GUPTA ENTERPRISE 4.85 0.00 0
143 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Construction of Guard Room with WC (4.35m X 3.60m) at Narna Zone-V OHR Site under Bally Jagacha(Ph-II) Surface Based water supply project under Howrah Division, P.H.E. Dte. AE HQ 4834/HD 20/11/2024 45 GUPTA ENTERPRISE 4.85 0.00 0
144 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying Distribution Pipeline For Uncovered area at Jotgiri (Zone-I) of Bally-Jagaccha Surface based Water Supply Scheme (Phase-II) under Howrah Division PHE Dte. AE HQ je_blk_ballyjag_how 1244/HD 12/03/2024 45 COSMO ENTERPRISE 28.36 0.00 80
145 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying Distribution Pipeline For Uncovered area at Zone-VII (Salap-2 GP) of Bally-Jagaccha Surface based Water Supply Scheme (Phase-II) under Howrah Division PHE Dte. AE HQ je_blk_ballyjag_how,JE Sadar 1133/HD 06/03/2024 60 UNIVERSAL CONSTRUCTION 38.43 0.00 90
146 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Hiring of 1 (One) no. Diesel cab having contact permit from regional transport authority for office use of the Executive Engineer, Howrah Division, Government of West Bengal (for two months from 01/02/2024 to 31/03/2024) AE HQ je2_how 420/HD 31/01/2024 60 AVINABA ENGINEERING CONCERN 0.79 0.00 0
147 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1 (One) no. Diesel cab having contact permit from regional transport authority for office use of the Executive Engineer, Howrah Division, Government of West Bengal (for two months from 01/04/2024 to 31/05/2024) AE HQ je2_how 1672/HD 28/03/2024 61 AVINABA ENGINEERING CONCERN 0.79 0.00 0
148 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Hiring of 1(One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer for Bally-Jagacha Surface Based Piped Water Supply Scheme. Government of West Bengal (for three months from 01/04/2024 to 30/06/2024) under Howrah Division, PHE Dte. AE HQ,Assistant Engineer/IU III je2_pdd1 1363/HD 15/03/2024 91 MD KADIR 0.99 0.00 0
149 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1(One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer for Bally-Jagacha Surface Based Piped Water Supply Scheme. Government of West Bengal (for three months from 01/07/2024 to 30/09/2024) under Howrah Division, PHE Dte. AE HQ,Assistant Engineer/IU III je2_pdd1 2924/HD 27/06/2024 92 MD KADIR 1.00 0.00 0
150 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1 (One) no. Diesel cab having contact permit from regional transport authority for office use of the Executive Engineer, Howrah Division, Government of West Bengal (for two months from 01/08/2024 to 30/09/2024) AE HQ je2_how 3362/HD 30/07/2024 61 AVINABA ENGINEERING CONCERN 0.79 0.00 0
151 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1(One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer (HQ), Howrah Division, PHE Dte. Government of West Bengal (for three months from 01/08/2024 to 31/10/2024) under Howrah Division, PHE Dte. AE HQ 3379/HD 30/07/2024 92 SUMANTA DEY 1.00 0.00 0
152 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1(One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer (HQ), Howrah Division, PHE Dte. Government of West Bengal (for three months from 01/05/2024 to 31/07/2024) under Howrah Division, PHE Dte. AE HQ 2219/HD 30/04/2024 90 SUMANTA DEY 1.00 0.00 0
153 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1 (One) no. Diesel cab having contact permit from regional transport authority for office use of the Executive Engineer, Howrah Division, Government of West Bengal (for two months from 01/06/2024 to 31/07/2024) AE HQ je2_how 2566/HD 30/05/2024 61 AVINABA ENGINEERING CONCERN 0.79 0.00 0
154 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Construction of partition wall and Earth filling in passage at Narna Zone-V OHR Site under Bally Jagacha(phase-II) surface Based water supply project under Howrah Division, P.H.E. Dte. AE HQ 3464/HD 02/08/2024 30 GUPTA ENTERPRISE 4.48 0.00 0
155 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Providing Functional Household Tap Connection(FHTC) from existing distribution system at Chakpara Gram panchyet under Bally Jagachha Block under Howrah Division, PHE Dte. (Part-F) No. of House Hold(Approx)=5000 nos. AE HQ 1314/HD 24/06/2021 45 MAHAVIR PUMPS MFG.PVT.LTD 110.86 153.79 100
156 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Survey & collection of household details through mobile app and geo tagging (JJM entry) of the same of water tap connection in each household from existing distribution system at Duegapur-Abhoynagar-I Gram Panchayet under Bally Jagacha Block under Howrah Division PHE Dte (Part-C) No of Household (Approx)= 4000 nos AE HQ 2386/HD 27/12/2021 30 GHOSH CONCERN 1.98 0.00 100
157 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Sinking of 2 (two) nos PVC big dia Tube well 300 mm x 200 mm dia of 240 mtr deep near i)Bally Ghosh Para OHR Site Zone-6A & ii)Jagadishpur OHR Site Zone-14 under BallyJagacha Surface Based W/S scheme (Phase-I) under Howrah Division P.H.E Dte. AE HQ je2_pdd1 1596/HD 01/08/2022 30 MUNSHI ENTERPRISE 24.54 0.00 30
158 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Construction of Pump House (5.40m x 3.60 m) at Tube Well Site of Chakpara Anandanagar Football Ground under Bally Jagacha surface based Water Supply scheme(Phase-1) under Howrah Division, P.H.E. Dte. Assistant Engineer/IU III je2_pdd1 571/HD 13/02/2023 60 MAITY CONSTRUCTIONS 5.82 0.00 100
159 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Providing Functional Household Tap Connection(FHTC) from existing distribution system at uncovered areas of Durgapur Abhoynagar-1 & 2 Gram panchyet under bally jagachha Block under Howrah Division, PHE Dte.(Part-1) AE HQ je1_iu 1050/HD 15/03/2023 90 M/S SUPROVAT GHOSH 6.75 0.00 100
160 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Laying distribution system in the uncovered areas of Surface Based Water Supply Project for Bally-Jagacha Block, under HowrahDivision,PHEDte. (D.A-1G.PArea) Zone-5 AE HQ 1707/HD 24/04/2023 10 S.B. ENTERPRISE 0.85 0.00 100
161 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Carrying charges office CE Office (HQ) NS Building to Bally WTP Site & WTP Site to Howrah Division office under Howrah Division, PHE Dte. AE HQ 1708/HD 24/04/2023 7 MENOKA ENGINEERING WORKS 0.82 0.00 100
162 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Work Order for Adopting Jack Pushing of 813 mm Dia 10 mm thick M.S pipe as Casing to Cross Water carrier Pipe on Tentulkuli rail crossing work of Bally Jagacha (PH-II) Surface Water Supply Scheme under Howrah Division P.H.E. Dte. AE HQ 1963/HD 11/05/2023 45 SUBHASH BOSE 95.69 0.00 100
163 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Development of Road at Pakuria OHR in Zone-VI under Bally Jagacha (PH-II) Surface water supply scheme under Howrah Division, PHE Dte. AE HQ 2818/HD 03/08/2023 15 M/S HOWRAH CONSTRUCTION 0.86 0.00 100
164 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation Order for Hiring of 1 (One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer for Bally-Jagacha Surface Based Piped Water Supply Scheme Government of West Bengal (for two months from 01/11/2023 to 31/12/2023) under Howrah Division, PHE Dte.. Assistant Engineer/IU III 3902/HD 30/10/2023 61 INDRAJIT GHOSAL 0.52 0.00 50
165 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying of Distribution system at uncovered areas of Daffarpur mouza(part no-18/19) under Bally Jagacha (Ph-II) Surface based Water Supply Scheme at Domjur Block under Howrah Division, P.H.E. Dte. AE HQ Junior Engineer 4437/HD 08/12/2023 30 USHA CONCERN 10.34 0.00 100
166 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Wall writing IEC message along with logo picture etc. of multiple colour as will be supplied by the PHE Dte. On smooth durable wall surface preferably of Govt. premises boundary wall under Bally Jagacha Block of Howrah Sadar Sub Division under Howrah Division PHE Dte. AE HQ je_blk_ballyjag_how 845/HD 22/02/2024 15 M&M GRAPHICS 2.04 0.00 100
167 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Restoration of damaged concrete roads due to laying of pipe line at Salap 1 & 2 GP of Bally-Jagacha surface based water supply scheme Phase-II under Howrah Division PHE Dte. (Part-B). AE HQ je_blk_ballyjag_how,Junior Engineer 1316/HD 14/03/2024 60 BISWAJIT SAMANTA 10.99 0.00 100
168 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying Distribution Pipeline For Uncovered area at Lakshmanpur (Zone-I) of Bally-Jagaccha Surface based Water Supply Scheme (Phase-II) under Howrah Division PHE Dte. AE HQ je_blk_ballyjag_how 1154/HD 07/03/2024 226 SAIKAT ENTERPRISE 31.51 0.00 100
169 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Material Requisition To Resource Division 467/HD 02/02/2024 0 Resource Division 5.18 0.00 0
170 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Material Requisition To Resource Division 134/HD 10/01/2024 0 Resource Division 12.94 0.00 0
171 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Material Requisition To Resource Division 467/HD 02/02/2024 0 Resource Division 1.49 0.00 0
172 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Material Requisition To Resource Division 3594/HD 13/08/2024 0 Resource Division 5.64 0.00 0
173 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Material Requisition To Resource Division 467/HD 02/02/2024 0 Resource Division 2.19 0.00 0
174 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1(One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer for Bally-Jagacha Surface Based Piped Water Supply Scheme. Government of West Bengal (for three months from 01/10/2024 to 31/12/2024) under Howrah Division, PHE Dte. Assistant Engineer/IU III je2_pdd1 4365/HD 30/09/2024 92 MD KADIR 1.00 0.00 0
175 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Special repairing for Distribution system and brusting of rising main at Lakshmanpur, Jotgiri & Narna of Bally-Jagaccha Surface based Water Supply Scheme (Phase-II) under Howrah Division PHE Dte. AE HQ je_blk_ballyjag_how 3465/HD 02/08/2024 15 COSMO ENTERPRISE 3.91 0.00 100
176 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Field level data validation of FHTC for error free database in different Pipe Water Supply Scheme under Bally Jagachha and Domjur Block in the District of Howrah under the jurisdiction of Howrah Division, PHE Dte. AE HQ je_blk_ballyjag_how 4817/HD 19/11/2024 120 TECH VISION 0.82 0.00 79
177 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1 (One) no. Diesel cab having contact permit from regional transport authority for office use of the Executive Engineer, Howrah Division, Government of West Bengal (for two months from 01/12/2024 to 31/01/2025) AE HQ je2_how 4960/HD 29/11/2024 62 AVINABA ENGINEERING CONCERN 0.79 0.00 0
178 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1(One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer for Bally-Jagacha Surface Based Piped Water Supply Scheme. Government of West Bengal (for three months from 01/01/2025 to 31/03/2025) under Howrah Division, PHE Dte. Assistant Engineer/IU III je2_pdd1 5417/HD 30/12/2024 90 MD KADIR 1.00 0.00 0
179 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1 (One) no. Diesel cab having contact permit from regional transport authority for office use of the Executive Engineer, Howrah Division, Government of West Bengal (for two months from 01/10/2024 to 30/11/2024) AE HQ je2_how 4188/HD 26/09/2024 61 AVINABA ENGINEERING CONCERN 0.79 0.00 0
180 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1(One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer for Bally-Jagacha Surface Based Piped Water Supply Scheme. Government of West Bengal (for three months from 01/04/2025 to 30/06/2025) under Howrah Division, PHE Dte. AE HQ,Assistant Engineer/IU III je2_pdd1 1627/HD 26/03/2025 91 MD KADIR 1.00 0.00 0
181 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1(One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer (HQ), Howrah Division, PHE Dte. Government of West Bengal (for three months from 01/11/2024 to 31/01/2025) under Howrah Division, PHE Dte. AE HQ 4627/HD 30/10/2024 92 SUMANTA DEY 1.00 0.00 0
182 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1(One) no. Inspection vehicle (BS-III/IV) (Commercial) car under the disposal of the Assistant Engineer (HQ), Howrah Division, PHE Dte. Government of West Bengal (for three months from 01/02/2025 to 30/04/2025) under Howrah Division, PHE Dte. AE HQ 699/HD 30/01/2025 90 SUMANTA DEY 0.99 0.00 0
183 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1 (One) no. Diesel cab having contact permit from regional transport authority for office use of the Executive Engineer, Howrah Division, Government of West Bengal (for two months from 01/02/2025 to 31/03/2025) AE HQ je2_how 640/HD 28/01/2025 59 AVINABA ENGINEERING CONCERN 0.79 0.00 0
184 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Continuation order for Hiring of 1 (One) no. Diesel cab having contact permit from regional transport authority for office use of the Executive Engineer, Howrah Division, Government of West Bengal (for two months from 01/04/2025 to 31/05/2025) AE HQ je2_how 1626/HD 26/03/2025 61 AVINABA ENGINEERING CONCERN 0.79 0.00 0
185 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying of Distribution system at uncovered areas of Pipli & Gayespur mouza under Bally Jagacha (Ph-II) Surface based Water Supply Scheme at Domjur Block under Howrah Division, P.H.E. Dte. AE HQ je_blk_ballyjag_how 4363/HD 05/12/2023 135 SAIKAT ENTERPRISE 14.49 0.00 100
186 HOWRAH Howrah Division Summary of Capital cost for Function house hold tap connection FHTC and remainng laying distribution system in the uncovered areas of Surface Water Based Water Supply Project for Bally Jagacha Block (Phase-I) , SM/08582 Retrofitting Laying Distribution Pipeline For Uncovered area at Zone-IV of Bally-Jagaccha Surface based Water Supply Scheme (Phase-II) under Howrah Division PHE Dte. AE HQ je_blk_ballyjag_how 2892/HD 26/06/2024 240 S.B ENTERPRISE 17.22 0.00 100
Total 2,536.831,041.10 