Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Showing 1 to 5 of 5 entries
Sl No.District
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrustedName of JE entrustedWO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 150.8688.95 
Sl No.
District
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted
Name of JE entrusted
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5
150.86
88.95
 
Total
150.85
88.95
 
1 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Chowlpur & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07713 Retrofitting Providing Functional House Hold Tap Connection and allied works at Chowlpur, Ghoradaria and Mitpukuria Mouzas of Barasat- II Block from Chowlpur Ground Water Supply Scheme under "Jal swapna" programme under Barasat Arsenic Division PHE, Dte. (Phase-I) Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer 561/B.Ar.D. 26/02/2021 90 SANJUKTA ENGINEERS 126.29 88.95 1
2 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Chowlpur & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07713 Retrofitting Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Chowlpur & its adjoining mouza water supply scheme in Barasat -II Block of North 24 Pargana District under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer 1698/B.Ar.D 30/09/2021 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 6.07 0.00 1
3 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Chowlpur & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07713 Retrofitting Repairing and Renovation of 02 (two) nos pump house and 01 (one) No I.E.P room, and allied works at the site of Chowlpur W/S Scheme under Jal Swapna Programme at Barasat-II block, North 24 Pgs. district under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer 2217/B.Ar.D 24/12/2021 30 CHOWDHURY CONSTRUCTION 9.60 0.00 1
4 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Chowlpur & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07713 Retrofitting Eucalyptus bullah pilling, drum sheet walling including earth filling (approx. 50 mtr length) for protection of different dia UPVC/HDPE Pipeline near two ponds at Ghoradaria opposite Gour Biswas house and at Malrameswarpur Sardarhati opposite Pranab Sarkar house under Chowlpur W/S Scheme at Barasat- II block under JAL SWAPNA Programme under Barasat Arsenic Division, PHE Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer 288/B.Ar.D 23/02/2022 20 CHOWDHURY CONSTRUCTION 4.26 0.00 1
5 NORTH 24 PARGANAS Barasat Arsenic Division Retrofitting of Chowlpur & its adj. mouzas water supply scheme for providing Functional House Tap Connection (Phase-I) , SM/07713 Retrofitting Renovation of Pathway and Painting of boundary wall and other allied works at Chowlpur Head Work Site under Chowlpur Water Supply scheme of Barasat ll Block under JAL SWAPNA Programme under Barasat Arsenic Division, P.H.E. Dte. Assistant Engineer, HQ-II, Barasat Arsenic Division Junior Engineer 484/B.Ar.D 16/03/2022 15 MODERN CONSTRUCTIONS 4.64 0.00 1
Total 150.8588.95 
Showing 1 to 5 of 5 entries