1 |
NADIA |
Nadia Division |
Retrofitting of Providing FHTC at Ground Water based Ber Ramchandrapur Zone-I Water Supply Scheme within Karimpur-I Block (Phase-1) , SM/07492 |
Retrofitting |
Providing functional household tap connection (Part) including supply of 15mm dia PVC pipe of average length of 15 m, 10mm dia Gun-Metal Ferrule, Saddle piece (as required size) 15mm dia Bib cock etc. all complete from Ber Ramchandrapur Zone-I W/S scheme (Phase-I) of Rectrofitting in Nadia District under Nadia Division P.H.E. Dte. |
Assistant Engineer |
|
59/ND |
07/01/2021 |
75 |
JOY HIND TUBEWELL'S |
55.08 |
1.98 |
100 |